Federal Contractor Profile
Affiliated Engineers INC
$46M obligated·80 awards·5 agencies·1 NAICS
Federal Contracts
Showing award actions 101–138 of 138 funded award actions, most recent first.
- Contracts with positive obligations
- 80
- Funded award actions shown
- 138
- Obligations shown
- $46M
- Awarding agencies
- 5
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of October 21, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Apr 5, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC022F0029 | 541330 | DESIGN OF LAUNCH CONTROL CENTER (LCC) / VEHICLE ASSEMBLY BUILDING (VAB) HEATING VENTILATION AIR CONDITIONING (HVAC) REPLACEMENT | $1.4M |
| Jan 27, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC020F0176 | 541330 | DESIGN OF UPGRADE MECHANICAL SYSTEMS, COMPONENT REFURBISHMENT&CHEMICAL ANALYSIS (CRCA) FACILITY AT KSC, FL PROJECT CONTROL NUMBER (PCN): 99256 | $624K |
| Jan 18, 2022 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99022F00001 | 541330 | C112601 T10B HUMIDIFIER DESIGN ANALYSIS: DESIGN SERVICES - KEEGAN KINNEY - PERIOD OF PERFORMANCE: 1/6/2022 - 2/25/2022 NTP/NTE ISSUED 1/6/2022 | $44K |
| Nov 30, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00001 | 541330 | C109094 - PROFESSIONAL SUPPORT FOR ASEPTIC PROCESSING FACILITIES (APF) | $48K |
| Nov 24, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00009 | 541330 | C111195 CONVERTING STANDARD PEDIATRICS PATIENT ROOMS INTO PROTECTIVE ENVIRONMENT (PE) HEPA FILTRATION ROOMS IN BUILDING 10/CRC/1NW AREA. | $42K |
| Nov 19, 2021 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0156 | 541330 | REVISE VARIOUS UNIFIED FACILITIES GUIDE SPECIFICATIONS, MECHANICAL, ELECTRICAL AND PLUMBING AT KSC, FL, | $100K |
| Sep 29, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00011 | 541330 | C112365 PROVIDE TECHNICAL CONTENT, REQUIREMENTS AND RATIONALE FOR THE UPDATE OF DRM CHAPTER 7 BUILDING AUTOMATION SYSTEMS (BAS). | $40K |
| Sep 24, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00004 | 541330 | C109351 - PERFORM PROGRAM STUDY - RICK ROBEY | $69K |
| Sep 22, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00010 | 541330 | A/E BUILDING 105 EMERGENCY CHILLED WATER GENERATION | $282K |
| Sep 17, 2021 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0182 | 541330 | DEVELOPMENT OF A BRIDGING DOCUMENT FOR INSTALL AREA WARNING SYSTEM (AWS) AT PROPELLANTS SERVICING AREA (PSA) AT KENNEDY SPACE CENTER (KSC), FL PROJECT CONTROL NUMBER (PCN): 98968 | $115K |
| Sep 15, 2021 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0161 | 541330 | CONDUCT CONSTRUCTABILITY REVIEW OF ROTATIONAL PROCESSING & SURGE FACILITY (RPSF) FIRE PROTECTION UPGRADE AT KSC, FL | $49K |
| Aug 25, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00003 | 541330 | C108552 - BUILDING 11 CENTRAL UTILITY PLANT (CUP COOLING TOWER BLOWDOWN WATER ION EXCHANGE TREATMENT PROGRAM | $14K |
| Aug 20, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00009 | 541330 | C111195 CONVERTING STANDARD PEDIATRICS PATIENT ROOMS INTO PROTECTIVE ENVIRONMENT (PE) HEPA FILTRATION ROOMS IN BUILDING 10/CRC/1NW AREA. | $106K |
| Aug 19, 2021 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0156 | 541330 | REVISE VARIOUS UNIFIED FACILITIES GUIDE SPECIFICATIONS, MECHANICAL, ELECTRICAL AND PLUMBING AT KSC, FL, | $176K |
| Jul 27, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00008 | 541330 | C111195 - FEASIBILITY STUDY FOR IMPLEMENTING HEPA FILTRATION TO 6 PATIENT CARE ROOMS IN 1NW, BUILDING 59, ASHISH PANDIT [21-003688] | $12K |
| Jun 28, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00006 | 541330 | C103754 - BLDG. 40A VRC - CONSTRUCTION QUALITY MANAGEMENT (CQM) SERVICES CONTRACT - MAYA KAI-KAI | $4.8M |
| Jun 4, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00005 | 541330 | C108961 - CONDUCT AN A/E HVAC STUDY TO DETERMINE ADEQUACY OF SUPPLY AND EXHAUST AIR FOR NIAID LABS IN BLDG 10 B-WING, RICK ROBEY [21-001335] | $155K |
| May 3, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00004 | 541330 | C109351 - PERFORM PROGRAM STUDY - RICK ROBEY | $295K |
| Mar 25, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00002 | 541330 | C109234 - FEASIBILITY STUDY OF CONVERTING BLS2 SPACE INTO FULL BSL3 TISSUE CULTURE LAB ON THE 5TH FLOOR IN BLDG 10, ALI GARDEZI | $50K |
| Feb 24, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00003 | 541330 | C108552 - BUILDING 11 CENTRAL UTILITY PLANT (CUP COOLING TOWER BLOWDOWN WATER ION EXCHANGE TREATMENT PROGRAM | $127K |
| Jan 27, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00002 | 541330 | C109234 - FEASIBILITY STUDY OF CONVERTING BLS2 SPACE INTO FULL BSL3 TISSUE CULTURE LAB ON THE 5TH FLOOR IN BLDG 10, ALI GARDEZI | $69K |
| Dec 7, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99021F00001 | 541330 | C109094 - PROFESSIONAL SUPPORT FOR ASEPTIC PROCESSING FACILITIES (APF) | $146K |
| Sep 28, 2020 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC020F0176 | 541330 | DESIGN OF UPGRADE MECHANICAL SYSTEMS, COMPONENT REFURBISHMENT&CHEMICAL ANALYSIS (CRCA) FACILITY AT KSC, FL PROJECT CONTROL NUMBER (PCN): 99256 | $751K |
| Aug 19, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99020F00004 | 541330 | C101700 - A/E SERVICES - CRC VFD REPLACEMENT, BLDG 10, MICHAEL OPPELT | $116K |
| Aug 17, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99020F00003 | 541330 | C108366 - BLDG 108, STUDY TO IDENTIFY STEAM HEATING DEFICIENCIES AND PROVIDE ALTERNATIVES | $47K |
| Jun 8, 2020 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC020F0098 | 541330 | DESIGN AND OTHER PROFESSIONAL SERVICES NECESSARY TO REHABILITATE, MODERNIZE, AND DEVELOP NEW OR EXISTING MECHANICAL SYSTEMS FOR FACILITIES AND GROUND SUPPORT SYSTEMS THROUGH A REGIONALIZED MULTIPLE AWARD | $1K |
| May 13, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99020F00002 | 541330 | C108982 - COVID-19 FEASIBILITY STUDY - ANALYSIS | $57K |
| Mar 27, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99020F00002 | 541330 | C108982 - COVID-19 FEASIBILITY STUDY - ANALYSIS | $75K |
| Mar 28, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00084 | 541330 | C107572 - ENGINEERING SERVICES TO GRAPHICALLY DOCUMENT THE STEAM, CONDENSATE AND CHILLED WATER SYSTEM, BLDG. 10 | $95K |
| Jun 27, 2018 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | NNK16CA26T | 541330 | IGF::OT::IGF ARCHITECTURE&ENGINEERING (A&E); ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF INSTALL LIQUID SEPARATOR, LC39B; PROJECT CONTROL NUMBER 99015. | $14K |
| Feb 27, 2018 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | NNK15CA53T | 541330 | IGF::OT::IGF ARCHITECTURE AND ENGINEERING (A&E) - SERVICES DURING THE CONSTRUCTION OF LAUNCH EQUIPMENT SHOP (LES) HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) UPGRADE AND THE OPERATIONS AND CHECKOUT BLDG (O&C) BLDG AIR HANDLING UNIT (AHU)16 REPLACEMENT | $19K |
| Jan 31, 2018 | Department of Veterans Affairs261-NETWORK CONTRACT OFFICE 21 (36C261) | VA70113J0103 | 541330 | IGF::OT::IGF VISN 21 ARCHITECT AND ENGINEERING SERVICES INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT FOR DESIGN AND ENGINEERING WORK FOR VISN 21 MEDICAL CENTER FACILITIES. | $2K |
| Dec 12, 2017 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | NNK16CA26T | 541330 | IGF::OT::IGF ARCHITECTURE&ENGINEERING (A&E); ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF INSTALL LIQUID SEPARATOR, LC39B; PROJECT CONTROL NUMBER 99015. | $30K |
| Aug 18, 2017 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | NNK16CA26T | 541330 | IGF::OT::IGF ARCHITECTURE&ENGINEERING (A&E); ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF INSTALL LIQUID SEPARATOR, LC39B; PROJECT CONTROL NUMBER 99015. | $63K |
| May 22, 2017 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | NNK16CA26T | 541330 | IGF::OT::IGF ARCHITECTURE&ENGINEERING (A&E); ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF INSTALL LIQUID SEPARATOR, LC39B; PROJECT CONTROL NUMBER 99015. | $8K |
| Apr 20, 2017 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | NNK16CA26T | 541330 | IGF::OT::IGF ARCHITECTURE&ENGINEERING (A&E); ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF INSTALL LIQUID SEPARATOR, LC39B; PROJECT CONTROL NUMBER 99015. | $6K |
| Dec 23, 2016 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | NNK15CA53T | 541330 | IGF::OT::IGF ARCHITECTURE AND ENGINEERING (A&E) - SERVICES DURING THE CONSTRUCTION OF LAUNCH EQUIPMENT SHOP (LES) HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) UPGRADE AND THE OPERATIONS AND CHECKOUT BLDG (O&C) BLDG AIR HANDLING UNIT (AHU)16 REPLACEMENT | $45K |
| May 6, 2016 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | NNK16CA26T | 541330 | IGF::OT::IGF ARCHITECTURE&ENGINEERING (A&E); ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF INSTALL LIQUID SEPARATOR, LC39B; PROJECT CONTROL NUMBER 99015. | $261K |
Get Alerted Before Affiliated Engineers INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free