Federal Contractor Profile
Alphacore INC
Federal contracting record: $49M obligated across 122 awards from 3 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
CXMPDDLFBCH3
CAGE Code
6SUZ5
Address
398 SOUTH MILL AVE, SUITE 304, TEMPE, AZ, 852812840
First Federal Award
Apr 5, 2016
Most Recent Award
Jul 22, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Defense$34M
69.4% of total obligations
- National Aeronautics and Space Administration$13M
27.2% of total obligations
- Department of the Interior$1.7M
3.4% of total obligations
Top NAICS Activity
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Sep 15, 2026 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | SBIR PHASE I VIPER-S (VERSATILE IMAGER PLATFORM WITH ENHANCED RADIATION HARDNESS - STACKED) | $225K |
| May 5, 2026 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | 541715 | SBIR/STTR PHASE II R&D RADIATION HARDENED BY DESIGN (RHBD) ELECTRONICS BASED ON ON-SHORE 22NM FINFET TECHNOLOGY | $10K |
| Jan 16, 2026 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | 541715 | SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER. | $500 |
| Oct 15, 2025 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | 541715 | RESEARCH AND DEVELOPMENT | $146K |
| Sep 29, 2025 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | SBIR I ASYNCHRONOUS STAR-TRACKER FOR REAL-TIME HIGH-SPIN ATTITUDE CONTROL | $156K |
| Sep 29, 2025 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | STTR PHASE I NOVEL IMAGING TECHNOLOGIES FOR OPTIMIZED LUNAR SURFACE NAVIGATION | $156K |
| Sep 29, 2025 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | SBIR I RAD-HARD ELECTRONIC CONTROL AND POWER INTEGRATED CIRCUIT FOR STIRLING-BASED RADIOISOTOPE POWER SYSTEM | $156K |
| Aug 1, 2025 | Department of DefenseNAVAL SURFACE WARFARE CENTER | 541715 | 873AUTHORITY | $140K |
| Jul 24, 2025 | Department of DefenseFA2541 SSC COMRCL SVS OFC SSC CMK | 541715 | SBIR PHASE II: F2-19001 - SF241-0021 HIGH SPEED OPTICAL INTERCONNECTS FOR EFFICIENT INTRA-SATELLITE DATA TRANSFER IN THE SPACE ENVIRONMENT. | $1.8M |
| Jul 21, 2025 | Department of DefenseDEFENSE MICROELECTRONICS ACTIVITY | 541715 | 25-5D2 STTR PHASE I - 3.3/5V CONFIGURABLE LOGIC ASIC: E25D-001-0016 | $199K |
| Jul 14, 2025 | Department of DefenseW27P USA ACQ SPT CTR | 541715 | SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE I, TOPIC A254-015, ADAPTIVE FILTERING TECHNIQUES FOR LOW-COST RF EMITTERS | $250K |
| Jun 18, 2025 | Department of DefenseNAVSEA HQ | 541713 | KICKOFF BRIEFING | $140K |
| Apr 30, 2025 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | 541715 | RESEARCH AND DEVELOPMENT | $500K |
| Mar 31, 2025 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | 541715 | RESEARCH AND DEVELOPMENT | $1000K |
| Jan 14, 2025 | Department of DefenseW27P USA ACQ SPT CTR | 541715 | PHASE I SBIR TOPIC A244-061. 873 AUTHORITY. | $250K |
| Oct 2, 2024 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | 541715 | SBIR PHASE 1 PROPOSAL 242-0005-0386 FOR MOBILE INTELLIGENT RADIOMETRIC EVALUATION LAB (MIREL) | $54 |
| Sep 30, 2024 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | 541715 | SBIR PHASE 1 PROPOSAL 242-0005-0386 FOR MOBILE INTELLIGENT RADIOMETRIC EVALUATION LAB (MIREL) | $180K |
| Sep 19, 2024 | Department of DefenseFA8649 USAF SBIR STTR CNTRCTNG AFRL | 541715 | RAD-HARD NEUROMORPHIC INFRARED IMAGER | $1.2M |
| Aug 15, 2024 | Department of DefenseFA2541 SSC COMRCL SVS OFC SSC CMK | 927110 | ALPHACORE WILL DEVELOP A RADIATION HARDENED OPTICAL I/O LINK FOR INTRA-SATELLITE COMMUNICATIONS. | $180K |
| Jul 29, 2024 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | FY24 SBIR PHASE I- VIPER: VERSATILE IMAGER PLATFORM WITH ENHANCED RADIATION HARDNESS | $156K |
| Jul 27, 2024 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | FY24 PHASE II - RADIATION HARDENED, PROGRAMMABLE BATTERY ANALOG FRONT-END ASIC | $900K |
| Jul 27, 2024 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | FY24 SBIR PHASE II - SCALABLE DATA ACQUISITION SYSTEM FOR MKID DETECTORS | $896K |
| Jul 27, 2024 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | FY24 SBIR PHASE II - RADIATION-HARDENED WIDE-TEMPERATURE MIXED-SIGNAL LIBRARY IN A 22NM FDSOI CMOS PROCESS | $900K |
| Jul 27, 2024 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 541715 | FY24 SBIR PHASE II - RADIATION-TOLERANT, HIGH-VOLTAGE BIDIRECTIONAL DC-DC CONVERTER PMIC | $900K |
| Jul 19, 2024 | Department of DefenseFA9101 AEDC PKP PROCRMNT BR | 541715 | SBIR 24.1A PHASE I - SPACE FORCE PROPOSAL TOPIC SF241-0022-0580 - HIGH-SPEED NIR-MWIR IMAGER FOR TARGET CHARACTERIZATION (ALPHACORE, INC.) | $180K |
Want to win work like Alphacore INC?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.