Home/Contractors/Architecture Technology INC/contracts

Federal Contractor Profile

Architecture Technology INC

$97M obligated·142 awards·5 agencies·9 NAICS

Federal Contracts

Showing contracts 151200 of 311 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jul 30, 2019National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC18F0193541712EFFECTIVENESS OF ALTERNATE CONCEPTS TO CONTEMPORARY DEVELOPMENT ASSURANCE PROCESSES: THIS RESEARCH WILL FOCUS ON GENERAL AVIATION (GA) AIRCRAFT AND ROTORCRAFT (STANDARD AIRWORTHINESS CERTIFICATION REGULATIONS PART 23, PART 27); HOWEVER, BECAUSE OF INCREASING DESIGN COMPLEXITY OF SOME GA AIRCRAFT, ASSURANCE APPROACHES DEVELOPED OR EVALUATED THROUGH THIS RESEARCH MAY ALSO BE APPLICABLE TO THEIR TRANSPORT CATEGORY COUNTERPARTS (PART 25, PART 29). THE SCOPE OF THIS TASK IS THE SYSTEM SAFETY ASSESSMENT (SSA), DISCUSSED IN AEROSPACE RECOMMENDED PRACTICE (ARP) 4754A [4] (SECTION 5.1), AND ELABORATED WITHIN ARP 4671 [5], AND DOES NOT EXTEND INTO HARDWARE [6] AND SOFTWARE [7] ITEM-LEVEL ASSURANCE. WHILE THIS SCOPE ASSUMES THAT THE SAFETY ASSESSMENT IS GROUNDED IN HAZARDS ANALYSIS STARTING WITH TOP-LEVEL AIRCRAFT FUNCTIONS, THE RESEARCH IS NOT CONSTRAINED TO THE METHODOLOGY DEFINED IN THE ARP DOCUMENTS. FOR INSTANCE, ALTERNATE APPROACHES TO CONDUCTING THE FUNCTIONAL HAZARD ANALYSIS (FHA), SUCH AS THE APPLICATION OF STPA (SYSTEM-THEORETIC PROCESS ANALYSIS) [8], MAY BE PROPOSED AS THE HAZARDS ANALYSIS APPROACH. THE OBJECTIVES OF THIS TASK ORDER ARE TO IDENTIFY, DEMONSTRATE, AND EVALUATE THE EFFICACY OF ALTERNATE ASSURANCE CONCEPTS FOR ACCEPTING THE INTRODUCTION OF NEW TECHNOLOGIES INTO EXISTING AIRBORNE SYSTEM ARCHITECTURES, AND TO IDENTIFY, DEMONSTRATE, AND EVALUATE THE EFFICACY OF ALTERNATE ASSURANCE CONCEPTS FOR ESTABLISHING AIRWORTHINESS OF NOVEL, UNPRECEDENTED AIRBORNE SYSTEM ARCHITECTURES.$238K
Jul 26, 2019Department of DefenseFA8730 KESSEL RUN AFLCMC/HBBKFA873019P0023541715AIR FORCE PITCH DAY, KESSEL RUN SPECIAL TOPIC AF192-005 SBIR PHASE I AWARD$75K
Jul 12, 2019Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0001541330INVESTMENT PROCESS MANAGEMENT, DOCUMENT MANAGEMENT SUPORT. ;;5005;; IGF::OT::IGF$155K
Jul 12, 2019Department of DefenseW6QK ACC-APGW56KGU19C0037541714THE PURPOSE OF THIS CONTRACT IS FOR AN AWARD OF A SBIR PHASE I$108K
Jul 12, 2019Department of DefenseW6QK AATD CONTR OFFW911W618C0042541715IGF::OT::IGF, DATA REFINERY FOR AVIATION SUSTAINMENT, SBIR PHASE I, TO SUPPORT DATA REFINERY AND REDUCTION TO SUPPORT AVIATION SUSTAINMENT.$50K
Jul 8, 2019Department of Transportation693KA9 CONTRACTING FOR SERVICES693KA918F00017541330THIS TASK ORDER IS TO PROVIDE SYSTEM AND PERFORMANCE ENGINEERING SERVICES FOR THE FAA AIR TRAFFIC MANAGEMENT PROGRAMS ORGANIZATION AND TO SUPPORT THE DEVELOPMENT AND IMPLEMENTATION OF AIR TRAFFIC CONTROL AUTOMATION SYSTEMS, MORE SPECIFICALLY THE EN ROUTE AUTOMATION MODERNIZATION SYSTEM.$261K
Jun 21, 2019Department of DefenseW4PZ USA MED RSCH ACQUIS ACTW81XWH19C0148541715NEW MEDICAL RESEARCH AND DEVELOPMENT CONTRACT, DHA PHASE I SBIR 19.1 # H191-004-0046,PROJECT TITLED "REMIDE (RELIABLE MEDICAL INFORMATION DELIVERY IN DIL ENVIRONMENTS".$162K
Jun 7, 2019Department of Transportation692L79 DOT FAA TECHNICAL CENTERDTFAWA15D00026CALL0006541330THE ADVANCED CONCEPTS BRANCH (ANG-C54) PERFORMS RESEARCH, ENGINEERING ANALYSIS TO DEVELOP AND REFINE OPERATIONAL CONCEPTS AND TECHNICAL REQUIREMENTS TO ENSURE FEASIBILITY AND VIABILITY WITHIN THE NATI IGF::OT::IGF$181K
Jun 7, 2019Department of DefensePAE STRATEGIC SYSTEMS PROGRAMSN0003018C0240541715BASE$100K
Jun 3, 2019Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0004541330SUPPORT THE AVS ACQUISITION PROGRAM MANAGEMENT OFFICE (APMO)BY PROVI" IGF::OT::IGF$26K
Jun 3, 2019Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833518C0757541715RESEARCH AND DEVELOPMENT IGF::OT::IGF$100K
May 20, 2019Department of DefenseFA8750 AFRL RIKFA875018C0124541715MISSION ORIENTED JOINT AERIAL LAYER NETWORK OPERATIONS (MOJO)$299K
May 14, 2019Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833519C0404541715RESEARCH AND DEVELOPMENT IGF::OT::IGF$500K
May 1, 2019Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0003541330TORP 5008 IGF::OT::IGF$266K
Apr 8, 2019Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833516C0390541712RESEARCH AND DEVELOPMENT, SBIR PHASE II, IGF::OT::IGF$400K
Apr 5, 2019Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTS0007541330IGF::OT::IGF THIS TASK ORDER WILL PROVIDE HUMAN FACTORS (HF) EXPERTISE.$46K
Mar 6, 2019Department of DefenseFA8652 AFRL HQ AFRL/PKFA865219P0111541715COMMERCIAL SOLUTIONS FOR PEO DIGITAL$158K
Mar 6, 2019Department of DefenseFA8652 AFRL HQ AFRL/PKFA865219P0319541715PITCH DAY IN COMMAND, CONTROL, COMMUNICATIONS, INTELLIGENCE, AND NETWORK (C3I&N)$158K
Mar 1, 2019Department of Transportation692L79 DOT FAA TECHNICAL CENTERDTFAWA15D00026CALL0006541330THE ADVANCED CONCEPTS BRANCH (ANG-C54) PERFORMS RESEARCH, ENGINEERING ANALYSIS TO DEVELOP AND REFINE OPERATIONAL CONCEPTS AND TECHNICAL REQUIREMENTS TO ENSURE FEASIBILITY AND VIABILITY WITHIN THE NATI IGF::OT::IGF$225K
Feb 21, 2019Department of Transportation693KA9 CONTRACTING FOR SERVICES693KA918F00017541330THIS TASK ORDER IS TO PROVIDE SYSTEM AND PERFORMANCE ENGINEERING SERVICES FOR THE FAA AIR TRAFFIC MANAGEMENT PROGRAMS ORGANIZATION AND TO SUPPORT THE DEVELOPMENT AND IMPLEMENTATION OF AIR TRAFFIC CONTROL AUTOMATION SYSTEMS, MORE SPECIFICALLY THE EN ROUTE AUTOMATION MODERNIZATION SYSTEM.$400K
Feb 19, 2019National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC18F0193541712EFFECTIVENESS OF ALTERNATE CONCEPTS TO CONTEMPORARY DEVELOPMENT ASSURANCE PROCESSES: THIS RESEARCH WILL FOCUS ON GENERAL AVIATION (GA) AIRCRAFT AND ROTORCRAFT (STANDARD AIRWORTHINESS CERTIFICATION REGULATIONS PART 23, PART 27); HOWEVER, BECAUSE OF INCREASING DESIGN COMPLEXITY OF SOME GA AIRCRAFT, ASSURANCE APPROACHES DEVELOPED OR EVALUATED THROUGH THIS RESEARCH MAY ALSO BE APPLICABLE TO THEIR TRANSPORT CATEGORY COUNTERPARTS (PART 25, PART 29). THE SCOPE OF THIS TASK IS THE SYSTEM SAFETY ASSESSMENT (SSA), DISCUSSED IN AEROSPACE RECOMMENDED PRACTICE (ARP) 4754A [4] (SECTION 5.1), AND ELABORATED WITHIN ARP 4671 [5], AND DOES NOT EXTEND INTO HARDWARE [6] AND SOFTWARE [7] ITEM-LEVEL ASSURANCE. WHILE THIS SCOPE ASSUMES THAT THE SAFETY ASSESSMENT IS GROUNDED IN HAZARDS ANALYSIS STARTING WITH TOP-LEVEL AIRCRAFT FUNCTIONS, THE RESEARCH IS NOT CONSTRAINED TO THE METHODOLOGY DEFINED IN THE ARP DOCUMENTS. FOR INSTANCE, ALTERNATE APPROACHES TO CONDUCTING THE FUNCTIONAL HAZARD ANALYSIS (FHA), SUCH AS THE APPLICATION OF STPA (SYSTEM-THEORETIC PROCESS ANALYSIS) [8], MAY BE PROPOSED AS THE HAZARDS ANALYSIS APPROACH. THE OBJECTIVES OF THIS TASK ORDER ARE TO IDENTIFY, DEMONSTRATE, AND EVALUATE THE EFFICACY OF ALTERNATE ASSURANCE CONCEPTS FOR ACCEPTING THE INTRODUCTION OF NEW TECHNOLOGIES INTO EXISTING AIRBORNE SYSTEM ARCHITECTURES, AND TO IDENTIFY, DEMONSTRATE, AND EVALUATE THE EFFICACY OF ALTERNATE ASSURANCE CONCEPTS FOR ESTABLISHING AIRWORTHINESS OF NOVEL, UNPRECEDENTED AIRBORNE SYSTEM ARCHITECTURES.$34K
Feb 13, 2019Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0004541330SUPPORT THE AVS ACQUISITION PROGRAM MANAGEMENT OFFICE (APMO)BY PROVI" IGF::OT::IGF$60K
Feb 13, 2019Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833519C0134541715RESEARCH AND DEVELOPMENT$745K
Feb 12, 2019Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0003541330TORP 5008 IGF::OT::IGF$225K
Jan 24, 2019Department of DefenseFA8750 AFRL RIKFA875018C0124541715MISSION ORIENTED JOINT AERIAL LAYER NETWORK OPERATIONS (MOJO)$149K
Jan 3, 2019Department of DefenseFA8750 AFRL RIKFA875018C0124541715MISSION ORIENTED JOINT AERIAL LAYER NETWORK OPERATIONS (MOJO)$50K
Dec 13, 2018Department of Transportation693KA9 CONTRACTING FOR SERVICES693KA918F00017541330THIS TASK ORDER IS TO PROVIDE SYSTEM AND PERFORMANCE ENGINEERING SERVICES FOR THE FAA AIR TRAFFIC MANAGEMENT PROGRAMS ORGANIZATION AND TO SUPPORT THE DEVELOPMENT AND IMPLEMENTATION OF AIR TRAFFIC CONTROL AUTOMATION SYSTEMS, MORE SPECIFICALLY THE EN ROUTE AUTOMATION MODERNIZATION SYSTEM.$27K
Dec 4, 2018Department of Transportation693KA9 CONTRACTING FOR SERVICES693KA918F00017541330THIS TASK ORDER IS TO PROVIDE SYSTEM AND PERFORMANCE ENGINEERING SERVICES FOR THE FAA AIR TRAFFIC MANAGEMENT PROGRAMS ORGANIZATION AND TO SUPPORT THE DEVELOPMENT AND IMPLEMENTATION OF AIR TRAFFIC CONTROL AUTOMATION SYSTEMS, MORE SPECIFICALLY THE EN ROUTE AUTOMATION MODERNIZATION SYSTEM.$279K
Nov 16, 2018Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0003541330TORP 5008 IGF::OT::IGF$148K
Oct 31, 2018Department of DefenseFA8750 AFRL RIKFA875018C0124541715MISSION ORIENTED JOINT AERIAL LAYER NETWORK OPERATIONS (MOJO)$100K
Oct 3, 2018Department of DefenseFA8750 AFRL RIKFA875019C0049541715SCARS MIGRATION TOOLKIT (SCARS-MT)$750K
Sep 28, 2018Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833518C0213541715IGF::OT::IGF$100K
Sep 27, 2018National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC18F0193541712EFFECTIVENESS OF ALTERNATE CONCEPTS TO CONTEMPORARY DEVELOPMENT ASSURANCE PROCESSES: THIS RESEARCH WILL FOCUS ON GENERAL AVIATION (GA) AIRCRAFT AND ROTORCRAFT (STANDARD AIRWORTHINESS CERTIFICATION REGULATIONS PART 23, PART 27); HOWEVER, BECAUSE OF INCREASING DESIGN COMPLEXITY OF SOME GA AIRCRAFT, ASSURANCE APPROACHES DEVELOPED OR EVALUATED THROUGH THIS RESEARCH MAY ALSO BE APPLICABLE TO THEIR TRANSPORT CATEGORY COUNTERPARTS (PART 25, PART 29). THE SCOPE OF THIS TASK IS THE SYSTEM SAFETY ASSESSMENT (SSA), DISCUSSED IN AEROSPACE RECOMMENDED PRACTICE (ARP) 4754A [4] (SECTION 5.1), AND ELABORATED WITHIN ARP 4671 [5], AND DOES NOT EXTEND INTO HARDWARE [6] AND SOFTWARE [7] ITEM-LEVEL ASSURANCE. WHILE THIS SCOPE ASSUMES THAT THE SAFETY ASSESSMENT IS GROUNDED IN HAZARDS ANALYSIS STARTING WITH TOP-LEVEL AIRCRAFT FUNCTIONS, THE RESEARCH IS NOT CONSTRAINED TO THE METHODOLOGY DEFINED IN THE ARP DOCUMENTS. FOR INSTANCE, ALTERNATE APPROACHES TO CONDUCTING THE FUNCTIONAL HAZARD ANALYSIS (FHA), SUCH AS THE APPLICATION OF STPA (SYSTEM-THEORETIC PROCESS ANALYSIS) [8], MAY BE PROPOSED AS THE HAZARDS ANALYSIS APPROACH. THE OBJECTIVES OF THIS TASK ORDER ARE TO IDENTIFY, DEMONSTRATE, AND EVALUATE THE EFFICACY OF ALTERNATE ASSURANCE CONCEPTS FOR ACCEPTING THE INTRODUCTION OF NEW TECHNOLOGIES INTO EXISTING AIRBORNE SYSTEM ARCHITECTURES, AND TO IDENTIFY, DEMONSTRATE, AND EVALUATE THE EFFICACY OF ALTERNATE ASSURANCE CONCEPTS FOR ESTABLISHING AIRWORTHINESS OF NOVEL, UNPRECEDENTED AIRBORNE SYSTEM ARCHITECTURES.$600K
Sep 18, 2018Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0003541330TORP 5008 IGF::OT::IGF$74K
Sep 17, 2018Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833516C0255811219RESEARCH&DEVELOPMENT IGF::OT::IGF$260K
Sep 12, 2018Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0001541330INVESTMENT PROCESS MANAGEMENT, DOCUMENT MANAGEMENT SUPORT. ;;5005;; IGF::OT::IGF$151K
Sep 7, 2018Department of DefenseW6QK AATD CONTR OFFW911W618C0042541715IGF::OT::IGF, DATA REFINERY FOR AVIATION SUSTAINMENT, SBIR PHASE I, TO SUPPORT DATA REFINERY AND REDUCTION TO SUPPORT AVIATION SUSTAINMENT.$100K
Sep 6, 2018Department of DefenseFA8750 AFRL RIKFA875018C0162541715MISSION-OPTIMIZED AERIAL CLOUD ENVIRONMENT (MACE)$750K
Sep 6, 2018Department of DefensePAE STRATEGIC SYSTEMS PROGRAMSN0003018C0240541715BASE$125K
Aug 29, 2018Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833518C0757541715RESEARCH AND DEVELOPMENT IGF::OT::IGF$125K
Aug 17, 2018Department of Transportation693KA9 CONTRACTING FOR SERVICESDTFAWA10A00004CALL0006541330"OPERATIONAL CONCEPTS DEVELOPMENT, VERIFICATION, AND VALIDATION. " IGF::CL::IGF$200K
Aug 15, 2018Department of DefenseW6QK ACC-APGW91CRB18C0037541512SBIR FOR PHASE II BASE YEAR CROSS DOMAIN SOLUTION$500K
Jul 30, 2018Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0002541330TORP 5009 IGF::OT::IGF$100K
Jul 23, 2018National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC18P1917541715INTEGRATED ARRIVAL DEPARTURE SURFACE (IADS) TRAFFIC MANAGEMENT SOLUTIONS REQUIRE ACCURATE INFORMATION ABOUT AIRCRAFT ON THE AIRPORT SURFACE, FROM THE GATE TO THE RUNWAY. ONLY A SMALL FRACTION OF AIRPORTS HAVE SURFACE SURVEILLANCE AND IN ALMOST EVERY CASE COVERAGE IS LIMITED TO THE AIRPORT S MOVEMENT AREA. A SOLUTION IS NEEDED THAT CAN COMPENSATE FOR THE SHORTAGE OF SURVEILLANCE AND IS ECONOMICALLY FEASIBLE TO DEPLOY AND MAINTAIN AT ANY AIRPORT. THE AIRPORT SURFACE STATE EVENT TRACKER (ASSET) PROVIDES IMPROVED AWARENESS OF SURFACE TRAFFIC IN THE ABSENCE OF SURVEILLANCE, IMPROVING THE EFFICIENCY OF SURFACE AND AIRSPACE TRAFFIC MANAGEMENT. ASSET USES SENSOR DATA (E.G., LOCATION, VELOCITY) FROM EXISTING MOBILE DEVICES (E.G., ELECTRONIC FLIGHT BAGS (EFB), CELL PHONES) TO DETERMINE AIRCRAFT SURFACE STATE EVENTS (E.G., PUSH BACK FROM GATE, TAXIING, TAKEOFF, ETC.) AND IMPROVE DEPARTURE PLANNING, SURFACE MANAGEMENT, AND ARRIVAL SEQUENCING.$125K
Jun 29, 2018Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTSDTFAWA15D00026CALL0004541330SUPPORT THE AVS ACQUISITION PROGRAM MANAGEMENT OFFICE (APMO)BY PROVI" IGF::OT::IGF$96K
Jun 28, 2018Department of Transportation692L79 DOT FAA TECHNICAL CENTERDTFAWA15D00026CALL0006541330THE ADVANCED CONCEPTS BRANCH (ANG-C54) PERFORMS RESEARCH, ENGINEERING ANALYSIS TO DEVELOP AND REFINE OPERATIONAL CONCEPTS AND TECHNICAL REQUIREMENTS TO ENSURE FEASIBILITY AND VIABILITY WITHIN THE NATI IGF::OT::IGF$310K
Jun 15, 2018Department of DefenseFA8750 AFRL RIKFA875018C0124541715MISSION ORIENTED JOINT AERIAL LAYER NETWORK OPERATIONS (MOJO)$300K
Jun 8, 2018Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833518C0597541715PROGRESS REPORT "IGF::OT::IGF"$125K
Jun 6, 2018Department of Transportation693KA9 CONTRACTING FOR SERVICES693KA918F00017541330THIS TASK ORDER IS TO PROVIDE SYSTEM AND PERFORMANCE ENGINEERING SERVICES FOR THE FAA AIR TRAFFIC MANAGEMENT PROGRAMS ORGANIZATION AND TO SUPPORT THE DEVELOPMENT AND IMPLEMENTATION OF AIR TRAFFIC CONTROL AUTOMATION SYSTEMS, MORE SPECIFICALLY THE EN ROUTE AUTOMATION MODERNIZATION SYSTEM.$574K
May 29, 2018Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833516C0255811219RESEARCH&DEVELOPMENT IGF::OT::IGF$50K

Get Alerted Before Architecture Technology INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free