Federal Contractor Profile
Aspen Construction Company
$110M obligated·97 awards·2 agencies·6 NAICS
Federal Contracts
Showing award actions 51–100 of 160 funded award actions, most recent first.
- Contracts with positive obligations
- 97
- Funded award actions shown
- 160
- Obligations shown
- $110M
- Awarding agencies
- 2
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of July 20, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 27, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0281 | 237310 | THIS PROJECT IS TO EXPAND THE PARKING LOT OF BUILDING 2625 ON LANGLEY AFB. | $86K |
| Sep 27, 2023 | Department of DefenseW072 ENDIST HUNTINGTON | W912QR23C0002 | 237990 | JOHNSON COUNTY PHASE II | $452K |
| Sep 21, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0268 | 237310 | THE SCOPE OF THIS PROJECT IS TO CONSTRUCT A SIDEWALK THAT CONNECTS THE SHORT SIDEWALK (LEADING TO THE PARKING LOT) AND THE SIDEWALK ON THE OPPOSITE SIDE. BUILDING 605 ON LANGLEY AFB HAMPTON, VA | $7K |
| Sep 15, 2023 | Department of DefenseW072 ENDIST HUNTINGTON | W912QR23C0002 | 237990 | JOHNSON COUNTY PHASE II | $323K |
| Aug 31, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0242 | 237310 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO REMOVE EXISTING AND REPLACE WITH NEW CONCRETE AT THE BASE OPS FLIGHT LINE ENTRANCE LOCATED AT JBLE-LANGLEY, HAMPTON, VA. | $147K |
| Aug 23, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0210 | 237310 | EMERGENCY PAVING REPAIR OF NEALY AVE SINKHOLE AT OUTFALL. | $17K |
| Aug 9, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0051 | 237310 | CONTRACTOR SHALL REMOVE AND REPLACE APPROXIMATELY 128 OVERSIZED CONCRETE SLABS LOCATED ON THE F-22 FIGHTER RAMP THAT ARE DETERIORATED AND SPALLED OR CRACKED. PERIOD OF PERFORMANCE IS 272 CALENDAR DAYS. | $28K |
| Jul 27, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0178 | 237310 | REPAIR AND INSTALL TAXI LINES AND MOORING POINTS | $196K |
| Jul 14, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0124 | 237310 | DESIGN AND CONSTRUCT ADJOINING PARKING LOTS NEAR F. 378 AND F. 775 | $394K |
| Jul 14, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0148 | 237310 | THE PURPOSE OF THIS AWARD IS TO CONSTRUCT AN ADJOINING PARKING LOT IN-PLACE OF F. 788. | $302K |
| May 30, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0112 | 237310 | CONSTRUCTION OF A CONCRETE PAD IN FRONT OF THE CARGO YARD (AREA OF GRASS) NEXT TO BUILDING 351. | $594K |
| May 22, 2023 | Department of DefenseW072 ENDIST HUNTINGTON | W912QR23C0002 | 237990 | JOHNSON COUNTY PHASE II | $76K |
| May 19, 2023 | Department of DefenseW072 ENDIST HUNTINGTON | W9123720C0007 | 237990 | TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY | $538K |
| Mar 30, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0051 | 237310 | CONTRACTOR SHALL REMOVE AND REPLACE APPROXIMATELY 128 OVERSIZED CONCRETE SLABS LOCATED ON THE F-22 FIGHTER RAMP THAT ARE DETERIORATED AND SPALLED OR CRACKED. PERIOD OF PERFORMANCE IS 272 CALENDAR DAYS. | $1.8M |
| Mar 24, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0052 | 237310 | THIS AWARD IS FOR A PROJECT TO REPAIR THE SANITARY SEWER SYSTEM LOCATED ON THE EAST SIDE OF LANGLEY AFB. | $489K |
| Mar 17, 2023 | Department of DefenseW072 ENDIST HUNTINGTON | W9123720C0007 | 237990 | TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY | $430K |
| Feb 10, 2023 | Department of DefenseFA4800 633 CONS PKP | FA480023F0029 | 237310 | CONTRACTOR SHALL REPAIR/REPAVE APPROXIMATELY 52 OVERSIZED CONCRETE SLABS, 500 LF OF SHALLOW DEPTH SPALLS, AND 65 LF OF AIRFIELD BOX DRAINS ON THE LANGLEY AFB EAST RAMP. PERIOD OF PERFORMANCE IS 194 CALENDAR DAYS. | $755K |
| Dec 20, 2022 | Department of DefenseW072 ENDIST HUNTINGTON | W9123720C0007 | 237990 | TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY | $7.1M |
| Dec 16, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480023F0004 | 237310 | THIS PROJECT MILLS AND PAVES THE INBOUND/OUTBOUND LANES OF WASHINGTON BLVD-JEFFERSON TO MARSHALL AND RESTRIPES PAVEMENT MARKINGS. | $854K |
| Nov 4, 2022 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR23C0002 | 237990 | JOHNSON COUNTY PHASE II | $11M |
| Sep 27, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0202 | 237310 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO REMOVE APPROXIMATELY 8,000 SF OF 6 INCH CONCRETE ON THE SE SIDE OF F. 775. THE CONTRACTOR SHALL ADD SUB BASE AS NEEDED TO MEET MINIMUM REQUIREMENTS AS APPLICABLE TO UFC 3-250-01. | $117K |
| Sep 27, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0241 | 237310 | INSTALL SIDEWALK AT BUILDING 849 ON FT. EUSTIS. PERIOD OF PERFORMANCE IS 29 CALENDAR DAYS. | $3K |
| Sep 26, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0256 | 237310 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO REPAIR 78,500 SQUARE FEET OF PAVEMENT AT TAXIWAY D AND 208,000 SQUARE FEET OF TAXIWAY E. | $112K |
| Sep 22, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0199 | 237310 | CONTRACTOR SHALL REPAIR FULL LENGTH OF NORTH RAMP ON LANGLEY AFB AIRFIELD. PERIOD OF PERFORMANCE IS 529. | $4.4M |
| Aug 25, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0177 | 237310 | REMOVAL OF RUBBER FROM THE RUNWAY ON LANGLEY AIR FORCE BASE, VIRGINIA. | $690K |
| Aug 25, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0183 | 237310 | CONTRACTOR SHALL REPAIR INSTALLATION SANITARY SEWER SYSTEM, I&I PRIORITY 1&2 WEST AREA ON LANGLEY AFB. | $599K |
| Aug 23, 2022 | Department of DefenseW072 ENDIST PITTSBURGH | W911WN22C8003 | 237990 | UPSTREAM EMBANKMENT RIP-RAP EXTENSION MOSQUITO CREEK LAKE, CORTLAND, OHIO | $1.6M |
| Aug 23, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0040 | 237310 | THIS PROJECT IS FOR THE CONCRETE REPAIR OF RUNWAY 26 EAST AND THE VICINITY OF THE RUNWAY 26 HOLD LINE. | $60K |
| Aug 22, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0103 | 237310 | THIS CONTRACT IS FOR INSTALLING 39 TIE DOWN POINTS AND 29 ADDITIONAL GROUNDING POINTS TO MEET T-38 AIRCRAFT PARKING REQUIREMENTS ON THE WEST RAMP OF JBLE-LANGLEY. | $183K |
| Aug 15, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0168 | 237310 | THE CONTRACTOR SHALL REPAIR THE EAST WARM UP PAD ON RUNWAY 26. REPAIRS WILL INCLUDE FULL DEPTH 18" SLAB REPLACEMENTS, PARTIAL DEPTH REPAIRS OF SPALLS, INSTALLATION OF JOINT SEALANT, & PAINTING OF AIRCRAFT TAXI LINES/HOLD LINES REQUIRING REPLACEMENT. | $452K |
| Aug 12, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0158 | 237310 | THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS TO ERADICATE STRIPING, MILL PAVEMENT, RESTRIPE AND REPAVE MILLED AREA IAW THE STATEMENT OF WORK AND SITE DRAWINGS. | $442K |
| Aug 9, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0040 | 237310 | THIS PROJECT IS FOR THE CONCRETE REPAIR OF RUNWAY 26 EAST AND THE VICINITY OF THE RUNWAY 26 HOLD LINE. | $38K |
| Jul 30, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0147 | 237310 | REPAIR CONCRETE SLABS AND SPALLS AT TAXIWAYS A, D & M ON LANGLEY AFB. PERIOD OF PERFORMANCE IS 46 CALENDAR DAYS. | $63K |
| Jun 21, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0103 | 237310 | THIS CONTRACT IS FOR INSTALLING 39 TIE DOWN POINTS AND 29 ADDITIONAL GROUNDING POINTS TO MEET T-38 AIRCRAFT PARKING REQUIREMENTS ON THE WEST RAMP OF JBLE-LANGLEY. | $133K |
| May 4, 2022 | Department of DefenseW072 ENDIST HUNTINGTON | W9123720C0007 | 237990 | TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY | $9.5M |
| May 4, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480021F0209 | 237310 | CONSTRUCT/REPAIR ROUNDABOUT AT SWEENEY-HAMMOND-NEALY INTERSECTION | $100K |
| Mar 17, 2022 | Department of DefenseW072 ENDIST HUNTINGTON | W9123720C0007 | 237990 | TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY | $305K |
| Mar 14, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0044 | 237310 | MUHJ 20-7000 CONSTRUCT PAVEMENT FOR READYLINE EXPANSION, MXG, F. 6020 | $1.1M |
| Mar 4, 2022 | Department of DefenseFA4800 633 CONS PKP | FA480022F0040 | 237310 | THIS PROJECT IS FOR THE CONCRETE REPAIR OF RUNWAY 26 EAST AND THE VICINITY OF THE RUNWAY 26 HOLD LINE. | $152K |
| Oct 22, 2021 | Department of DefenseW072 ENDIST HUNTINGTON | W9123720C0007 | 237990 | TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY | $10K |
| Oct 14, 2021 | Department of DefenseW072 ENDIST HUNTINGTON | W9123720C0007 | 237990 | TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY | $495K |
| Sep 30, 2021 | Department of DefenseFA4800 633 CONS PKP | FA480021F0230 | 237310 | MUHJ 21-5010 REPAIR TAXIWAY ALPHA | $2.1M |
| Sep 30, 2021 | Department of DefenseFA4800 633 CONS PKP | FA480021F0231 | 237310 | HERT 16-6053 MILL AND REPAVE PARKING LOT, F. 661 | $294K |
| Sep 28, 2021 | Department of DefenseFA4800 633 CONS PKP | FA480021F0228 | 237310 | REPAIR AIRFIELD DRAINAGE PIPE, F. 752 | $170K |
| Sep 23, 2021 | Department of DefenseFA4800 633 CONS PKP | FA480021F0209 | 237310 | CONSTRUCT/REPAIR ROUNDABOUT AT SWEENEY-HAMMOND-NEALY INTERSECTION | $3.2M |
| Sep 23, 2021 | Department of DefenseFA4800 633 CONS PKP | FA480021F0229 | 237310 | MILL AND PAVE WEYLAND, CLARKE, AND ROMA ST | $171K |
| Sep 22, 2021 | Department of DefenseFA4800 633 CONS PKP | FA480021F0227 | 237310 | MILL AND REPAVE CALHOUN STREET AND BUILDING 210 PARKING LOT | $188K |
| Sep 14, 2021 | Department of DefenseW07V ENDIST ST PAUL | W912ES21P0088 | 238120 | REPLACE LAUNCH RAMP | $208K |
| Sep 9, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000025 | 237310 | PROJECT PRWI 201(1) 400(1) AND NCR PMS VA(1): THE NP PRWI 201(1), 400(1), ETC PROJECT CONSISTS OF THE REHABILITATION OF A 0.31-MILE OF CARTER DAY CAMP ROAD (ROUTE 201), 0.49-MILE OF PARK HEADQUARTERS ROAD (ROUTE 400), 0.12-MILE OF ADMINISTRATIVE DRI | $35K |
| Sep 8, 2021 | Department of DefenseFA4800 633 CONS PKP | FA480021F0179 | 237310 | HERT 17-1001, AIRFIELD PAVEMENT REPAIR & SHOULDER STRIPING | $234K |
Get Alerted Before Aspen Construction Company's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free