Skip to content

Federal Contractor Profile

Associates Of American Rr

$91M obligated·262 awards·5 agencies·19 NAICS

Federal Contracts

Showing award actions 51–100 of 313 funded award actions, most recent first.

Contracts with positive obligations
262
Funded award actions shown
313
Obligations shown
$91M
Awarding agencies
5

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of September 28, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Apr 30, 2021Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN0051541712IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT$100K
Apr 19, 2021Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000038541712IGF::OT::IGF FACILITATION OF TECHNICAL EXCHANGES BETWEEN THE U.S. AND CHINA IN SUPPORT OF THE TRANSPORTATION FORUM.$30K
Apr 16, 2021Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000015541712IGF::OT::IGF THE OBJECTIVE OF THIS TASK IS TO PROVIDE ADMINISTRATIVE SUPPORT TO THE FRA ON-SITE COTR FOR TWO CALENDAR YEARS, IN ACCORDANCE WITH SECTION G.4 (B) OF THE CCC CONTRACT, AND PER SPECIAL REQUESTS BY THE ON-SITE COTR.$65K
Apr 13, 2021Department of Transportation693JJ6 FEDERAL RAILROAD ADMINDTFR5317F00767541712IGF::OT::IGF FRA WILL ACQUIRE A CRYOGENIC TENDER WITH THE CORRESPONDING VALVES AND PROTECTIVE HOUSING AS REQUIRED. THE TENDER WILL BE TRANSPORTED TO THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO. FRA AND PHMSA ARE INTERESTED IN TESTING THE TENDER TO DETERMINE THE SURVIVABILITY OF THE TENDER UNDER VARIOUS ACCIDENT SCENARIOS. IN THIS EFFORT, FRA WILL PERFORM ONE DYNAMIC IMPACT TEST AT TTC.$369K
Apr 6, 2021Department of Homeland SecurityCONTRACTING AND PROCUREMENTHSTS0417CCT5001541712"IGF::CT::IGF" THE GOVERNMENT HEREBY ISSUES CONTRACT HSTS04-17-C-CT5001 TO TTCI TO OBTAIN TESTING AND ASSESSMENT OF RAILCAR VULNERABILITY SERVICES. THE CONTRACTOR SHALL DELIVER THE SERVICES ASSOCIATED WITH THE CLINS HEREIN IN ACCORDANCE WITH THE ATTACHED SOW. THE PERIOD OF PERFORMANCE (POP) SHALL BE FROM 03/22/17 TO 03/21/18, AND ALSO INCLUDE 4 OPTION PERIODS. THE TOTAL VALUE OF THIS CONTRACT AT THE CONCLUSION OF THE POP IS ANTICIPATED TO BE $4,998,626.12$1.0M
Mar 25, 2021Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000040541712ACQUIRE TWO TANK CARS AND CONDUCT TWO FULL SCALE SIDE IMPACT TESTS. THE IMPACT TESTS WILL BE CONDUCTED IN ACCORDANCE WITH THE APPROPRIATE TEST PLAN AND ARE BASED UPON PREVIOUS FRA SIDE IMPACT TESTS$587K
Mar 11, 2021Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$275K
Mar 3, 2021Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR6913G621P800030519130AAR MANUAL OF STANDARDS AND PRACTICES 2021$16K
Feb 17, 2021Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR6913G621P800025511210NUCARS SOFTWARE LICENSE RENEWAL 2021$25K
Feb 1, 2021Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$206K
Jan 22, 2021Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000004541712THE OBJECTIVE OF THIS TASK IS TO PROVIDE FUNDING FOR TWO YEARS TO THE PROGRAM MANAGEMENT AND GENERAL SUPPORT TO THE FRA, AS PER SECTION H.14.C OF THE CCC CONTRACT AND AS PER SPECIAL REQUESTS BY FRA.$185K
Dec 18, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619P000004518210IGF::OT::IGF - STB WAYBILL - THE CARLOAD WAYBILL SAMPLE IS AN ANNUAL SAMPLE OF PROPRIETARY WAYBILLS FOR TERMINATED SHIPMENTS BY RAIL CARRIERS. THE FEDERAL RAILROAD ADMINISTRATION (FRA) AND THE SURFACE TRANSPORTATION BOARD (STB) REQUIRE A CONFIDENTIAL, MASTER WAYBILL FILE TO CARRY OUT REGULATORY RESPONSIBILITIES, ANALYSES, AND STUDIES AS WELL AS TO SUPPORT OTHER GOVERNMENTAL AGENCIES AND STATES.$393K
Nov 5, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$182K
Sep 23, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000078541712THIS IS FOR PERSONNEL AND MATERIAL SUPPORT ACTIVITIES NECESSARY TO SUPPORT THE FRA TECHNICAL TRAINING STANDARDS DIVISION (TTSD) AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO. UNDER THIS TASK ORDER (TO), THE CONTRACTOR WILL PROVIDE LABOR$159K
Sep 22, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000023541712NEW TASK ORDER FOR PROCUREMENT AND TESTING OF PTL EOT SEGMENT$881K
Sep 22, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000049541712QUANTIFICATION AND EVALUATION OF RAIL FLAW INSPECTION PRACTICES AND MODERN RAIL STEEL DEFECT GROWTH ANALYSIS THIS TASK ORDER SHALL BE PERFORMED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK, DATED 05/06/20$230K
Sep 21, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ618F000067541712TO EVALUATE RELIABILITY OF RAILROAD TANK CAR NONDESTRUCTIVE EVALUATION (NDE) METHODS USING THE PROBABILITY OF DETECTION (POD) APPROACH.$240K
Sep 16, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ618F000143541712IGF::OT::IGF - TRACK GEOMETRY MEASUREMENT SYSTEM EVALUATION; DESIGN AND BUILD A TEST TRACK SECTION WITH PRECISELY ADJUSTABLE TRACK GEOMETRY VARIATIONS.$1.5M
Sep 11, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000046541712ORGANIZE SEMINAR FOR INDUSTRY AND RESEARCH COMMITTEE TO MOVE THE SCIENCE FORWARD FOR CWR FORCE MANAGEMENT IN A COORDINATED FASHION$280K
Sep 11, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000082541712THE CONTRACTOR WILL DOCUMENT FREIGHT CAR TRUCK WARP RESTRAINT PERFORMANCE REQUIREMENTS, LOAD ENVIRONMENT, FAILURE MODES, AND OTHER TRUCK OPERATIONAL DEFICIENCIES (THIS WOULD INCLUDE ISSUES SUCH AS EXCESSIVE WEIGHT, INTERFERENCE WITH OTHER COMPONENTS$237K
Sep 9, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$208K
Sep 2, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN0051541712IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT$50K
Aug 27, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000073541712NEW TASK ORDER FOR CONCEPT OF OPERATIONS, REQUIREMENTS, AND HAZARD ANALYSIS DEVELOPMENT FOR A ROAD REMOTE CONTROL LOCOMOTIVE SYSTEM TO SUPPORT AUTOMATED TRAIN OPERATION.$972K
Aug 26, 2020Department of Homeland SecurityMISSION ESSENTIALS70T05019C9NSTR005561210TTCI TO PROVIDE FACILITY OPERATION SUPPORT SERVICES WHICH INCLUDES PROVIDING UTILITIES, JANITORIAL SERVICES, TRASH AND O&M SERVICES NECESSARY FOR THE SAFE AND EFFICIENT OPERATIONS OF THE SURFACE TRANSPORTATION SECURITY READINESS FACILITY (STSRF).$116K
Aug 25, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000072541712THE OBJECTIVE OF THIS EXISTING TASK IS TO CONTINUE THE REFURBISHMENT OF TRACK COMPONENTS AROUND TTC TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT ON TRACK TESTING. THIS TASK IS UNDER TO: 18F000112 AS FUNDING BECOMES AVAILABLE.$360K
Aug 23, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000071541712NEW TASK ORDER FOR DEVELOPMENT AND TESTING OF A SENSOR PLATFORM TO SUPPORT AUTOMATED TRAIN OPERATION.$855K
Jul 28, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000040541712ACQUIRE TWO TANK CARS AND CONDUCT TWO FULL SCALE SIDE IMPACT TESTS. THE IMPACT TESTS WILL BE CONDUCTED IN ACCORDANCE WITH THE APPROPRIATE TEST PLAN AND ARE BASED UPON PREVIOUS FRA SIDE IMPACT TESTS$2.5M
Jul 28, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619P000004518210IGF::OT::IGF - STB WAYBILL - THE CARLOAD WAYBILL SAMPLE IS AN ANNUAL SAMPLE OF PROPRIETARY WAYBILLS FOR TERMINATED SHIPMENTS BY RAIL CARRIERS. THE FEDERAL RAILROAD ADMINISTRATION (FRA) AND THE SURFACE TRANSPORTATION BOARD (STB) REQUIRE A CONFIDENTIAL, MASTER WAYBILL FILE TO CARRY OUT REGULATORY RESPONSIBILITIES, ANALYSES, AND STUDIES AS WELL AS TO SUPPORT OTHER GOVERNMENTAL AGENCIES AND STATES.$359K
Jul 22, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000017541712EVALUATE NEW AND INNOVATIVE IDEAS AND TECHNOLOGIES AT TTC AND IN REVENUE SERVICE TO MITIGATE THE ADVERSE EFFECTS HAL OPERATING CONDITIONS.$300K
Jul 21, 2020Department of Transportation693JK3 ACQUISITION SERVICES DIV.693JK320P000022541715SUPPORT SERVICES FOR PHMSA'S RESEARCH, DEVELOPMENT,&TESTING FACILITY AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC)$326K
Jul 15, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMINDTFR5317F00793541712IGF::OT::IGF THE OBJECTIVE OF THIS CRASH ENERGY MANAGEMENT (CEM) RESEARCH EFFORT IS TO DETERMINE THE EFFECTIVENESS OF THE CEM COMPONENTS IN MITIGATING THE EFFECTS OF A COLLISION AND PREVENTING OVERRIDE.$9K
Jul 8, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000036541712NEW TASK ORDER FOR DEVELOPMENT OF SYSTEMS ENGINEERING SPECIFICATION AND SAFETY ANALYSIS FOR A QUASI MOVING BLOCK SAFETY SERVER.$575K
Jul 1, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000030541712INVESTIGATE HOW NEW AND EXISTING BALLAST AND TRACK DATA COLLECTION METHODS CAN BE OPTIMIZED, WITH REGARDS TO BOTH COLLECTION AND ANALYSIS, TO DEVELOP MODELS THAT FORECAST BALLAST AND TRACK PERFORMANCE.$150K
May 29, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000075541712TTC SITE IMPROVEMENTS R&D - TRANSPORTATION TECHNOLOGY CENTER R&D SITE IMPROVEMENTS RELATED ACTIVITIES - THE OBJECTIVE OF THIS NEW TASK IS TO REFURBISH THE WORK SPACE AREAS AND FIRE STATION BAY OF THE STORAGE MAINTENANCE BUILDING (SMB) TO ASSU$300K
May 27, 2020Department of Transportation693JK3 ACQUISITION SERVICES DIV.693JK320P000014541511THE PURPOSE OF THIS PR IS TO FUND THE CONSIST DATA INTEGRATION BETWEEN WEBTEK AND ASKRAIL PROJECT.$310K
May 19, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000102541712TRAIN-TO-TRAIN COLLISION TEST$51K
May 14, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000005541712FINALIZATION OF PTC INTEROPERABLE LIFECYCLE MANAGEMENT SYSTEM TO INCLUDE MIGRATION OF INDUSTRY CHANGE AND CONFIGURATION MANAGEMENT PROCESSES TO PTC INTEROPERABLE LIFECYCLE MANAGEMENT (ILM) SYSTEM.$721K
May 6, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000022541712DEVELOP FULL MOVING BLOCK REQUIREMENTS FOR RAILROAD OPERATIONS$682K
Apr 28, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN0051541712IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT$353K
Apr 27, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$264K
Apr 22, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000018541712TO PROVIDE, OR SHARE WITH TTCI IN PROVIDING SELECTED SITE IMPROVEMENTS THAT HELP TTC REMAIN A STATE-OF-ART RESEARCH FACILITY.$40K
Apr 2, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000004541712THE OBJECTIVE OF THIS TASK IS TO PROVIDE FUNDING FOR TWO YEARS TO THE PROGRAM MANAGEMENT AND GENERAL SUPPORT TO THE FRA, AS PER SECTION H.14.C OF THE CCC CONTRACT AND AS PER SPECIAL REQUESTS BY FRA.$161K
Apr 1, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000008541712DEVELOP AUTOMATED TRAIN OPERATION SEGMENT LEVEL REQUIREMENTS AND DOCUMENT TECHNOLOGY GAPS.$597K
Mar 26, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ618F000112541712REFURBISHMENT OF SELECTED FACILITIES TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT HIGH-SPEED TESTING AT TTC$135K
Mar 25, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000010541712TTCI 2016 - 2018 OVER CONTRACT VALUE REBILL$38K
Mar 12, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN0008541712IGF::OT::IGF THE PURPOSE OF THE WORK DESCRIBED WITHIN THIS STATEMENT OF WORK IS TO SUPPORT THE FULL-SCALE TESTING PROGRAM. THIS RESEARCH PROJECT WILL INCLUDE THREE TO FOUR FULL-SCALE TANK CAR DYNAMIC TESTS. THE CRASH TESTS WILL BE PERFORMED WITH DOT 113 AND DOT 105 TANK CARS.$1.1M
Mar 9, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$193K
Feb 26, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMINDTFR5317F00779541712IGF::OT::IGF EFFECTS OF TEMPERATURE ON WHEEL SPALLING - PHASE III$28K
Feb 12, 2020Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR6913G620P800059519130AAR MANUAL OF STANDARDS AND RECOMMENDED PRACTICES$16K
Feb 10, 2020Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR6913G620P800058423430RENEWAL OF NUCARS SOFTWARE LICENSE$25K

Get Alerted Before Associates Of American Rr's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free