Skip to content

Federal Contractor Profile

Aurora Flight Sciences Corporation

$522M obligated·94 awards·5 agencies·9 NAICS

Federal Contracts

Showing award actions 101–150 of 167 funded award actions, most recent first.

Contracts with positive obligations
94
Funded award actions shown
167
Obligations shown
$522M
Awarding agencies
5

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of July 9, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Oct 31, 2017Department of DefenseFA8620 AFLCMC WIJK BIG SAFARIFA862018C4005336411ACAT III BIG SAFARI$100K
Oct 31, 2017Department of DefenseFA8620 AFLCMC WIJK BIG SAFARIFA862018C4005336411ACAT III BIG SAFARI$45M
Oct 12, 2017Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001113C0098541712A NEW CONTRACT AWARD FOR THE TACTICALLY EXPLOITED RECONNAISSANCE NODE (TERN) EFFORT, PHASE I.$486K
Sep 29, 2017National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC17C0032541330IGF::OT::IGFX-PLANE RISK REDUCTION SUPPORT$5.0M
Sep 29, 2017National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC17C0033541330IGF::OT::IGFX-PLANE RISK REDUCTION SUPPORT$2.6M
Sep 27, 2017National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC17F0080541712IGF::OT::IGF ANALYSIS OF THE SINGLE-AISLE TURBOELECTRIC AIRCRAFT WITH AFT BOUNDARY LAYER PROPULSION (STARC-ABL) ADVANCED CONCEPT THE INTENT OF THIS STUDY IS TO PERFORM AN INDEPENDENT ANALYSIS OF THE STARC-ABL CONCEPT, AN ADVANCED LOW-WING TURBOELECTRIC COMMERCIAL TRANSPORT. THE STARC-ABL CONCEPT WAS INITIALLY DESCRIBED IN AIAA-2016-1027, AND FURTHER RESEARCH HAS IDENTIFIED SIMILAR SYSTEM LEVEL TRENDS WITH MINOR MODIFICATIONS TO THE PREVIOUSLY PUBLISHED DESIGN, SUCH AS A MACH 0.785 CRUISE SPEED. DUE TO THE SHORT DURATION OF THIS TASK, THERE IS NO EXPECTATION OF ADVANCING THE CONCEPT MATURITY BEYOND THE CONCEPTUAL LEVEL AS DESCRIBED IN AIAA-2016-1027. INSTEAD, THE GOAL IS TO EITHER GAIN CONFIDENCE IN THE CONCEPTUAL LEVEL SYSTEM TRENDS OF THE STARC-ABL CONCEPT OR IDENTIFY DISCREPANCIES THAT WARRANT POTENTIAL FURTHER STUDY. THE BLOCK FUEL WEIGHT FOR THE DESIGN AND ECONOMIC MISSIONS IS THE METRIC OF INTEREST.$736K
Sep 26, 2017Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865017F2724541712IGF::OT::IGF LOW COST AIRCRAFT DESIGN AND INTEGRATION$100K
Sep 20, 2017Department of DefenseFA4686 9 CONS PKFA468617P0046332312IGF::OT::IGF RQ4 V-TAIL STAND$50K
Sep 13, 2017Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001116C0049541712IGF::OT::IGF VERTICAL TAKEOFF AND LANDING (VTOL) X-PLANE PROGRAM PHASES 2 AND 3$5.5M
Aug 23, 2017National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC17P0105541712IGF::OT::IGFJSC ENGINEERING SEEKS TO DETERMINE THE FEASIBILITY OF UTILIZING THE UNIVERSAL BATTERY CHARGER (UBC) ON THE ISS AS A BACK-UP CHARGING CAPABILITY FOR A NEW EVA BATTERY, REFERRED TO AS THE LITHIUM ION PISTOL GRIP TOOL (LPGT) BATTERY. TO REALIZE THIS OBJECTIVE, A NEW CUSTOM UBC ADAPTER IS REQUIRED, TO INTERFACE THE UBC TO THE LPGT BATTERY. THIS NEW ADAPTER WILL BE LARGELY BASED ON EXISTING DESIGNS (ALREADY QUALIFIED FOR USE ON ISS), TO MINIMIZE NON-RECURRING ENGINEERING AS WELL AS SAFETY AND INTEGRATION RISK. THIS PROPOSED EFFORT CAN BE USED IN PRESENTATIONS TO THE EVA OFFICE, AND IF APPROVED, COULD RESULT IN FLIGHT HARDWARE DEVELOPMENT OF A UBC ADAPTER FOR THE LPGT BATTERY.$46K
Aug 18, 2017National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL15AA01C541712IGF::OT::IGF NRA(NASA RESEARCH ANNOUNCEMENT)- PASSIVE AEROELASTIC TAILORING FOR NEXT-GENERATION HIGH ASPECT RATIO WINGS - THE CONTRACTOR SHALL DEVELOP ADVANCED AEROELASTIC TAILORING TECHNIQUES WHICH YIELD BENEFICIAL AEROELASTIC PERFORMANCE WITHOUT INTRODUCING A WEIGHT PENALTY COMPARED TO TRADITIONAL DESIGNS FOR TRANSPORT AIRCRAFT WINGS.$209K
Aug 11, 2017Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865017F2724541712IGF::OT::IGF LOW COST AIRCRAFT DESIGN AND INTEGRATION$100K
Aug 9, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0002541712IGF::OT::IGF SURVEY FLIGHTS TO PROVIDE GRAVITY DATA AND THE PURCHASE OF A REFURBISHED MICRO-G LACOSTE TURNKEY AIRBORNE GRAVIMETRY SYSTEM 7 (TAGS7).$691K
Aug 7, 2017Department of DefenseOFFICE OF NAVAL RESEARCHN0001412C0671541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)$1.3M
Jul 5, 2017Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001116C0049541712IGF::OT::IGF VERTICAL TAKEOFF AND LANDING (VTOL) X-PLANE PROGRAM PHASES 2 AND 3$593K
Jun 30, 2017Department of DefenseFA8620 AFLCMC WIJK BIG SAFARIFA862012C3027336411ACAT III, BIG SAFARI, ORION$1.7M
Jun 28, 2017Department of DefenseOFFICE OF NAVAL RESEARCHN0001412C0671541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)$6.4M
May 18, 2017Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001116C0049541712IGF::OT::IGF VERTICAL TAKEOFF AND LANDING (VTOL) X-PLANE PROGRAM PHASES 2 AND 3$1.1M
May 17, 2017Department of DefenseOFFICE OF NAVAL RESEARCHN0001412C0671541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)$770K
May 17, 2017Department of DefenseOFFICE OF NAVAL RESEARCHN0001412C0671541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)$941K
Feb 24, 2017National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND15AC56C541712IGF::CT::IGF DEVELOP THE D8 AIRCRAFT DESIGN TO THE POINT THAT, COMBINED WITH OTHER PLANNED TECHNOLOGY, MATURATION, GOVERNMENT AND INDUSTRY CAN MAKE AN INFORMED DECISION REGARDING THE VIABILITY OF THE CONFIGURATION AS A COMMERCIAL PRODUCT THAT MEETS ARMD N+3 PERFORMANCE TARGETS; AND COMPLETE INITIAL DESIGN OF A HALF-SCALE D-8 DEMONSTRATOR AIRCRAFT THAT CAN BE USED TO FLIGHT VERIFY THE INTEGRATED D8 VEHICLE TECHNOLOGIES. THIS IS A REQUEST FOR QUOTE (RFQ) FOR OTHER THAN A COMMERCIAL ITEM OR SERVICE SUBJECT TO THE TERMS AND CONDITIONS OF FAR 52.213-4, TERMS AND CONDITIONS - SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL ITEMS), INCORPORATED INTO THIS REQUEST BY REFERENCE, AND ANY ADDITIONAL TERMS AND CONDITIONS INCORPORATED BY REFERENCE OR INCLUDED IN FULL TEXT. IN THE EVENT THAT A GSA SCHEDULE ITEM IS PROPOSED, ANY RESULTANT ORDER WILL BE SUBJECT TO THE TERMS AND CONDITIONS OF THE GSA SCHEDULE CONTRACT CITED AND ANY ADDITIONAL TERMS AND CONDITIONS LISTED IN THIS RFQ. QUOTE ON THE ATTACHED SPECIFICATION/DESCRIPTION/STATEMENT OF WORK. QUOTE ON THE ATTACHED SPECIFICATION/DESCRIPTION/STATEMENT OF WORK. QUOTE ON THE ATTACHED SPECIFICATION/DESCRIPTION/STATEMENT OF WORK. IGF::CT::IGF$1.5M
Feb 2, 2017Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001116C0049541712IGF::OT::IGF VERTICAL TAKEOFF AND LANDING (VTOL) X-PLANE PROGRAM PHASES 2 AND 3$22M
Feb 1, 2017Department of DefenseFA8620 AFLCMC WIJK BIG SAFARIFA862012C3027336411ACAT III, BIG SAFARI, ORION$630K
Feb 1, 2017National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL15AA01C541712IGF::OT::IGF NRA(NASA RESEARCH ANNOUNCEMENT)- PASSIVE AEROELASTIC TAILORING FOR NEXT-GENERATION HIGH ASPECT RATIO WINGS - THE CONTRACTOR SHALL DEVELOP ADVANCED AEROELASTIC TAILORING TECHNIQUES WHICH YIELD BENEFICIAL AEROELASTIC PERFORMANCE WITHOUT INTRODUCING A WEIGHT PENALTY COMPARED TO TRADITIONAL DESIGNS FOR TRANSPORT AIRCRAFT WINGS.$487K
Jan 31, 2017Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865017C2708541712IGF::OT::IGF ULTRALIGHTWEIGHT AIRFRAME CONCEPTS FOR AIR-LAUNCHED INTELLIGENCE, SURVEILLANCE, AND RECONNAISSANCE UAVS$563K
Dec 22, 2016Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833517C0107541712RESEARCH AND DEVELOPMENT IGF::OT::IGF$250K
Dec 1, 2016Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865012C7216541712URBAN BEAT COP$234K
Nov 16, 2016Department of DefenseOFFICE OF NAVAL RESEARCHN0001412C0671541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)$13M
Nov 16, 2016Department of DefenseOFFICE OF NAVAL RESEARCHN0001412C0671541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)$13M
Sep 27, 2016Department of DefenseW6QK ACC-RSAW31P4Q16C0089541712IGF::OT::IGF THIS CONTRACT IS FOR DARPA BAA EFFORT, "6U CUBESAT WITH DEFORMABLE MIRROR DEMONSTRATION PAYLOAD COMPATIBLE WITH ALASA LAUNCH."$1.6M
Sep 26, 2016Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001116C0049541712IGF::OT::IGF VERTICAL TAKEOFF AND LANDING (VTOL) X-PLANE PROGRAM PHASES 2 AND 3$6.0M
Sep 19, 2016Department of CommerceDEPT OF COMMERCE NOAADOCT0001541712IGF::OT::IGF SURVEY FLIGHTS TO PROVIDE GRAVITY DATA. FLIGHTS WILL BE IN THE SOUTHEASTERN OR SOUTHCENTRAL UNITED STATES FOR 25 DAYS STARTING MARCH 25, 2017.$298K
Sep 19, 2016Department of DefenseFA8620 AFLCMC WIJK BIG SAFARIFA862012C3027336411ACAT III, BIG SAFARI, ORION$40K
Sep 13, 2016Department of DefenseOFFICE OF NAVAL RESEARCHN0001412C0671541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)$9.1M
Sep 8, 2016Department of DefenseNAVSEA HQN0002415C4022541712BASE IGF::OT::IGF$500K
Sep 8, 2016National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND16XP01C541330IGF::OT::IGF ASSIST NASA IN DEFINING THE TECHNICAL APPROACH, SCHEDULE, AND COST FOR PROCEEDING WITH POTENTIAL X-PLANE PROCUREMENT(S) THAT SUPPORT ACCOMPLISHMENT OF NASA'S GOALS AND OBJECTIVES FOR THE ULTRA EFFICIENT SUBSONIC TRANSPORT THRUST.$2.9M
Aug 30, 2016Department of DefenseFA8501 OPL CONTRACTING AFSC/PZIOFA850115C0026541720IGF::OT::IGF SBIR PHASE II, TOPIC: AF141-214$514K
Aug 1, 2016Department of Transportation693JF9 HEADQUARTERSDTFAWA15A80014541330CLEEN II AURORA SCIENCES IGF::OT::IGF$961K
Jul 22, 2016Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001116C0049541712IGF::OT::IGF VERTICAL TAKEOFF AND LANDING (VTOL) X-PLANE PROGRAM PHASES 2 AND 3$541K
Jul 10, 2016Department of DefenseFA8620 AFLCMC WIJK BIG SAFARIFA862012C3027336411ACAT III, BIG SAFARI, ORION$2.9M
Jul 8, 2016Department of DefenseOFFICE OF NAVAL RESEARCHN0001416P3041541712STTRSOL2016.A IGF::CT::IGF$80K
Jul 8, 2016Department of DefenseNIWC ATLANTICN6523616C8008541712DFE PROTOTYPE IGF::OT::IGF$798K
Jun 27, 2016Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833515C0389541712RESEARCH AND DEVELOPMENT, SBIR PHASE I TOPIC N152-084, IGF::OT::IGF$70K
Jun 9, 2016National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTERNNX16CL79P541712IGF::OT::IGF OVER THE LAST 25 YEARS, UAS HAVE PROVEN TO BE VERY VALUABLE TOOLS FOR PERFORMING A WIDE RANGE OF OPERATIONS SUCH AS ENVIRONMENTAL DISASTER RELIEF, SEARCH AND RESCUE OPERATIONS, WILDFIRE SUPPRESSION, MULTI-ROBOT PLANETARY EXPLORATION, INTELLIGENCE, SURVEILLANCE, AND RECONNAISSANCE (ISR), PRECISION AGRICULTURE, AND WEATHER FORECASTING. ENVISIONED MISSIONS OFTEN INVOLVE EXECUTING SEVERAL DIFFERENT ACTIVITIES, SOMETIMES SIMULTANEOUSLY, WHERE AGENTS (UNMANNED AIR, SEA SURFACE, OR GROUND VEHICLE) MUST COORDINATE AND INTERACT WITH EACH OTHER TO PERFORM THE REQUISITE TASKS. AGENTS WITHIN THESE NETWORKED TEAMS ARE USUALLY HETEROGENEOUS, POSSESSING DIFFERENT RESOURCES AND CAPABILITIES, AND SOME AGENTS ARE BETTER SUITED TO HANDLE CERTAIN TYPES OF TASKS THAN OTHERS ? THIS LEADS TO DIFFERENT ROLES AND RESPONSIBILITIES WITHIN THE MISSION. IN OTHER SCENARIOS, INDEPENDENT VEHICLES, EACH WITH THEIR OWN GOALS, MUST OPERATE IN THE SAME SPACE WITHOUT INTERFERING WITH ONE ANOTHER . ENSURING PROPER COORDINATION AND COLLABORATION BETWEEN DIFFERENT AGENTS IS CRUCIAL TO EFFICIENT AND SUCCESSFUL OPERATIONS, MOTIVATING THE DEVELOPMENT OF AUTONOMOUS PLANNING METHODS FOR HETEROGENEOUS NETWORKED TEAMS. REDUCING THE NECESSITY FOR PERFECT COMMUNICATION IS ALSO CRITICAL. SINCE OPERATIONS INVOLVE DYNAMIC ENVIRONMENTS, WITH SITUATIONAL AWARENESS AND UNDERLYING MODELS CHANGING RAPIDLY AS NEW INFORMATION IS ACQUIRED, SO PLANNING STRATEGIES MUST BE COMPUTATIONALLY EFFICIENT TO ADJUST SOLUTIONS IN REAL TIME. WE PROPOSE TO DEVELOP THE TOOL FOR COLLABORATIVE AUTONOMY (TCA) THAT WILL PROVIDE AN AUTOMATED PLANNING CAPABILITY THAT ROUTES ASSETS TO OPTIMIZE OVERALL AIRSPACE UTILIZATION (E.G. IN TRAFFIC MANAGEMENT SCENARIOS) OR OPERATIONAL EFFECTIVENESS (E.G. IN COOPERATIVE SCENARIOS), AND TO ENSURE SPATIAL AND TEMPORAL DECONFLICTION/SYNCHRONIZATION OF THE TEAM UNDER DYNAMICALLY CHANGING ENVIRONMENTS WHILE CONSIDERING COST FACTORS (E.G. FUEL AND TIME), AVAILABLE RESOURCES AND NETWORK CONSTRAINTS.$125K
Jun 9, 2016National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTERNNX16CP26P541712IGF::OT::IGF FRACTIONATED SPACECRAFT ARCHITECTURES TO DISTRIBUTE MISSION PERFORMANCE FROM A SINGLE, MONOLITHIC SATELLITE ACROSS LARGE NUMBER OF SMALLER SPACECRAFT, FOR MISSIONS LIKE CLOSE PROXIMITY INSPECTION, SPARSE APERTURE ARRAYS, ROBOTIC ASSEMBLY, SERVICING, REFUELING, ETC., CAN ENABLE HIGHER MISSION CAPABILITY, RECONFIGURABILITY AND ROBUSTNESS. THIS DISTRIBUTED SATELLITE ARCHITECTURE, WITH LARGE NUMBERS OF AGENTS, COMES AT THE COST OF EXTENSIVE MISSION PLANNING AND COMPUTATIONAL COMPLEXITY, AND GREATER RISK OF COLLISIONS. AS MISSION PROFILES SCALE UP TO HUNDREDS OF AGENTS, THERE IS AN EXPONENTIAL INCREASE IN THE SYSTEM COMPLEXITY NEEDED TO BOTH PLAN AND CONTROL SATELLITE SWARM ACTIVITY AND ENSURE IT OPERATES SAFELY IN THE ENVIRONMENT DENSELY POPULATED BY OTHER AGENTS. AURORA FLIGHT SCIENCES AND THE MIT SPACE SYSTEMS LAB PROPOSE A NOVEL AND COMPREHENSIVE SWARM COORDINATION AND PLANNING TOOL THAT WILL ALLOW GROUND-BASED OPERATORS TO PROVIDE HIGH LEVEL MISSION GOALS, AND OBSERVE AND RE-DIRECT SWARMS OF SPACECRAFT IN LEO AS THE AUTONOMY DYNAMICALLY PLANS AND EXECUTES COMPLEX MULTI-AGENT MISSIONS. THE PROPOSED EFFORT COMBINES ELEMENTS OF AUTONOMOUS, DYNAMIC, MULTI-VEHICLE COORDINATION AND PATH PLANNING TO MEET MISSION OBJECTIVES, FACILITATES CLOSE-PROXIMITY OPERATIONS BY INTEGRATING SENSORS AND SOFTWARE FOR COLLISION DETECTION AND AVOIDANCE, AND ALLOWS HIGH-LEVEL ?HUMAN-IN-THE-LOOP? CONTROL OF CRITICAL MISSION PERFORMANCE BY IMPLEMENTING A HUMAN-SWARM INTERFACE. PHASE I FOCUSES ON DEVELOPING AND SIMULATING DISCRETE ELEMENTS OF THE CONCEPTUAL TOOL, LEVERAGING POWERFUL TASK ALLOCATION AND PATH PLANNING ALGORITHMS THAT AURORA HAS DEVELOPED OVER THE PAST SEVERAL YEARS, COUPLED WITH MIT?S AUTONOMOUS COLLISION DETECTION&AVOIDANCE AND HUMAN SWARM INTERFACES. IN PHASE II WE WILL INTEGRATE THE MODULES WITH A SPACE MISSION ANALYSIS TOOL AND DEMONSTRATE PERFORMANCE OF KEY TECHNOLOGIES ON THE SPHERES HARDWARE TESTBED.$125K
May 27, 2016Department of DefenseFA8501 OPL CONTRACTING AFSC/PZIOFA850115C0026541720IGF::OT::IGF SBIR PHASE II, TOPIC: AF141-214$149K
May 11, 2016Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001115C0027541712IGF::OT::IGF AIRCREW LABOR IN-COCKPIT AUTOMATION SYSTEM (ALIAS)$300K
Apr 25, 2016Department of DefenseFA8620 AFLCMC WIJK BIG SAFARIFA862012C3027336411ACAT III, BIG SAFARI, ORION$727K
Apr 21, 2016Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001116C0049541712IGF::OT::IGF VERTICAL TAKEOFF AND LANDING (VTOL) X-PLANE PROGRAM PHASES 2 AND 3$70K
Apr 14, 2016National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTERNNX16CC09C541712IGF::OT::IGF A MAJOR MARKET FOR VERTICAL LIFT AIRCRAFT IS IN URBAN OPERATIONS, PRIMARILY FOR POLICE AND ELECTRONIC NEWS GATHERING (TYPICALLY A BELL 206 OR A EUROCOPTER AS350). MANNED SYSTEMS ARE MORE COSTLY TO OPERATE AND HAVE A MUCH LARGER OPERATIONAL FOOTPRINT THAN THEIR UNMANNED COUNTERPARTS. BUT THE UNMANNED MULTIROTOR DOES NOT HAVE THE RANGE AND ENDURANCE TO COMPETE WITH THE MANNED SYSTEMS. AURORA FLIGHT SCIENCES BELIEVES THAT THE PASSIVE MILLER CYCLE (PMC) SERIES HYBRID SYSTEM IS A VIABLE WAY TO ACHIEVE THE RANGE AND ENDURANCE REQUIRED TO PENETRATE THE MANNED VEHICLE MARKET. THE PMC, LIKE THE TYPICAL MILLER CYCLE, USES DELAYED INTAKE VALVE TIMING THAT ALLOWS THE EXPANSION RATIO TO BE GREATER THAN THE COMPRESSION RATIO; REDUCING PUMPING LOSSES AND GIVING GREATER ENERGY EXTRACTION. BUT THE PMC DOES NOT USE A POSITIVE DISPLACEMENT SUPERCHARGER. THE DELAYED INTAKE VALVE CLOSING ALSO ALLOWS THE PMC GREATER QUENCH IN THE COMBUSTION CHAMBER TO CONFRONT THE FUEL DROPLET ISSUE ASSOCIATED WITH SMALL ENGINES. THE DELAYED VALVE TIMING ALSO ALLOWS THE GENERATOR IN THE HYBRID SYSTEM TO BE OPTIMIZED FOR POWER GENERATION WHILE STILL BEING USED AS THE ENGINE STARTER. BASED ON THE MODELS DEVELOPED IN THE PHASE I PROGRAM, AURORA WILL DESIGN, PROCURE, AND INTEGRATE THE COMPONENTS REQUIRED TO DEMONSTRATE THE PASSIVE MILLER CYCLE (PMC) IN A SERIES HYBRID ARCHITECTURE. THE TEST SYSTEM WILL BE USED TO CALIBRATE PHASE I MODELS AND DESIGN A MULTIROTOR USING THE PMC HYBRID SYSTEM THAT WILL BE ABLE TO PERFORM POLICE AND NEWS GATHERING MISSIONS.$750K

Get Alerted Before Aurora Flight Sciences Corporation's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free