Skip to content

Federal Contractor Profile

Blue Origin Washington, LLC

$2.2B obligated·75 awards·2 agencies·5 NAICS

Federal Contracts

Showing award actions 101–150 of 152 funded award actions, most recent first.

Contracts with positive obligations
75
Funded award actions shown
152
Obligations shown
$2.2B
Awarding agencies
2

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of November 2, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Jul 28, 2021National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC19C0005541715NASA RESEARCH ANNOUNCEMENT NRA SPACE TECHNOLOGY RESEARCH DEVELOPMENT, DEMONSTRATION, AND INFUSION 2018 SPACETECH REDDI 2018 THIS CONTRACT IS FOR WORK SUPPORTING STMD TECHNOLOGY DEVELOPMENT OBJECTIVES. DURING THE EXECUTION OF THIS CONTRACT, BLUE ORIGIN (THE CONTRACTOR) SHALL RECEIVE AND INTEGRATE PRECISION LANDING SENSORS (AND SUPPORT EQUIPMENT AS REQUIRED) AND CONDUCT TWO TEST FLIGHTS. THE CONTRACTOR, IN COORDINATION WITH NASA, SHALL DEVELOP A MUTUALLY AGREED TO TEST PLAN DEFINING THE OPERATIONAL ENVIRONMENT (INCLUDING, BUT NOT LIMITED TO, INSTALLATION LOCATION AND SENSOR VIEW) FOR THE SENSORS DURING FLIGHT OPERATION THEREBY ESTABLISHING THE TEST AND DEMONSTRATION ENVIRONMENT FOR THE SENSOR TECHNOLOGY. THE CONTRACTOR SHALL REPORT PROGRESS AND RESULTS OF WORK PERFORMED UNDER THIS CONTRACT THROUGH PERIODIC PROGRESS REPORTS, POST-FLIGHT ANALYSIS REPORTS, AND A FINAL REPORT SUMMARIZING THE RESULTS OF THE ENTIRE CONTRACT WORK.$256K
Jul 13, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0138481212SUBORBITAL CREW (SUBC) DATE REVIEW$200K
Mar 8, 2021National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC19C0005541715NASA RESEARCH ANNOUNCEMENT NRA SPACE TECHNOLOGY RESEARCH DEVELOPMENT, DEMONSTRATION, AND INFUSION 2018 SPACETECH REDDI 2018 THIS CONTRACT IS FOR WORK SUPPORTING STMD TECHNOLOGY DEVELOPMENT OBJECTIVES. DURING THE EXECUTION OF THIS CONTRACT, BLUE ORIGIN (THE CONTRACTOR) SHALL RECEIVE AND INTEGRATE PRECISION LANDING SENSORS (AND SUPPORT EQUIPMENT AS REQUIRED) AND CONDUCT TWO TEST FLIGHTS. THE CONTRACTOR, IN COORDINATION WITH NASA, SHALL DEVELOP A MUTUALLY AGREED TO TEST PLAN DEFINING THE OPERATIONAL ENVIRONMENT (INCLUDING, BUT NOT LIMITED TO, INSTALLATION LOCATION AND SENSOR VIEW) FOR THE SENSORS DURING FLIGHT OPERATION THEREBY ESTABLISHING THE TEST AND DEMONSTRATION ENVIRONMENT FOR THE SENSOR TECHNOLOGY. THE CONTRACTOR SHALL REPORT PROGRESS AND RESULTS OF WORK PERFORMED UNDER THIS CONTRACT THROUGH PERIODIC PROGRESS REPORTS, POST-FLIGHT ANALYSIS REPORTS, AND A FINAL REPORT SUMMARIZING THE RESULTS OF THE ENTIRE CONTRACT WORK.$259K
Feb 26, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0159481212INTEGRATION AND FLIGHT OF T0003-SPACECRAFT ON-ORBIT ADVANCED REFUELING AND STORAGE (SOARS) PAYLOAD$13K
Feb 25, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0067481212INTEGRATIONS AND FLIGHT OF EDUCATIONAL STUDENT COMPETITION PAYLOADS$290K
Feb 23, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0063481212INTEGRATION AND FLIGHT OF LUNAR GRAVITATIONAL ACCELERATION PAYLOADS$200K
Feb 23, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0063481212INTEGRATION AND FLIGHT OF LUNAR GRAVITATIONAL ACCELERATION PAYLOADS$339K
Feb 23, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0063481212INTEGRATION AND FLIGHT OF LUNAR GRAVITATIONAL ACCELERATION PAYLOADS$272K
Feb 23, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0063481212INTEGRATION AND FLIGHT OF LUNAR GRAVITATIONAL ACCELERATION PAYLOADS$1.2M
Feb 23, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0063481212INTEGRATION AND FLIGHT OF LUNAR GRAVITATIONAL ACCELERATION PAYLOADS$344K
Feb 23, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0063481212INTEGRATION AND FLIGHT OF LUNAR GRAVITATIONAL ACCELERATION PAYLOADS$1.0M
Jan 25, 2021National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0043481212NON-STANDARD SERVICES FOR FLIGHT OPPORTUNITIES EDUCATIONAL STUDENT COMPETITION ENGAGING SUBORBITAL FLIGHT PROVIDERS$9K
Dec 16, 2020National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC021C0009336414NASA LAUNCH SERVICES (NLS) II CONTRACT$20K
Oct 20, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0012481212INTEGRATION AND FLIGHT OF T0262-INVESTIGATION OF GRAVITY EFFECTS ON ELECTRICALLY DRIVEN LIQUID FILM BOILING (EHD-LFB) PAYLOAD$177K
Oct 20, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0012481212INTEGRATION AND FLIGHT OF T0262-INVESTIGATION OF GRAVITY EFFECTS ON ELECTRICALLY DRIVEN LIQUID FILM BOILING (EHD-LFB) PAYLOAD$44K
Sep 24, 2020National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC19C0005541715NASA RESEARCH ANNOUNCEMENT NRA SPACE TECHNOLOGY RESEARCH DEVELOPMENT, DEMONSTRATION, AND INFUSION 2018 SPACETECH REDDI 2018 THIS CONTRACT IS FOR WORK SUPPORTING STMD TECHNOLOGY DEVELOPMENT OBJECTIVES. DURING THE EXECUTION OF THIS CONTRACT, BLUE ORIGIN (THE CONTRACTOR) SHALL RECEIVE AND INTEGRATE PRECISION LANDING SENSORS (AND SUPPORT EQUIPMENT AS REQUIRED) AND CONDUCT TWO TEST FLIGHTS. THE CONTRACTOR, IN COORDINATION WITH NASA, SHALL DEVELOP A MUTUALLY AGREED TO TEST PLAN DEFINING THE OPERATIONAL ENVIRONMENT (INCLUDING, BUT NOT LIMITED TO, INSTALLATION LOCATION AND SENSOR VIEW) FOR THE SENSORS DURING FLIGHT OPERATION THEREBY ESTABLISHING THE TEST AND DEMONSTRATION ENVIRONMENT FOR THE SENSOR TECHNOLOGY. THE CONTRACTOR SHALL REPORT PROGRESS AND RESULTS OF WORK PERFORMED UNDER THIS CONTRACT THROUGH PERIODIC PROGRESS REPORTS, POST-FLIGHT ANALYSIS REPORTS, AND A FINAL REPORT SUMMARIZING THE RESULTS OF THE ENTIRE CONTRACT WORK.$151K
Sep 10, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0157481212INTEGRATION AND RE-FLIGHT OF T0247 ORBITAL SYNGAS COMMODITY AUGMENTATION REACTOR(OSCAR) PAYLOAD$553K
Sep 10, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0159481212INTEGRATION AND FLIGHT OF T0003-SPACECRAFT ON-ORBIT ADVANCED REFUELING AND STORAGE (SOARS) PAYLOAD$193K
Sep 10, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0159481212INTEGRATION AND FLIGHT OF T0003-SPACECRAFT ON-ORBIT ADVANCED REFUELING AND STORAGE (SOARS) PAYLOAD$55K
Aug 11, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC18F0085481212INTEGRATION AND FLIGHT OF THE EVALUATION OF GRAVITY SENSING MECHANISMS IN TISSUE-ENGINEERED SKELETAL MUSCLE PAYLOAD. THIS PAYLOAD IS IN COLLABORATION WITH UNIVERSITY OF OHIO UNDER THE NASA UNDERGRADUATE STUDENT INSTRUMENT PROJECT (USIP),$7K
Aug 3, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0137481212INTEGRATION AND FLIGHT OF T0251 IN- SPACE COATING DEVELOPMENT UTILIZING ATOMIC LAYER DEPOSITION (ALD) PAYLOAD$126K
Aug 3, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0138481212PURCHASE OF A DEMONSTRATION SINGLE PAYLOAD LOCKER$7K
Aug 3, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0137481212INTEGRATION AND FLIGHT OF T0251 IN- SPACE COATING DEVELOPMENT UTILIZING ATOMIC LAYER DEPOSITION (ALD) PAYLOAD$72K
Jun 18, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0115481212INTEGRATION AND FLIGHT OF T0250 ADVANCING FIBER OPTIC SENSING TECHNOLOGY FOR SPACE APPLICATIONS (FOSS)$166K
Jan 28, 2020National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC20F0064481212INTEGRATION AND FLIGHT OF T0173 FLOW BOILING IN MICROGAP COOLERS PAYLOAD$96K
Jan 2, 2020Department of DefenseFA8811 ASSRD ACSS TO SPC SSC/AAK-LAFA881119C0007481212PHASE 2 EARLY INTEGRATION STUDIES FOR BLUE ORIGIN$1.5M
Nov 18, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0041481212ENHANCED LANDING AND MOBILITY STUDY$25K
Sep 20, 2019Department of DefenseFA8811 ASSRD ACSS TO SPC SSC/AAK-LAFA881119C0007481212PHASE 2 EARLY INTEGRATION STUDIES FOR BLUE ORIGIN$1.3M
Aug 28, 2019National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC19C0005541715NASA RESEARCH ANNOUNCEMENT NRA SPACE TECHNOLOGY RESEARCH DEVELOPMENT, DEMONSTRATION, AND INFUSION 2018 SPACETECH REDDI 2018 THIS CONTRACT IS FOR WORK SUPPORTING STMD TECHNOLOGY DEVELOPMENT OBJECTIVES. DURING THE EXECUTION OF THIS CONTRACT, BLUE ORIGIN (THE CONTRACTOR) SHALL RECEIVE AND INTEGRATE PRECISION LANDING SENSORS (AND SUPPORT EQUIPMENT AS REQUIRED) AND CONDUCT TWO TEST FLIGHTS. THE CONTRACTOR, IN COORDINATION WITH NASA, SHALL DEVELOP A MUTUALLY AGREED TO TEST PLAN DEFINING THE OPERATIONAL ENVIRONMENT (INCLUDING, BUT NOT LIMITED TO, INSTALLATION LOCATION AND SENSOR VIEW) FOR THE SENSORS DURING FLIGHT OPERATION THEREBY ESTABLISHING THE TEST AND DEMONSTRATION ENVIRONMENT FOR THE SENSOR TECHNOLOGY. THE CONTRACTOR SHALL REPORT PROGRESS AND RESULTS OF WORK PERFORMED UNDER THIS CONTRACT THROUGH PERIODIC PROGRESS REPORTS, POST-FLIGHT ANALYSIS REPORTS, AND A FINAL REPORT SUMMARIZING THE RESULTS OF THE ENTIRE CONTRACT WORK.$386K
Aug 21, 2019National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC19F0231481212INTEGRATION AND FLIGHT OF T0022 EMSS PAYLOAD$285K
Jun 24, 2019National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC19C0005541715NASA RESEARCH ANNOUNCEMENT NRA SPACE TECHNOLOGY RESEARCH DEVELOPMENT, DEMONSTRATION, AND INFUSION 2018 SPACETECH REDDI 2018 THIS CONTRACT IS FOR WORK SUPPORTING STMD TECHNOLOGY DEVELOPMENT OBJECTIVES. DURING THE EXECUTION OF THIS CONTRACT, BLUE ORIGIN (THE CONTRACTOR) SHALL RECEIVE AND INTEGRATE PRECISION LANDING SENSORS (AND SUPPORT EQUIPMENT AS REQUIRED) AND CONDUCT TWO TEST FLIGHTS. THE CONTRACTOR, IN COORDINATION WITH NASA, SHALL DEVELOP A MUTUALLY AGREED TO TEST PLAN DEFINING THE OPERATIONAL ENVIRONMENT (INCLUDING, BUT NOT LIMITED TO, INSTALLATION LOCATION AND SENSOR VIEW) FOR THE SENSORS DURING FLIGHT OPERATION THEREBY ESTABLISHING THE TEST AND DEMONSTRATION ENVIRONMENT FOR THE SENSOR TECHNOLOGY. THE CONTRACTOR SHALL REPORT PROGRESS AND RESULTS OF WORK PERFORMED UNDER THIS CONTRACT THROUGH PERIODIC PROGRESS REPORTS, POST-FLIGHT ANALYSIS REPORTS, AND A FINAL REPORT SUMMARIZING THE RESULTS OF THE ENTIRE CONTRACT WORK.$382K
May 15, 2019National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC19F0172481212INTEGRATION AND FLIGHT OF T0023 ASME PAYLOAD$122K
May 10, 2019National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC19F0169481212IG::OT::IG STANDARD AND NON STANDARD SERVICES FOR T0053 FLEX PAYLOAD$117K
May 10, 2019National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC19F0167481212IGF::OT::IGF STANDARD AND NON-STANDARDS SERVICES FOR T0052 CORE PAYLOAD$97K
Apr 19, 2019National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC19C0005541715NASA RESEARCH ANNOUNCEMENT NRA SPACE TECHNOLOGY RESEARCH DEVELOPMENT, DEMONSTRATION, AND INFUSION 2018 SPACETECH REDDI 2018 THIS CONTRACT IS FOR WORK SUPPORTING STMD TECHNOLOGY DEVELOPMENT OBJECTIVES. DURING THE EXECUTION OF THIS CONTRACT, BLUE ORIGIN (THE CONTRACTOR) SHALL RECEIVE AND INTEGRATE PRECISION LANDING SENSORS (AND SUPPORT EQUIPMENT AS REQUIRED) AND CONDUCT TWO TEST FLIGHTS. THE CONTRACTOR, IN COORDINATION WITH NASA, SHALL DEVELOP A MUTUALLY AGREED TO TEST PLAN DEFINING THE OPERATIONAL ENVIRONMENT (INCLUDING, BUT NOT LIMITED TO, INSTALLATION LOCATION AND SENSOR VIEW) FOR THE SENSORS DURING FLIGHT OPERATION THEREBY ESTABLISHING THE TEST AND DEMONSTRATION ENVIRONMENT FOR THE SENSOR TECHNOLOGY. THE CONTRACTOR SHALL REPORT PROGRESS AND RESULTS OF WORK PERFORMED UNDER THIS CONTRACT THROUGH PERIODIC PROGRESS REPORTS, POST-FLIGHT ANALYSIS REPORTS, AND A FINAL REPORT SUMMARIZING THE RESULTS OF THE ENTIRE CONTRACT WORK.$534K
Apr 2, 2019National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC19F0106481212T0168 SFEM-2 PAYLOAD FLIGHT$97K
Apr 2, 2019National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC19F0103481212T0173 FBMC PAYLOAD FLIGHT$92K
Mar 11, 2019National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND16AP05T481212IGF::OT::IGF SUBORBITAL, REUSABLE, LAUNCH VEHICLE$1K
Feb 28, 2019National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC19F0079481212IGF::OT::IGF STANDARD AND NON-STANDARD SERVICES FOR OSCAR PAYLOAD$442K
Sep 17, 2018National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND16AP05T481212IGF::OT::IGF SUBORBITAL, REUSABLE, LAUNCH VEHICLE$13K
Aug 27, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018C0019541715BLUE ORIGIN STUDY FOR COMMERCIALIZATION OF LOW EARTH ORBIT CONTRACT - 8800000987$975K
Aug 23, 2018National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC18P3266336414OT:: THIS IS A PURCHASE ORDER FOR NEXTSTEP BAA APPENDIX D (IN-SITU RESOURCE UTILIZATION).$45K
Aug 15, 2018National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC18F0141481212SPECIAL STUDY FOR OSCAR PAYLOAD$101K
Apr 9, 2018National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC18F0085481212INTEGRATION AND FLIGHT OF THE EVALUATION OF GRAVITY SENSING MECHANISMS IN TISSUE-ENGINEERED SKELETAL MUSCLE PAYLOAD. THIS PAYLOAD IS IN COLLABORATION WITH UNIVERSITY OF OHIO UNDER THE NASA UNDERGRADUATE STUDENT INSTRUMENT PROJECT (USIP),$103K
Apr 9, 2018National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC18F0087481212INTEGRATION AND FLIGHT OF THE CHARACTERIZATION OF 3D PRINTING PROCESSES UNDER MICROGRAVITY CONDITIONS PAYLOAD ON BLUE ORIGIN CREW CAPSULE V2.0. THIS PAYLOAD IS IN COLLABORATION WITH UNIVERSITY OF KENTUCKY UNDER THE NASA UNDERGRADUATE STUDENT INSTRUMENT PROJECT (USIP).$77K
Mar 26, 2018National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND17AP01T481212IGF::OT::IGF AUTONOMOUS FLIGHT TERMINATION SYSTEM$99K
Mar 8, 2018National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND16AP05T481212IGF::OT::IGF SUBORBITAL, REUSABLE, LAUNCH VEHICLE$65K
Jun 29, 2017National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND16AP05T481212IGF::OT::IGF SUBORBITAL, REUSABLE, LAUNCH VEHICLE$269K
Feb 27, 2017National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND16AP05T481212IGF::OT::IGF SUBORBITAL, REUSABLE, LAUNCH VEHICLE$66K
Nov 22, 2016National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTRNND17AP01T481212IGF::OT::IGF AUTONOMOUS FLIGHT TERMINATION SYSTEM$161K

Get Alerted Before Blue Origin Washington, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free