Skip to content

Federal Contractor Profile

Bryant's Land And Development Industries, INC.

$145M obligated·75 awards·6 agencies·6 NAICS

Federal Contracts

Showing award actions 51–100 of 114 funded award actions, most recent first.

Contracts with positive obligations
75
Funded award actions shown
114
Obligations shown
$145M
Awarding agencies
6

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of November 4, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Jan 13, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F000016237310PROJECT NP-GRSM 17(1): THE PROJECT CONSISTS OF RESURFACING CLINGMANS DOME ACCESS ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, REMOVAL OF EXISTING PAVEMENT$2.7M
Nov 4, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F000003237310PROJECT TN ERFO NP GRSM 2020-1(1): THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON TOWNSEND ENTRANCE ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REMOVING A PAVED PULL-OFF, CONSTRUCTING A ROCKERY, PLACING AND GROUTING RI$623K
Aug 10, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000092237310PROJECT NP SER PMS FY20(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN THE ANDREW JOHNSON NATIONAL HISTORIC SITE. THE WORK INCLUDES MICRO SURFACING AND OTHER MISCELLANEOUS WORK.$348K
Aug 4, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000004237310NP-GRSM (10N(1) AND 10N(2) THE PROJECT CONSISTS OF REHABILITATING APPROXIMATELY 2.44 MILES OF NEWFOUND GAP ROAD FROM MP 12.32 TO MP 14.76 AND RESURFACING APPROXIMATELY 6.18 MILES OF NEWFOUND GAP ROAD FROM MP 6.14 TO MP 12.32, INCLUDING PARKING AREAS$70K
Jul 26, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000003237310PROJECT NP-BLRI 2J17 THE PROJECT INCLUDES INSTALLING A DRAINAGE SYSTEM, REPLACEMENT OF ASPHALT CONCRETE PAVEMENT, INSTALLATION OF LIGHTWEIGHT CONCRETE SLAB, REPLACING BRIDGE SIDEWALK, REPLACING AND RESETTING BRIDGE CURB, REPLACING STONE MASONRY AT P$31K
Jun 30, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000018237310PROJECT NP-FOOT PMS(2) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT CONCRETE PAVEMENT AND CHIP SEAL), CRACK SEALING, FILLING, AND SEALING, ASPHALT PAVEMENT PATCHING, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK ON THE FOOTHI$4.8M
May 24, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000068237310PROJECT NP-GRSM 26(2),137(1) THE PROJECT CONSISTS OF RESURFACING CADES COVE LOOP ROAD AND CADES COVE CAMPGROUND ENTRANCE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT$2.2M
Feb 24, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7320C000018237310PROJECT NP BISO 10(2): THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 7.6 MILES OF THE LEATHERWOOD FORD ROAD, INCLUDING THE RESURFACING OF THE BANDY CREEK BRIDGE AND CUMBERLAND RIVER BRIDGE. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FUL$683K
Feb 24, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000003237310PROJECT NP-BLRI 2J17 THE PROJECT INCLUDES INSTALLING A DRAINAGE SYSTEM, REPLACEMENT OF ASPHALT CONCRETE PAVEMENT, INSTALLATION OF LIGHTWEIGHT CONCRETE SLAB, REPLACING BRIDGE SIDEWALK, REPLACING AND RESETTING BRIDGE CURB, REPLACING STONE MASONRY AT P$121K
Dec 15, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000004237310NP-GRSM (10N(1) AND 10N(2) THE PROJECT CONSISTS OF REHABILITATING APPROXIMATELY 2.44 MILES OF NEWFOUND GAP ROAD FROM MP 12.32 TO MP 14.76 AND RESURFACING APPROXIMATELY 6.18 MILES OF NEWFOUND GAP ROAD FROM MP 6.14 TO MP 12.32, INCLUDING PARKING AREAS$8.5M
Dec 11, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000003237310PROJECT NP-BLRI 2J17 THE PROJECT INCLUDES INSTALLING A DRAINAGE SYSTEM, REPLACEMENT OF ASPHALT CONCRETE PAVEMENT, INSTALLATION OF LIGHTWEIGHT CONCRETE SLAB, REPLACING BRIDGE SIDEWALK, REPLACING AND RESETTING BRIDGE CURB, REPLACING STONE MASONRY AT P$2.2M
Jul 28, 2020Department of the InteriorSER NORTH MABO (53000)140P5320C0034237310BLUE RIDGE PARKWAY INSTALL&REPLACE GUARDRAIL SECTIONS$74K
Jun 30, 2020Department of the InteriorSER NORTH MABO (53000)140P5320C0024237310BLUE RIDGE PARKWAY, GILLESPIE GAP, ROAD REPAIRS$52K
May 28, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7320C000018237310PROJECT NP BISO 10(2): THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 7.6 MILES OF THE LEATHERWOOD FORD ROAD, INCLUDING THE RESURFACING OF THE BANDY CREEK BRIDGE AND CUMBERLAND RIVER BRIDGE. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FUL$92K
May 28, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7320C000018237310PROJECT NP BISO 10(2): THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 7.6 MILES OF THE LEATHERWOOD FORD ROAD, INCLUDING THE RESURFACING OF THE BANDY CREEK BRIDGE AND CUMBERLAND RIVER BRIDGE. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FUL$7.6M
Apr 21, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000008237310PROJECT NP SER PMS FY18(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN CAPE HATTERAS NATIONAL SEASHORE, FORT RALEIGH NATIONAL HISTORIC SITE, AND WRIGHT BROTHERS NATIONAL MEMORIAL. THE WORK INCLUDES THIN ASPHALT PAVEMENT OVERLAY, CHIP SEAL, MICRO SURFACING, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKING INSTALLATION, AND OTHER MISCELLANEOUS WORK.$23K
Apr 8, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000030237310PROJECT GRSM 15(1) THE PROJECT CONSISTS OF REPAIRING THE BOTE MOUNTAIN TUNNEL AND MILLING AND OVERLAY OF APPROXIMATELY 0.15-MILE OF LAUREL CREEK ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REPAIR TO THE CONCRETE LINING, R$32K
Apr 7, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000032237310BLRI 2H14$5K
Mar 25, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000051237310PROJECT: NP-NACE 17(2), 18(2), 19(2), 118(1), 206(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF FORT DUPONT DRIVE, FORT DAVIS DRIVE, RIDGE PICNIC AREA, RIDGE PICNIC AREA LOOP, AND THE RECONSTRUCTION OF LANHAM ESTATES LOOP ROAD. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADWAY EXCAVATION, SEPARATION-STABILIZATION GEOTEXTILE INSTALLATION, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAVEMENT PATCHING, ASPHALT PAVEMENT OVERLAY, DRAINAGE IMPROVEMENTS AND REPLACEMENTS, INSTALLATION OF PERMANENT STORMWATER MANAGEMENT BMPS, LANDSCAPING AND OTHER MISCELLANEOUS WORK.$135K
Sep 3, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000030237310PROJECT GRSM 15(1) THE PROJECT CONSISTS OF REPAIRING THE BOTE MOUNTAIN TUNNEL AND MILLING AND OVERLAY OF APPROXIMATELY 0.15-MILE OF LAUREL CREEK ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REPAIR TO THE CONCRETE LINING, R$951K
Jun 27, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000008237310PROJECT NP SER PMS FY18(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN CAPE HATTERAS NATIONAL SEASHORE, FORT RALEIGH NATIONAL HISTORIC SITE, AND WRIGHT BROTHERS NATIONAL MEMORIAL. THE WORK INCLUDES THIN ASPHALT PAVEMENT OVERLAY, CHIP SEAL, MICRO SURFACING, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKING INSTALLATION, AND OTHER MISCELLANEOUS WORK.$800K
May 15, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000046237310PROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK.$0
Mar 14, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000008237310PROJECT NP SER PMS FY18(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN CAPE HATTERAS NATIONAL SEASHORE, FORT RALEIGH NATIONAL HISTORIC SITE, AND WRIGHT BROTHERS NATIONAL MEMORIAL. THE WORK INCLUDES THIN ASPHALT PAVEMENT OVERLAY, CHIP SEAL, MICRO SURFACING, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKING INSTALLATION, AND OTHER MISCELLANEOUS WORK.$6.9M
Nov 27, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000046237310PROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK.$1.0M
Sep 6, 2018Department of the InteriorFWS SOUTHEAST REGIONAL OFFICE140F0418P0326237310IGF::OT::IGF ROUTE#300 SAVANNAH PAVING PROJ$147K
Aug 30, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000051237310PROJECT: NP-NACE 17(2), 18(2), 19(2), 118(1), 206(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF FORT DUPONT DRIVE, FORT DAVIS DRIVE, RIDGE PICNIC AREA, RIDGE PICNIC AREA LOOP, AND THE RECONSTRUCTION OF LANHAM ESTATES LOOP ROAD. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADWAY EXCAVATION, SEPARATION-STABILIZATION GEOTEXTILE INSTALLATION, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAVEMENT PATCHING, ASPHALT PAVEMENT OVERLAY, DRAINAGE IMPROVEMENTS AND REPLACEMENTS, INSTALLATION OF PERMANENT STORMWATER MANAGEMENT BMPS, LANDSCAPING AND OTHER MISCELLANEOUS WORK.$3.2M
Aug 1, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000046237310PROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK.$45K
Jul 3, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000046237310PROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK.$2.8M
May 29, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000033237310IGF::OT::IGF PROJECT NO. NP - GRSM 15(2), 16(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 7.7 MILES OF LAUREL CREEK ROAD, 0.8 MILES OF TOWNSEND ENTRANCE ROAD, AND 2.0 MILES OF TREMONT ROAD, INCLUDING NUMEROUS PARKING AREAS AND PULL-OFFS, ALL WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, TRAFFIC DETECTOR LOOP AND PERMANENT SIGN REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$35K
Apr 26, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000032237310BLRI 2H14$341K
Apr 16, 2018Department of DefenseW7NS USPFO ACTIVITY NC ARNGW9124218C5000237310IGF::OT::IGF CONSTRUCT CONNECTOR ROAD$372K
Feb 22, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000033237310IGF::OT::IGF PROJECT NO. NP - GRSM 15(2), 16(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 7.7 MILES OF LAUREL CREEK ROAD, 0.8 MILES OF TOWNSEND ENTRANCE ROAD, AND 2.0 MILES OF TREMONT ROAD, INCLUDING NUMEROUS PARKING AREAS AND PULL-OFFS, ALL WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, TRAFFIC DETECTOR LOOP AND PERMANENT SIGN REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$2.5M
Feb 9, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000032237310BLRI 2H14$1.9M
Oct 13, 2017Department of AgricultureSOUTHERN RESEARCH STATIONAG4568P170008561730IGF::OT::IGF CLEARING OF STORM DEBRIS FROM ROADS AND SITES COR - DREW SELIG 828-257-4209$5K
Sep 27, 2017Department of AgricultureSOUTHERN RESEARCH STATIONAG4568P170008561730IGF::OT::IGF CLEARING OF STORM DEBRIS FROM ROADS AND SITES COR - DREW SELIG 828-257-4209$13K
Sep 5, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00004237310IGF::OT::IGF PROJECT FW-GRDI 105(1)$61K
Aug 17, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00019237310IGF::OT::IGF PROJECT: FTNP-BLRI 2A15 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 12 MILES OF THE BLUE RIDGE PARKWAY FROM MILEPOST (MP) 217.17 TO MP 229.68, INCLUDING THE EXIT/ENTRANCE RAMPS TO N.C. ROUTE 18 AND U.S. ROUTE 21, AND THREE PARKING AREAS/OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL AND PARTIAL DEPTH PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT OVERLAY, BRIDGE JOINT CLEANING AND RESEALING, STONE MASONRY REPAIRS, DRAINAGE REPLACEMENTS, RIPRAP INSTALLATION, AND OTHER MISCELLANEOUS WORK.$1.3M
Aug 15, 2017Department of the InteriorSER NORTH MABO (53000)INP17PX02530238140IGF::OT::IGF, CARL SANDBURG HOME NHS, STONEWORK ON PARK ENTRANCE SIGN&HEADWALL$15K
Aug 2, 2017Department of AgricultureSOUTHERN RESEARCH STATIONAG4568C170047237990IGF::OT::IGF STREAM-BANK STABILIZATION WORK AT A LOCATION ON THE SOUTH TOE RIVER, ON THE NFSNC APPALACHIAN RANGER DISTRICT.$25K
Jul 5, 2017Department of AgricultureSOUTHERN RESEARCH STATIONAG4568D170013237310IGF::OT::IGF SPRING GRADING TASK ORDE APP RD COR = SELIG$1K
May 10, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00019237310IGF::OT::IGF PROJECT: FTNP-BLRI 2A15 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 12 MILES OF THE BLUE RIDGE PARKWAY FROM MILEPOST (MP) 217.17 TO MP 229.68, INCLUDING THE EXIT/ENTRANCE RAMPS TO N.C. ROUTE 18 AND U.S. ROUTE 21, AND THREE PARKING AREAS/OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL AND PARTIAL DEPTH PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT OVERLAY, BRIDGE JOINT CLEANING AND RESEALING, STONE MASONRY REPAIRS, DRAINAGE REPLACEMENTS, RIPRAP INSTALLATION, AND OTHER MISCELLANEOUS WORK.$3.3M
Apr 13, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00018237310IGF::CT::IGF PROJECT: NP BLRI 2F24 LC THIS PROJECT WILL PERFORM CLEANUP OF ALL DEBRIS AT MILEPOST 277.1 ON THE BLUE RIDGE PARKWAY. THE ROAD IS CURRENTLY CLOSED TO THE PUBLIC AND WILL REMAIN CLOSED DURING THE ENTIRE DURATION OF THE WORK. THE NATIONAL PARK SERVICE (NPS) WILL PROVIDE ACCESS TO THE SITE TO THE CONTRACTOR, AND NO TRAFFIC CONTROL WILL BE REQUIRED. TASK 1. THE CONTRACTOR IS TO REMOVE LOOSE MATERIAL ON THE SLOPE ABOVE THE SLIDE IN ORDER TO PRECLUDE ANY FURTHER MATERIAL FROM SLIDING ONTO THE ROADWAY AND DITCH BELOW. TASK 2. THE CONTRACTOR IS TO REMOVE ALL MATERIAL AND DEBRIS INTO MANAGEABLE SIZES AND LEGALLY DISPOSE OF OFF GOVERNMENT PROPERTY. TASK 3. AFTER REMOVAL IS COMPLETE, THE ROADWAY IS TO BE CLEANED AND MADE READY FOR OPENING TO TRAFFIC.$91K
Apr 12, 2017Department of Homeland SecurityBASE PORTSMOUTH(00027)HSCG2717PPCV465237990IGF::OT::IGF REPLACE FINGER PIER&PILINGS$11K
Mar 31, 2017Department of AgricultureSOUTHERN RESEARCH STATIONAG4568D170013237310IGF::OT::IGF SPRING GRADING TASK ORDE APP RD COR = SELIG$112K
Mar 10, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00014237310IGF::CT::IGF PROJECT: NP BLRI 2P20 LC THIS PROJECT WILL PERFORM CLEANUP OF ALL DEBRIS AT MILEPOST 365 ON THE BLUE RIDGE PARKWAY. THE ROAD IS CURRENTLY CLOSED TO THE PUBLIC AND WILL REMAIN CLOSED DURING THE ENTIRE DURATION OF THE WORK. THE NPS WILL PROVIDE THE CONTRACTOR ACCESS TO THE SITE, AND NO TRAFFIC CONTROL WILL BE REQUIRED. TASK 1: THE CONTRACTOR IS TO BREAK UP THE DEBRIS INTO MANAGEABLE SIZES AND LEGALLY DISPOSE OF OFF GOVERNMENT PROPERTY. TASK 2: AFTER REMOVAL IS COMPLETE, THE ROADWAY IS TO BE CLEANED AND CLEAR OF DEBRIS, AND THEN MADE READY FOR TRAFFIC.$24K
Mar 8, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00031237310IGF::OT::IGF PROJECT: FW-CHN 10(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 2.65 MILES OF THE BEACH ACCESS ROAD INCLUDING RECONSTRUCTION OF THE PULL-OFFS AND ADJACENT BIKE TRAIL, AND APPROXIMATELY 0.09 MILES OF THE WOODLAND TRAIL ACCESS ROAD, AS WELL AS THE ASSATEAGUE LIGHTHOUSE AND WOODLAND TRAIL PARKING AREAS. THE WORK INCLUDES EARTHWORK, AGGREGATE BASE, ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, ASPHALT PAVEMENT WIDENING, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, CONCRETE CURB, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$86K
Feb 21, 2017Department of Homeland SecurityBASE PORTSMOUTH(00027)HSCG2717PPCV465237990IGF::OT::IGF REPLACE FINGER PIER&PILINGS$22K
Jan 26, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00004237310IGF::OT::IGF PROJECT FW-GRDI 105(1)$604K
Jan 17, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00031237310IGF::OT::IGF PROJECT: FW-CHN 10(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 2.65 MILES OF THE BEACH ACCESS ROAD INCLUDING RECONSTRUCTION OF THE PULL-OFFS AND ADJACENT BIKE TRAIL, AND APPROXIMATELY 0.09 MILES OF THE WOODLAND TRAIL ACCESS ROAD, AS WELL AS THE ASSATEAGUE LIGHTHOUSE AND WOODLAND TRAIL PARKING AREAS. THE WORK INCLUDES EARTHWORK, AGGREGATE BASE, ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, ASPHALT PAVEMENT WIDENING, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, CONCRETE CURB, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$51K
Aug 30, 2016Department of Veterans AffairsNATIONAL CEMETERY ADMIN (36C786)VA78616P0830237110IGF::CT::IGF PERFORM REPAIRS TO THE EXISTING STORM DRAIN LINE AT BEAUFORT NATIONAL CEMETERY$3K

Get Alerted Before Bryant's Land And Development Industries, INC.'s Next Recompete