Federal Contractor Profile
Bryant's Land And Development Industries, INC.
$145M obligated·75 awards·6 agencies·6 NAICS
Federal Contracts
Showing award actions 51–100 of 114 funded award actions, most recent first.
- Contracts with positive obligations
- 75
- Funded award actions shown
- 114
- Obligations shown
- $145M
- Awarding agencies
- 6
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of November 4, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jan 13, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F000016 | 237310 | PROJECT NP-GRSM 17(1): THE PROJECT CONSISTS OF RESURFACING CLINGMANS DOME ACCESS ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, REMOVAL OF EXISTING PAVEMENT | $2.7M |
| Nov 4, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F000003 | 237310 | PROJECT TN ERFO NP GRSM 2020-1(1): THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON TOWNSEND ENTRANCE ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REMOVING A PAVED PULL-OFF, CONSTRUCTING A ROCKERY, PLACING AND GROUTING RI | $623K |
| Aug 10, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000092 | 237310 | PROJECT NP SER PMS FY20(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN THE ANDREW JOHNSON NATIONAL HISTORIC SITE. THE WORK INCLUDES MICRO SURFACING AND OTHER MISCELLANEOUS WORK. | $348K |
| Aug 4, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000004 | 237310 | NP-GRSM (10N(1) AND 10N(2) THE PROJECT CONSISTS OF REHABILITATING APPROXIMATELY 2.44 MILES OF NEWFOUND GAP ROAD FROM MP 12.32 TO MP 14.76 AND RESURFACING APPROXIMATELY 6.18 MILES OF NEWFOUND GAP ROAD FROM MP 6.14 TO MP 12.32, INCLUDING PARKING AREAS | $70K |
| Jul 26, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000003 | 237310 | PROJECT NP-BLRI 2J17 THE PROJECT INCLUDES INSTALLING A DRAINAGE SYSTEM, REPLACEMENT OF ASPHALT CONCRETE PAVEMENT, INSTALLATION OF LIGHTWEIGHT CONCRETE SLAB, REPLACING BRIDGE SIDEWALK, REPLACING AND RESETTING BRIDGE CURB, REPLACING STONE MASONRY AT P | $31K |
| Jun 30, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000018 | 237310 | PROJECT NP-FOOT PMS(2) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT CONCRETE PAVEMENT AND CHIP SEAL), CRACK SEALING, FILLING, AND SEALING, ASPHALT PAVEMENT PATCHING, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK ON THE FOOTHI | $4.8M |
| May 24, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000068 | 237310 | PROJECT NP-GRSM 26(2),137(1) THE PROJECT CONSISTS OF RESURFACING CADES COVE LOOP ROAD AND CADES COVE CAMPGROUND ENTRANCE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT | $2.2M |
| Feb 24, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000018 | 237310 | PROJECT NP BISO 10(2): THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 7.6 MILES OF THE LEATHERWOOD FORD ROAD, INCLUDING THE RESURFACING OF THE BANDY CREEK BRIDGE AND CUMBERLAND RIVER BRIDGE. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FUL | $683K |
| Feb 24, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000003 | 237310 | PROJECT NP-BLRI 2J17 THE PROJECT INCLUDES INSTALLING A DRAINAGE SYSTEM, REPLACEMENT OF ASPHALT CONCRETE PAVEMENT, INSTALLATION OF LIGHTWEIGHT CONCRETE SLAB, REPLACING BRIDGE SIDEWALK, REPLACING AND RESETTING BRIDGE CURB, REPLACING STONE MASONRY AT P | $121K |
| Dec 15, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000004 | 237310 | NP-GRSM (10N(1) AND 10N(2) THE PROJECT CONSISTS OF REHABILITATING APPROXIMATELY 2.44 MILES OF NEWFOUND GAP ROAD FROM MP 12.32 TO MP 14.76 AND RESURFACING APPROXIMATELY 6.18 MILES OF NEWFOUND GAP ROAD FROM MP 6.14 TO MP 12.32, INCLUDING PARKING AREAS | $8.5M |
| Dec 11, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000003 | 237310 | PROJECT NP-BLRI 2J17 THE PROJECT INCLUDES INSTALLING A DRAINAGE SYSTEM, REPLACEMENT OF ASPHALT CONCRETE PAVEMENT, INSTALLATION OF LIGHTWEIGHT CONCRETE SLAB, REPLACING BRIDGE SIDEWALK, REPLACING AND RESETTING BRIDGE CURB, REPLACING STONE MASONRY AT P | $2.2M |
| Jul 28, 2020 | Department of the InteriorSER NORTH MABO (53000) | 140P5320C0034 | 237310 | BLUE RIDGE PARKWAY INSTALL&REPLACE GUARDRAIL SECTIONS | $74K |
| Jun 30, 2020 | Department of the InteriorSER NORTH MABO (53000) | 140P5320C0024 | 237310 | BLUE RIDGE PARKWAY, GILLESPIE GAP, ROAD REPAIRS | $52K |
| May 28, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000018 | 237310 | PROJECT NP BISO 10(2): THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 7.6 MILES OF THE LEATHERWOOD FORD ROAD, INCLUDING THE RESURFACING OF THE BANDY CREEK BRIDGE AND CUMBERLAND RIVER BRIDGE. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FUL | $92K |
| May 28, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000018 | 237310 | PROJECT NP BISO 10(2): THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 7.6 MILES OF THE LEATHERWOOD FORD ROAD, INCLUDING THE RESURFACING OF THE BANDY CREEK BRIDGE AND CUMBERLAND RIVER BRIDGE. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FUL | $7.6M |
| Apr 21, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000008 | 237310 | PROJECT NP SER PMS FY18(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN CAPE HATTERAS NATIONAL SEASHORE, FORT RALEIGH NATIONAL HISTORIC SITE, AND WRIGHT BROTHERS NATIONAL MEMORIAL. THE WORK INCLUDES THIN ASPHALT PAVEMENT OVERLAY, CHIP SEAL, MICRO SURFACING, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKING INSTALLATION, AND OTHER MISCELLANEOUS WORK. | $23K |
| Apr 8, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000030 | 237310 | PROJECT GRSM 15(1) THE PROJECT CONSISTS OF REPAIRING THE BOTE MOUNTAIN TUNNEL AND MILLING AND OVERLAY OF APPROXIMATELY 0.15-MILE OF LAUREL CREEK ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REPAIR TO THE CONCRETE LINING, R | $32K |
| Apr 7, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000032 | 237310 | BLRI 2H14 | $5K |
| Mar 25, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000051 | 237310 | PROJECT: NP-NACE 17(2), 18(2), 19(2), 118(1), 206(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF FORT DUPONT DRIVE, FORT DAVIS DRIVE, RIDGE PICNIC AREA, RIDGE PICNIC AREA LOOP, AND THE RECONSTRUCTION OF LANHAM ESTATES LOOP ROAD. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADWAY EXCAVATION, SEPARATION-STABILIZATION GEOTEXTILE INSTALLATION, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAVEMENT PATCHING, ASPHALT PAVEMENT OVERLAY, DRAINAGE IMPROVEMENTS AND REPLACEMENTS, INSTALLATION OF PERMANENT STORMWATER MANAGEMENT BMPS, LANDSCAPING AND OTHER MISCELLANEOUS WORK. | $135K |
| Sep 3, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000030 | 237310 | PROJECT GRSM 15(1) THE PROJECT CONSISTS OF REPAIRING THE BOTE MOUNTAIN TUNNEL AND MILLING AND OVERLAY OF APPROXIMATELY 0.15-MILE OF LAUREL CREEK ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REPAIR TO THE CONCRETE LINING, R | $951K |
| Jun 27, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000008 | 237310 | PROJECT NP SER PMS FY18(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN CAPE HATTERAS NATIONAL SEASHORE, FORT RALEIGH NATIONAL HISTORIC SITE, AND WRIGHT BROTHERS NATIONAL MEMORIAL. THE WORK INCLUDES THIN ASPHALT PAVEMENT OVERLAY, CHIP SEAL, MICRO SURFACING, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKING INSTALLATION, AND OTHER MISCELLANEOUS WORK. | $800K |
| May 15, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000046 | 237310 | PROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK. | $0 |
| Mar 14, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000008 | 237310 | PROJECT NP SER PMS FY18(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN CAPE HATTERAS NATIONAL SEASHORE, FORT RALEIGH NATIONAL HISTORIC SITE, AND WRIGHT BROTHERS NATIONAL MEMORIAL. THE WORK INCLUDES THIN ASPHALT PAVEMENT OVERLAY, CHIP SEAL, MICRO SURFACING, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKING INSTALLATION, AND OTHER MISCELLANEOUS WORK. | $6.9M |
| Nov 27, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000046 | 237310 | PROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK. | $1.0M |
| Sep 6, 2018 | Department of the InteriorFWS SOUTHEAST REGIONAL OFFICE | 140F0418P0326 | 237310 | IGF::OT::IGF ROUTE#300 SAVANNAH PAVING PROJ | $147K |
| Aug 30, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000051 | 237310 | PROJECT: NP-NACE 17(2), 18(2), 19(2), 118(1), 206(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF FORT DUPONT DRIVE, FORT DAVIS DRIVE, RIDGE PICNIC AREA, RIDGE PICNIC AREA LOOP, AND THE RECONSTRUCTION OF LANHAM ESTATES LOOP ROAD. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADWAY EXCAVATION, SEPARATION-STABILIZATION GEOTEXTILE INSTALLATION, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAVEMENT PATCHING, ASPHALT PAVEMENT OVERLAY, DRAINAGE IMPROVEMENTS AND REPLACEMENTS, INSTALLATION OF PERMANENT STORMWATER MANAGEMENT BMPS, LANDSCAPING AND OTHER MISCELLANEOUS WORK. | $3.2M |
| Aug 1, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000046 | 237310 | PROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK. | $45K |
| Jul 3, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000046 | 237310 | PROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK. | $2.8M |
| May 29, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000033 | 237310 | IGF::OT::IGF PROJECT NO. NP - GRSM 15(2), 16(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 7.7 MILES OF LAUREL CREEK ROAD, 0.8 MILES OF TOWNSEND ENTRANCE ROAD, AND 2.0 MILES OF TREMONT ROAD, INCLUDING NUMEROUS PARKING AREAS AND PULL-OFFS, ALL WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, TRAFFIC DETECTOR LOOP AND PERMANENT SIGN REPLACEMENT, AND OTHER MISCELLANEOUS WORK. | $35K |
| Apr 26, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000032 | 237310 | BLRI 2H14 | $341K |
| Apr 16, 2018 | Department of DefenseW7NS USPFO ACTIVITY NC ARNG | W9124218C5000 | 237310 | IGF::OT::IGF CONSTRUCT CONNECTOR ROAD | $372K |
| Feb 22, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000033 | 237310 | IGF::OT::IGF PROJECT NO. NP - GRSM 15(2), 16(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 7.7 MILES OF LAUREL CREEK ROAD, 0.8 MILES OF TOWNSEND ENTRANCE ROAD, AND 2.0 MILES OF TREMONT ROAD, INCLUDING NUMEROUS PARKING AREAS AND PULL-OFFS, ALL WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, TRAFFIC DETECTOR LOOP AND PERMANENT SIGN REPLACEMENT, AND OTHER MISCELLANEOUS WORK. | $2.5M |
| Feb 9, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000032 | 237310 | BLRI 2H14 | $1.9M |
| Oct 13, 2017 | Department of AgricultureSOUTHERN RESEARCH STATION | AG4568P170008 | 561730 | IGF::OT::IGF CLEARING OF STORM DEBRIS FROM ROADS AND SITES COR - DREW SELIG 828-257-4209 | $5K |
| Sep 27, 2017 | Department of AgricultureSOUTHERN RESEARCH STATION | AG4568P170008 | 561730 | IGF::OT::IGF CLEARING OF STORM DEBRIS FROM ROADS AND SITES COR - DREW SELIG 828-257-4209 | $13K |
| Sep 5, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00004 | 237310 | IGF::OT::IGF PROJECT FW-GRDI 105(1) | $61K |
| Aug 17, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00019 | 237310 | IGF::OT::IGF PROJECT: FTNP-BLRI 2A15 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 12 MILES OF THE BLUE RIDGE PARKWAY FROM MILEPOST (MP) 217.17 TO MP 229.68, INCLUDING THE EXIT/ENTRANCE RAMPS TO N.C. ROUTE 18 AND U.S. ROUTE 21, AND THREE PARKING AREAS/OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL AND PARTIAL DEPTH PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT OVERLAY, BRIDGE JOINT CLEANING AND RESEALING, STONE MASONRY REPAIRS, DRAINAGE REPLACEMENTS, RIPRAP INSTALLATION, AND OTHER MISCELLANEOUS WORK. | $1.3M |
| Aug 15, 2017 | Department of the InteriorSER NORTH MABO (53000) | INP17PX02530 | 238140 | IGF::OT::IGF, CARL SANDBURG HOME NHS, STONEWORK ON PARK ENTRANCE SIGN&HEADWALL | $15K |
| Aug 2, 2017 | Department of AgricultureSOUTHERN RESEARCH STATION | AG4568C170047 | 237990 | IGF::OT::IGF STREAM-BANK STABILIZATION WORK AT A LOCATION ON THE SOUTH TOE RIVER, ON THE NFSNC APPALACHIAN RANGER DISTRICT. | $25K |
| Jul 5, 2017 | Department of AgricultureSOUTHERN RESEARCH STATION | AG4568D170013 | 237310 | IGF::OT::IGF SPRING GRADING TASK ORDE APP RD COR = SELIG | $1K |
| May 10, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00019 | 237310 | IGF::OT::IGF PROJECT: FTNP-BLRI 2A15 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 12 MILES OF THE BLUE RIDGE PARKWAY FROM MILEPOST (MP) 217.17 TO MP 229.68, INCLUDING THE EXIT/ENTRANCE RAMPS TO N.C. ROUTE 18 AND U.S. ROUTE 21, AND THREE PARKING AREAS/OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL AND PARTIAL DEPTH PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT OVERLAY, BRIDGE JOINT CLEANING AND RESEALING, STONE MASONRY REPAIRS, DRAINAGE REPLACEMENTS, RIPRAP INSTALLATION, AND OTHER MISCELLANEOUS WORK. | $3.3M |
| Apr 13, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00018 | 237310 | IGF::CT::IGF PROJECT: NP BLRI 2F24 LC THIS PROJECT WILL PERFORM CLEANUP OF ALL DEBRIS AT MILEPOST 277.1 ON THE BLUE RIDGE PARKWAY. THE ROAD IS CURRENTLY CLOSED TO THE PUBLIC AND WILL REMAIN CLOSED DURING THE ENTIRE DURATION OF THE WORK. THE NATIONAL PARK SERVICE (NPS) WILL PROVIDE ACCESS TO THE SITE TO THE CONTRACTOR, AND NO TRAFFIC CONTROL WILL BE REQUIRED. TASK 1. THE CONTRACTOR IS TO REMOVE LOOSE MATERIAL ON THE SLOPE ABOVE THE SLIDE IN ORDER TO PRECLUDE ANY FURTHER MATERIAL FROM SLIDING ONTO THE ROADWAY AND DITCH BELOW. TASK 2. THE CONTRACTOR IS TO REMOVE ALL MATERIAL AND DEBRIS INTO MANAGEABLE SIZES AND LEGALLY DISPOSE OF OFF GOVERNMENT PROPERTY. TASK 3. AFTER REMOVAL IS COMPLETE, THE ROADWAY IS TO BE CLEANED AND MADE READY FOR OPENING TO TRAFFIC. | $91K |
| Apr 12, 2017 | Department of Homeland SecurityBASE PORTSMOUTH(00027) | HSCG2717PPCV465 | 237990 | IGF::OT::IGF REPLACE FINGER PIER&PILINGS | $11K |
| Mar 31, 2017 | Department of AgricultureSOUTHERN RESEARCH STATION | AG4568D170013 | 237310 | IGF::OT::IGF SPRING GRADING TASK ORDE APP RD COR = SELIG | $112K |
| Mar 10, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00014 | 237310 | IGF::CT::IGF PROJECT: NP BLRI 2P20 LC THIS PROJECT WILL PERFORM CLEANUP OF ALL DEBRIS AT MILEPOST 365 ON THE BLUE RIDGE PARKWAY. THE ROAD IS CURRENTLY CLOSED TO THE PUBLIC AND WILL REMAIN CLOSED DURING THE ENTIRE DURATION OF THE WORK. THE NPS WILL PROVIDE THE CONTRACTOR ACCESS TO THE SITE, AND NO TRAFFIC CONTROL WILL BE REQUIRED. TASK 1: THE CONTRACTOR IS TO BREAK UP THE DEBRIS INTO MANAGEABLE SIZES AND LEGALLY DISPOSE OF OFF GOVERNMENT PROPERTY. TASK 2: AFTER REMOVAL IS COMPLETE, THE ROADWAY IS TO BE CLEANED AND CLEAR OF DEBRIS, AND THEN MADE READY FOR TRAFFIC. | $24K |
| Mar 8, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7116C00031 | 237310 | IGF::OT::IGF PROJECT: FW-CHN 10(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 2.65 MILES OF THE BEACH ACCESS ROAD INCLUDING RECONSTRUCTION OF THE PULL-OFFS AND ADJACENT BIKE TRAIL, AND APPROXIMATELY 0.09 MILES OF THE WOODLAND TRAIL ACCESS ROAD, AS WELL AS THE ASSATEAGUE LIGHTHOUSE AND WOODLAND TRAIL PARKING AREAS. THE WORK INCLUDES EARTHWORK, AGGREGATE BASE, ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, ASPHALT PAVEMENT WIDENING, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, CONCRETE CURB, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $86K |
| Feb 21, 2017 | Department of Homeland SecurityBASE PORTSMOUTH(00027) | HSCG2717PPCV465 | 237990 | IGF::OT::IGF REPLACE FINGER PIER&PILINGS | $22K |
| Jan 26, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00004 | 237310 | IGF::OT::IGF PROJECT FW-GRDI 105(1) | $604K |
| Jan 17, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7116C00031 | 237310 | IGF::OT::IGF PROJECT: FW-CHN 10(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 2.65 MILES OF THE BEACH ACCESS ROAD INCLUDING RECONSTRUCTION OF THE PULL-OFFS AND ADJACENT BIKE TRAIL, AND APPROXIMATELY 0.09 MILES OF THE WOODLAND TRAIL ACCESS ROAD, AS WELL AS THE ASSATEAGUE LIGHTHOUSE AND WOODLAND TRAIL PARKING AREAS. THE WORK INCLUDES EARTHWORK, AGGREGATE BASE, ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, ASPHALT PAVEMENT WIDENING, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, CONCRETE CURB, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $51K |
| Aug 30, 2016 | Department of Veterans AffairsNATIONAL CEMETERY ADMIN (36C786) | VA78616P0830 | 237110 | IGF::CT::IGF PERFORM REPAIRS TO THE EXISTING STORM DRAIN LINE AT BEAUFORT NATIONAL CEMETERY | $3K |
Get Alerted Before Bryant's Land And Development Industries, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free