Federal Contractor Profile
Dubuque Barge And Fleeting Service CO
$255M obligated·100 awards·3 agencies·8 NAICS
Federal Contracts
Showing contracts 101–150 of 171 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 28, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES17C0012 | 237990 | IGF::OT::IGF THE WORK INCLUDES, BUT IS NOT LIMITED TO ALL PLANT, LABOR, AND MATERIALS TO CONSTRUCT TWO ROCK SILLS AT LOW ER POOL 2 OF THE MISSISSIPPI RIVER, JUST UPSTREAM OF LOCK AND DAM 2 AND HASTINGS, MINNESOTA, ONE ON THE RIGHT DESCENDING BANK FROM RIVER MILE 819.5 TO 819.8 AND ONE ON THE LEFT DESCENDING BANK FROM RIVER MILE 818.4 TO 818.9. THE STRUCTURES W OULD BE BUILT OF RIPRAP WITH A TOP WIDTH OF APPROXIMATELY 10 FEET. FOUR FOOT DIAMETER BOULDERS WILL BE SPACED OUT ALONG THE TOP OF THE STRUCTURE TO PROVIDE VISIBILITY. | $12K |
| Aug 23, 2019 | Department of DefenseW071 ENDIST OMAHA | W9128F19F0107 | 237990 | LEVEE 575B AT RM 554 EMERGENCY REPAIR | $1.8M |
| Aug 7, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19P0085 | 237990 | UPPER LANSING MECHANICAL DREDGING | $169K |
| Jul 22, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19C0006 | 237990 | DREDGING SERVICES | $221K |
| Jul 3, 2019 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK19P0086 | 488390 | MV BEETENDORF DRYDOCKING | $28K |
| Jul 3, 2019 | Department of DefenseW071 ENDIST OMAHA | W9128F19F0107 | 237990 | LEVEE 575B AT RM 554 EMERGENCY REPAIR | $3.6M |
| Jun 27, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19C0005 | 237990 | DREDGING | $556K |
| Jun 27, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19F0039 | 237990 | DREDGING | $105K |
| Jun 20, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19F0037 | 237990 | DREDGING | $122K |
| Jun 11, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19F0031 | 237990 | DREDGING | $120K |
| Jun 3, 2019 | Department of DefenseW071 ENDIST OMAHA | W9128F19F0107 | 237990 | LEVEE 575B AT RM 554 EMERGENCY REPAIR | $1.1M |
| May 31, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19F0027 | 237990 | DREDGING | $163K |
| May 14, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19F0026 | 237990 | DREDGING | $163K |
| May 14, 2019 | Department of DefenseW071 ENDIST OMAHA | W9128F19C0024 | 237990 | L601 LEVEE REPAIR NEAR BARTLETT, EMERGENCY FLOOD | $8.5M |
| May 7, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19F0024 | 237990 | MOBILIZATION AND DEMOBILIZATION | $77K |
| Apr 30, 2019 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK19P0065 | 336611 | DRY DOCKING AND REPAIR OF THE MOTOR VESSEL ROCK ISLAND TO REMOVE ONE PROPELLER AND INSTALL A REPLACEMENT. | $17K |
| Apr 19, 2019 | Department of DefenseW071 ENDIST OMAHA | W9128F19F0107 | 237990 | LEVEE 575B AT RM 554 EMERGENCY REPAIR | $12M |
| Mar 29, 2019 | Department of DefenseW07V ENDIST ST PAUL | W912ES19P0035 | 562119 | LD2 DEBRIS MOVEMENT | $145K |
| Dec 27, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK19C0006 | 237990 | BEAVER ISLAND COMPLEX STAGE 1B | $10.0M |
| Nov 29, 2018 | Department of DefenseW07V ENDIST ST PAUL | W912ES19F0013 | 237990 | MOBILIZATION AND DEMOBILIZATION | $50K |
| Oct 31, 2018 | Department of DefenseW07V ENDIST ST PAUL | W912ES17C0012 | 237990 | IGF::OT::IGF THE WORK INCLUDES, BUT IS NOT LIMITED TO ALL PLANT, LABOR, AND MATERIALS TO CONSTRUCT TWO ROCK SILLS AT LOW ER POOL 2 OF THE MISSISSIPPI RIVER, JUST UPSTREAM OF LOCK AND DAM 2 AND HASTINGS, MINNESOTA, ONE ON THE RIGHT DESCENDING BANK FROM RIVER MILE 819.5 TO 819.8 AND ONE ON THE LEFT DESCENDING BANK FROM RIVER MILE 818.4 TO 818.9. THE STRUCTURES W OULD BE BUILT OF RIPRAP WITH A TOP WIDTH OF APPROXIMATELY 10 FEET. FOUR FOOT DIAMETER BOULDERS WILL BE SPACED OUT ALONG THE TOP OF THE STRUCTURE TO PROVIDE VISIBILITY. | $55K |
| Sep 27, 2018 | Department of DefenseW07V ENDIST ST PAUL | W912ES18F0084 | 237990 | UNLOADING OF TEMPORARY PLACEMENT SITES | $969K |
| Sep 26, 2018 | Department of DefenseW07V ENDIST ST PAUL | W912ES16C0008 | 237990 | IGF::OT::IGF REMOVE DREDGE MATERIAL (BASE) | $12K |
| Sep 24, 2018 | Department of DefenseW07V ENDIST ST PAUL | W912ES18C0010 | 237990 | IGF::OT::IGF CORPS ISLAND REMOVE DREDGE MATERIAL | $7.5M |
| Sep 11, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK15C0035 | 237990 | IGF::OT::IGF MISSISSIPPI RIVER BASIN; POOL 12- STONE, TIPPY AND SUNFISH LAKES; JO DAVIESS COUNTY; IL POOL 12 OVERWINTERING HREP; STAGE II. | $61K |
| Aug 21, 2018 | Department of DefenseW07V ENDIST ST PAUL | W912ES16C0008 | 237990 | IGF::OT::IGF REMOVE DREDGE MATERIAL (BASE) | $4K |
| Aug 3, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK15C0035 | 237990 | IGF::OT::IGF MISSISSIPPI RIVER BASIN; POOL 12- STONE, TIPPY AND SUNFISH LAKES; JO DAVIESS COUNTY; IL POOL 12 OVERWINTERING HREP; STAGE II. | $4K |
| Jul 18, 2018 | Department of DefenseW071 ENDIST OMAHA | W9128F18F0180 | 237990 | UNIT L-575 REHABILITATION, IGF::OT::IGF | $96K |
| Jul 16, 2018 | Department of DefenseW07V ENDIST ST PAUL | W912ES16C0008 | 237990 | IGF::OT::IGF REMOVE DREDGE MATERIAL (BASE) | $11K |
| Jul 13, 2018 | Department of DefenseW071 ENDIST OMAHA | 0010 | 237990 | IGF::OT::IGF NISHNABOTNA CHUTE BASE, MISSOURI RIVER, HAMBURG, IA | $13K |
| Jun 22, 2018 | Department of DefenseW07V ENDIST ST PAUL | W912ES16C0008 | 237990 | IGF::OT::IGF REMOVE DREDGE MATERIAL (BASE) | $12K |
| May 24, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK16C0034 | 237990 | IGF::OT::IGF MISSISSIPPI RIVER BASIN; POOL 12 OVERWINTERING STAGE III | $42K |
| Apr 12, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK15C0035 | 237990 | IGF::OT::IGF MISSISSIPPI RIVER BASIN; POOL 12- STONE, TIPPY AND SUNFISH LAKES; JO DAVIESS COUNTY; IL POOL 12 OVERWINTERING HREP; STAGE II. | $38K |
| Apr 4, 2018 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ18F1005 | 237990 | MINIMUM GAURANTEE | $3K |
| Apr 3, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK15C0035 | 237990 | IGF::OT::IGF MISSISSIPPI RIVER BASIN; POOL 12- STONE, TIPPY AND SUNFISH LAKES; JO DAVIESS COUNTY; IL POOL 12 OVERWINTERING HREP; STAGE II. | $14K |
| Mar 23, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK17C0062 | 237990 | IGF::OT::IGF US ARMY CORPS OF ENGINEERS LOCK AND DAM 18 RELIEF WELL INSTALLATION AWARD OF BASE BID. | $3K |
| Feb 14, 2018 | Department of DefenseW071 ENDIST OMAHA | 0025 | 237990 | C - CENWO-PM-C - MISSOURI RIVER RECOVERY FISH AND WILDLIFE MITIGATION DEER ISLAND PROJECT PHASE 2, MISSOURI RIVER, IA. | $609K |
| Feb 14, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK17C0056 | 237990 | IGF::OT::IGF L/D 14 GUIDEWALL REPAIRS, PLEASANT VALLEY, IOWA. | $4K |
| Feb 2, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK17C0056 | 237990 | IGF::OT::IGF L/D 14 GUIDEWALL REPAIRS, PLEASANT VALLEY, IOWA. | $947 |
| Jan 19, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK17C0056 | 237990 | IGF::OT::IGF L/D 14 GUIDEWALL REPAIRS, PLEASANT VALLEY, IOWA. | $65K |
| Jan 16, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK17C0056 | 237990 | IGF::OT::IGF L/D 14 GUIDEWALL REPAIRS, PLEASANT VALLEY, IOWA. | $10K |
| Jan 9, 2018 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK17C0056 | 237990 | IGF::OT::IGF L/D 14 GUIDEWALL REPAIRS, PLEASANT VALLEY, IOWA. | $36K |
| Dec 4, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | 0005 | 237990 | IGF::OT::IGF ROCK PLACEMENT | $6K |
| Sep 27, 2017 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK15C0035 | 237990 | IGF::OT::IGF MISSISSIPPI RIVER BASIN; POOL 12- STONE, TIPPY AND SUNFISH LAKES; JO DAVIESS COUNTY; IL POOL 12 OVERWINTERING HREP; STAGE II. | $468K |
| Sep 26, 2017 | Department of DefenseW07V ENDIST ST PAUL | W912ES17C0012 | 237990 | IGF::OT::IGF THE WORK INCLUDES, BUT IS NOT LIMITED TO ALL PLANT, LABOR, AND MATERIALS TO CONSTRUCT TWO ROCK SILLS AT LOW ER POOL 2 OF THE MISSISSIPPI RIVER, JUST UPSTREAM OF LOCK AND DAM 2 AND HASTINGS, MINNESOTA, ONE ON THE RIGHT DESCENDING BANK FROM RIVER MILE 819.5 TO 819.8 AND ONE ON THE LEFT DESCENDING BANK FROM RIVER MILE 818.4 TO 818.9. THE STRUCTURES W OULD BE BUILT OF RIPRAP WITH A TOP WIDTH OF APPROXIMATELY 10 FEET. FOUR FOOT DIAMETER BOULDERS WILL BE SPACED OUT ALONG THE TOP OF THE STRUCTURE TO PROVIDE VISIBILITY. | $3.7M |
| Sep 5, 2017 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK17C0062 | 237990 | IGF::OT::IGF US ARMY CORPS OF ENGINEERS LOCK AND DAM 18 RELIEF WELL INSTALLATION AWARD OF BASE BID. | $3.1M |
| Aug 29, 2017 | Department of DefenseW07V ENDIST ST PAUL | W912ES16C0008 | 237990 | IGF::OT::IGF REMOVE DREDGE MATERIAL (BASE) | $1.4M |
| Aug 17, 2017 | Department of DefenseW07V ENDIST ST PAUL | W912ES17C0005 | 238990 | IGF::OT::IGF GUIDEWALL CRIB REPAIRS AT LOCK&DAM 8 AND 9 | $3.5M |
| Jul 26, 2017 | Department of DefenseW07V ENDIST ROCK ISLAND | W912EK17C0056 | 237990 | IGF::OT::IGF L/D 14 GUIDEWALL REPAIRS, PLEASANT VALLEY, IOWA. | $1.1M |
| Jun 27, 2017 | Department of DefenseW07V ENDIST ROCK ISLAND | 0002 | 488390 | IGF::OT::IGF MV BETTENDORF DRY DOCKING AND INSPECTION FOR MISSISSIPPI RIVER PROJECT OFFICE, PLEASANT VALLEY, SCOTT COUNTY, IOWA | $133K |
Get Alerted Before Dubuque Barge And Fleeting Service CO's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free