Federal Contractor Profile
Engineering And Software System Solutions, INC.
$197M obligated·224 awards·4 agencies·13 NAICS
Federal Contracts
Showing contracts 151–200 of 267 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 6, 2020 | Department of DefenseFA8649 USAF SBIR STTR CNTRCTNG AFRL | FA864920P0770 | 541715 | SIBR PHASE I, FX201-CSO1-0073 FIGHTER AIRCRAFT ARE ROUTINELY MOVED ON THE TARMAC WITH THE USE OF THE MD-1 UNIVERSAL TOW BAR. A SOLUTION TO THIS TOWING PROBLEM IS THROUGH DESIGN AND DEVELOPMENT OF A SELF-COMPENSATING SHOCK ABSORBER SYSTEM. | $50K |
| Feb 13, 2020 | Department of DefenseDLA LAND AND MARITIME | SPE7L120F207W | 541330 | 8507175925!MISCELLANEOUS | $46K |
| Feb 12, 2020 | Department of DefenseFA8571 MAINT CONTRACTING AFSC PZIM | FA857120F0028 | 541715 | ZINC NICKLE PLATING REQUIREMENT | $200K |
| Feb 12, 2020 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0036 | 541715 | RESEARCH AND DEVELOPMENT | $512K |
| Jan 15, 2020 | Department of DefenseFA8222 AFSC OL H PZIE | FA822217C5005 | 541712 | IGF::OT::IGF SBIR PHASE III CD ELIMINATION/IMPLEMENTATION OF LHE ZN-NI | $3.8M |
| Nov 12, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833520C0191 | 541715 | FINAL REPORT ON GRINDING PARAMETERS R&D | $2.2M |
| Nov 12, 2019 | Department of DefenseDCSO PHILADELPHIA | SP470120P0014 | 541715 | IGF OT IGF SERVICES BASIC RESEARCH PO 8506959653 | $100K |
| Nov 7, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822220P0001 | 541715 | SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE I; DETERMINATION OF SIGNIFICANT FAILURE SIZE FOR FINITE ELEMENT ANALYSIS (FEA) TOPIC NUMBER AF192-062. | $150K |
| Oct 24, 2019 | Department of DefenseFA8100 AFSC PZIEC | FA810020C0004 | 541715 | SMALL BUSINESS INNOVATION RESEARCH (SBIR), PHASE II ADDED WORK, AF151-166, THERMAL SPRAY DASHBOARD/KNOWLEDGE MANAGEMENT SYSTEM | $1.7M |
| Oct 21, 2019 | Department of DefenseFA8203 AFSC PZAAB | FA820318C0004 | 541330 | IGF::OT::IGF, F-15E NOSE WHEEL REDESIGN | $1.5M |
| Sep 27, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219C5002 | 541715 | SBIR PHASE III TOPIC AF073-115. RELIABILITY, AVAILABILTY, MAINTAINABILITY (RAM) IMPLEMENTAION PROJECT. RESTORATION OF DIMENSIONAL SURFACES (RODS). | $1.8M |
| Sep 24, 2019 | Department of DefenseFA8203 AFSC PZAAB | FA820319F0127 | 541330 | ENGINEERING SERVICES FOR THE LANDING GEAR EMERGENCY RESPONSE TO ACCOMPLISH TASKS NECESSARY TO INVESTIGATE THE F-16 MISHAP BRAKE CONTROL VALVE. | $59K |
| Sep 24, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219C0027 | 541990 | SBIR PHASE II R D PROJECT, SBIR TOPIC NUMBER AF181-010 TITLED QUICK AND RELIABLE HYDROGEN EMBRITTLEMENT TESTING. | $750K |
| Sep 20, 2019 | Department of DefenseFA8203 AFSC PZAAB | FA820319C0007 | 541330 | FOLLOW-ON INDEFINITE DELIVERY INDEFINITE QUANTITY LANDING GEAR ENGINEERING SERVICES A AS CONTRACT. | $390K |
| Sep 19, 2019 | Department of DefenseFA8571 MAINT CONTRACTING AFSC PZIM | FA850118P0055 | 541990 | COLD SPRAY REPAIR DIMENSIONAL RESTORATION PHASE II SMALL BUSINESS INNOVATIVE RESEARCH | $2.0M |
| Sep 11, 2019 | Department of DefenseFA8203 AFSC PZAAB | FA820318C0004 | 541330 | IGF::OT::IGF, F-15E NOSE WHEEL REDESIGN | $4.2M |
| Aug 14, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219C0022 | 541715 | SBIR PHASE 2.5 - DIPSOL OF AMERICA IZ-C17+ LHE ZNNI AND SIFCO PERFORMANCE CHARACTERISTIC TESTING. | $5.2M |
| Aug 13, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822217C5005 | 541712 | IGF::OT::IGF SBIR PHASE III CD ELIMINATION/IMPLEMENTATION OF LHE ZN-NI | $1.7M |
| Aug 1, 2019 | Department of DefenseW2R2 USA ENGR R & D CTR | W912HZ19C0021 | 541715 | IGF::OT::IGF SBIR PHASE II ENHANCEMENT LATTICE DISCRETE PARTICLE MODEL (LDPM) MODELING OF CONCRETE FAILURE UNDER BLAST AND FRAGMENT LOADING U438240 | $50K |
| Jul 30, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219C0026 | 541420 | SBIR PHASE II FOLLOW ON. DEVELOPMENT OF PULSE WATER STRIP OF TUNGSTEN CARBIDE HVOF COATINGS AND CHROME PLATING ON LANDING GEAR COMPONENTS. | $4.3M |
| Jun 6, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219C0020 | 541715 | SBIR PHASE 2.5 - DIPSOL OF AMERICA IZ-C17+ LHE ZNNI AND SIFCO PERFORMANCE CHARACTERISTIC TESTING. | $2.5M |
| May 31, 2019 | Department of DefenseW2R2 USA ENGR R & D CTR | W912HZ19C0021 | 541715 | IGF::OT::IGF SBIR PHASE II ENHANCEMENT LATTICE DISCRETE PARTICLE MODEL (LDPM) MODELING OF CONCRETE FAILURE UNDER BLAST AND FRAGMENT LOADING U438240 | $600K |
| Apr 3, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219C0016 | 541715 | SBIR PHASE II AF171-006 DEVELOPMENT OF ADDITIVE MANUFACTURING FOR LANDING GEAR COMPONENTS | $750K |
| Mar 14, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0036 | 541715 | RESEARCH AND DEVELOPMENT | $284K |
| Mar 4, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219C0014 | 541715 | SBIR PHASE II - ALTERNATIVE METHOD OF SURFACE ACTIVATION OF HIGH STRENGTH STEELS FOR ELECTROPLATING | $750K |
| Mar 1, 2019 | Department of DefenseFA8571 MAINT CONTRACTING AFSC PZIM | FA857119CA004 | 541715 | SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE II | $3.0M |
| Mar 1, 2019 | Department of DefenseFA8571 MAINT CONTRACTING AFSC PZIM | FA857119CA007 | 541715 | SMALL BUSINESS INNOVATIVE RESEARCH (SBIR) PROGRAM PHASE II | $750K |
| Jan 15, 2019 | Department of DefenseFA8222 AFSC OL H PZIE | FA822217C5005 | 541712 | IGF::OT::IGF SBIR PHASE III CD ELIMINATION/IMPLEMENTATION OF LHE ZN-NI | $3.7M |
| Jan 8, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833516C0037 | 541712 | RESEARCH&DEVELOPMENT "IGF::OT::IGF" | $758K |
| Jan 8, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0036 | 541715 | RESEARCH AND DEVELOPMENT | $300K |
| Jan 8, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0201 | 541715 | RESEARCH AND DEVELOPMENT, SBIR PHASE II.5, IGF::OT::IGF | $405K |
| Nov 29, 2018 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219P0003 | 541715 | "NON-DESTRUCTIVE TESTING FOR LANDING GEAR APPLICATIONS" PHASE I TOPIC #AF182-014. | $150K |
| Nov 21, 2018 | Department of DefenseFA8222 AFSC OL H PZIE | FA822219C0001 | 541715 | THIS IS PHASE III SBIR EFFORT: RESTORATION OF DIMENSIONAL SURFACES (RODS) VIA MAGNETRON SPUTTERING SYSTEM (MSS) FOR B-52 CYLINDER. | $168K |
| Nov 15, 2018 | Department of DefenseDCSO PHILADELPHIA | SP470118P0075 | 541611 | IGF::OT::IGF!8504681462!SERVICES - BASIC | $25K |
| Oct 1, 2018 | Department of DefenseFA8201 AFSC OL H PZIO | FA820119FG025 | 541330 | MISCELLANEOUS AIRCRAFT COMPONENTS AND ACCESSORIES | $19K |
| Sep 21, 2018 | Department of DefenseFA8501 OPL CONTRACTING AFSC/PZIO | FA850118P0055 | 541990 | COLD SPRAY REPAIR DIMENSIONAL RESTORATION PHASE II SMALL BUSINESS INNOVATIVE RESEARCH | $250K |
| Sep 6, 2018 | Department of DefenseW2R2 USA ENGR R & D CTR | W912HZ17C0027 | 541712 | IGF::OT::IGF RESEARCH SERVICES - LATTICE DISCRETE MODELING FOR THE ERDC U438120 | $203K |
| Aug 27, 2018 | Department of DefenseW2R2 USA ENGR R & D CTR | W912HZ17C0028 | 541712 | IGF::OT::IGF SBIR PHASE II RESEARCH SERVICES FOR THE ARMY CORPS OF ENGINEERS U438120 | $490K |
| Aug 21, 2018 | Department of DefenseDCSO PHILADELPHIA | SP470118C0055 | 561790 | IGF::OT::IGF!8504775271!SERVICES - BASIC | $750K |
| Jul 26, 2018 | Department of JusticeHEADQUATERS | 15DDHQ18F00000814 | 541330 | DOURON/EVOLVE FURNITURE GROUP - SAOS, PRIORITY CHAIRS FOR ADMINISTRATOR'S CONFERENCE ROOM, 12TH FLOOR. SHIPPING INCLUDED. | $8K |
| Jul 16, 2018 | Department of DefenseFA8203 AFSC PZAAB | FA820318C0004 | 541330 | IGF::OT::IGF, F-15E NOSE WHEEL REDESIGN | $1.1M |
| Jul 9, 2018 | Department of DefenseFA8203 AFSC PZAAB | FA820316F0109 | 541330 | IGF::OT::IGF - THIS GSA ORDER PROCURES ONE BASE YEAR AND TWO OPTION YEARS FOR ADVISORY AND ASSISTANCE SERVICES IN SUPPORT OF THE 417TH SUPPLY CHAIN MANAGEMENT ENGINEERING GROUP, ENGINEERING SERVICES, NON-PERSONAL. | $371K |
| Jul 9, 2018 | Department of DefenseFA8222 AFSC OL H PZIE | FA822218P0021 | 541715 | SMALL BUSINESS INNOVATIVE RESEARCH VIA QUICK AND RELIABLE HYDROGEN EMBRITTLEMENT TESTING | $149K |
| Jun 27, 2018 | Department of DefenseFA8203 AFSC PZAAB | FA820317F0013 | 541330 | IGF::OT::IGF ENGINEERING SERVICES FOR THE C-130 WHEEL AND BRAKE THERMAL REDESIGN. | $1.3M |
| Jun 4, 2018 | Department of DefenseFA8222 AFSC OL H PZIE | FA822218C0009 | 541715 | IGF::OT::IGF DEVELOPMENT OF CAD PLATING REPLACEMENT WITH ZINC NICKEL ON HIGH STRENGTH STEEL COMPONENTS | $2.5M |
| May 21, 2018 | Department of DefenseFA8203 AFSC PZAAB | 0009 | 541330 | IGF::OT::IGF ENGINEERING SERVICES IN SUPPORT OF THE F-15 WBSI SAFETY OF FLIGHT PROGRAM. | $221K |
| May 16, 2018 | Department of DefenseDCSO PHILADELPHIA | SP470118P0075 | 541611 | IGF::OT::IGF!8504681462!SERVICES - BASIC | $100K |
| May 15, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0201 | 541715 | RESEARCH AND DEVELOPMENT, SBIR PHASE II.5, IGF::OT::IGF | $615K |
| May 1, 2018 | Department of DefenseFA8501 OPL CONTRACTING AFSC/PZIO | FA850118C0010 | 541330 | R&D- DEFENSE SYSTEM: MISCELLANEOUS HARD GOODS (COMMERCIALIZED) | $749K |
| Apr 3, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0036 | 541715 | RESEARCH AND DEVELOPMENT | $400K |
Get Alerted Before Engineering And Software System Solutions, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free