Federal Contractor Profile
Ensco INC
$859M obligated·487 awards·8 agencies·17 NAICS
Federal Contracts
Showing award actions 101–150 of 839 funded award actions, most recent first.
- Contracts with positive obligations
- 487
- Funded award actions shown
- 839
- Obligations shown
- $859M
- Awarding agencies
- 8
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 27, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 26, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00074N | 541715 | THE OBJECTIVE OF THIS TASK IS TO WRITE A 5-YEAR STRATEGIC PLAN FOR THE FRA OFFICE OF RESEARCH, DEVELOPMENT, AND TECHNOLOGY COVERING THE YEARS 2025 THROUGH 2029. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT, AND OTHER MATERIALS NECESSARY TO C | $47K |
| Sep 25, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623F00029N | 541715 | UPGRADE TWO ACTIVE GRADE CROSSING SYSTEMS TO TRACK CIRCUIT-BASED CONSTANT WARNING TIME CONTROLLERS. ACQUISITION TITLE: TRANSPORTATION TECHNOLOGY CENTER ACTIVE GRADE CROSSING SYSTEM UPGRADE | $125K |
| Sep 24, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00072N | 541715 | PUEBLO CHEMICAL DEPOT TRACK INSPECTIONS AND MAINTENANCE OCT 2022 - SEP 2024 | $461K |
| Sep 24, 2024 | Department of DefenseWASHINGTON HEADQUARTERS SERVICES | HQ003423C0012 | 541511 | SENTRY COMMAND AND CONTROL, INTEGRATION AND SUSTAINMENT SERVICES | $170K |
| Sep 20, 2024 | Department of Homeland SecuritySECURITY TECHNOLOGY | 70T04023F7573N006 | 541715 | 70T04023F7573N006 UNDER FRA IDIQ NUMBER 693JJ621D000001 TO PROVIDE TESTING AND ASSESSMENT OF RAILCAR VULNERABILITY. | $104K |
| Sep 19, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00069N | 541715 | THE OBJECTIVE OF THIS TASK IS TO DEVELOP A DETAILED PLAN FOR USE IN DEVELOPING A WAYSIDE DETECTOR TEST BED (WDTB) THAT SHALL INCLUDE THE PROCUREMENT AND INSTALLATION OF VARIOUS WAYSIDE DETECTOR TECHNOLOGIES AT TTC. | $65K |
| Sep 19, 2024 | Department of Homeland SecurityMISSION ESSENTIALS | 70T05024F5900N011 | 541715 | SURFACE TRANSPORTATION SECURITY TRAINING, COURSE DEVELOPMENT, AND ADMINISTRATION | $2.3M |
| Sep 18, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00067N | 541715 | 1. SUPPORT ONGOING COLLECTION OF LIDAR POINT CLOUD SCANS AT GRADE CROSSING THROUGH PARTNERSHIP WITH THE FRA OFFICE OF SAFETY AUTOMATED TRACK INSPECTION PROGRAM (ATIP). 2. SUPPORT EFFORTS OF FRA INFORMATION TECHNOLOGY (IT) TO ESTABLISH A CLOUD-HOSTED | $358K |
| Sep 16, 2024 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702224F0074 | 541519 | MODELING, SOFTWARE, AND ENGINEERING SUPPORT CONTRACT IN SUPPORT THE OF AIR FORCE TECHNICAL APPLICATION CENTER. | $1000K |
| Sep 16, 2024 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702224F0077 | 541519 | MODELING, SOFTWARE, AND ENGINEERING SUPPORT CONTRACT IN SUPPORT OF THE AIR FORCE TECHNICAL APPLICATION CENTER. | $1.1M |
| Sep 13, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623C000003 | 541330 | THE GOVERNMENT HAS A NEED FOR CONTRACTED SERVICES SUPPORTING THE AUTOMATED TRACK INSPECTION PROGRAM (ATIP). ATIP PROVIDES GUIDANCE AND UNDERSTANDING REGARDING ON-TRACK SAFETY REQUIREMENTS, GEOMETRY MEASUREMENT TECHNOLOGY, OPERATION, AND NATIONAL DEPL | $1.6M |
| Sep 13, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00064N | 541715 | THE OBJECTIVE OF THIS WORK IS TO OBTAIN TECHNICAL SUBJECT MATTER EXPERT SUPPORT ON TANK CAR AND HAZMAT RESEARCH DURING THE 2ND ANNUAL CONFERENCE & TOUR AND THE TANK CAR AND HAZMAT WORKING GROUP MEETING. THE SME WILL PROVIDE A BRIEF HISTORY OF HIS | $26K |
| Sep 10, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00023N | 541715 | U.S. DEPARTMENT OF TRANSPORTATION (DOT), FEDERAL RAILROAD ADMINISTRATION (FRA), TECHNICAL TRAINING & STANDARD DIVISION (TTSD) FOR TRAINING CLASS SUPPORT SERVICES AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO. | $304K |
| Sep 9, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00056N | 541715 | RESEARCH TO PROVIDE FOLLOW-ON SERVICES OF WHEEL RESEARCH PROGRAM THAT FOCUS ON TAKING ADVANTAGE ON THE SIGNIFICANT PROGRESS AND ACCURACY OF THE FINITE ELEMENT ANALYSIS MODEL. | $470K |
| Sep 6, 2024 | Department of DefenseFA2521 45 CONS PK | FA252123F0149 | 541330 | SYSTEM ENGINEERING AND INTEGRATION SUPPORT STOPGAP | $826K |
| Sep 4, 2024 | Department of Transportation693JK3 ACQUISITION SERVICES DIV. | 693JK319F000059 | 541330 | TESTING PUBLIC SAFETY AWARENESS TECHNOLOGIES. | $383K |
| Sep 3, 2024 | Department of DefenseFA8658 AFLCMC EBR EBZ | FA865824FB015 | 541330 | AS PART OF THE CERTIFICATION PROCESS FOR THE CFSS, AN INDEPENDENT VERIFICATION AND VALIDATION IVV MUST ADDRESS THE CFSS AUTONOMOUS FLIGHT TERMINATION UNIT - MINIATURIZED (AFTU-M) WRAPPER SOFTWARE ANDTHE PROGRAMMABLE LOGIC DEVICE PLD DESIGNS. | $125K |
| Aug 29, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ622F00034N | 541715 | THE PURPOSE OF THE WORK IS TO SUPPORT THE FULL-SCALE TESTING PROGRAM. THIS PROGRAM WILL INCLUDE ONE FULL-SCALE DYNAMIC TEST OF A TANK CAR WITH COMPONENTS ADDED FOR PUNCTURE PROTECTION. | $935K |
| Aug 29, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623C000003 | 541330 | THE GOVERNMENT HAS A NEED FOR CONTRACTED SERVICES SUPPORTING THE AUTOMATED TRACK INSPECTION PROGRAM (ATIP). ATIP PROVIDES GUIDANCE AND UNDERSTANDING REGARDING ON-TRACK SAFETY REQUIREMENTS, GEOMETRY MEASUREMENT TECHNOLOGY, OPERATION, AND NATIONAL DEPL | $117K |
| Aug 29, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623F00049N | 541715 | THE OBJECTIVE OF THIS TASK IS TO PROVIDE GENERAL EQUIPMENT/INFRASTRUCTURE-RELATED SUPPORT TO ENABLE THE FRA TO SUSTAIN A STATE-OF-THE-ART FACILITY FOR RESEARCH, TESTING, AND TRAINING, AS WELL AS ENHANCE SITE CAPABILITIES FOR FUTURE GOVERNMENT-RELATED | $891K |
| Aug 29, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00044N | 541715 | THE OVERALL GOAL OF THIS MULTI-PHASE PROJECT IS TO ESTABLISH A VALUE, RANGE OF VALUES, OR MATHEMATICAL STRATEGY WHICH DESCRIBES THE TIME REQUIRED TO INSPECT A TRAIN PRIOR TO DEPARTURE ON A PER-CAR BASIS. THE RESULTS WILL BE USED TO BRIEF FRA EXECUTI | $122K |
| Aug 26, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00044N | 541715 | THE OVERALL GOAL OF THIS MULTI-PHASE PROJECT IS TO ESTABLISH A VALUE, RANGE OF VALUES, OR MATHEMATICAL STRATEGY WHICH DESCRIBES THE TIME REQUIRED TO INSPECT A TRAIN PRIOR TO DEPARTURE ON A PER-CAR BASIS. THE RESULTS WILL BE USED TO BRIEF FRA EXECUTI | $204K |
| Aug 20, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00043N | 541715 | PROCURE, INSTALL AND CONFIGURE A PRIVATE 5G CELLULAR SITE TO SERVE RAIL RESEARCH NEEDS AT THE TRANSPORTATION TECHNOLOGY CENTER. | $350K |
| Aug 13, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00041N | 541715 | THE PRIMARY OBJECTIVE OF THE PROPOSED RESEARCH IS TO CONTINUE THE ON-GOING EFFORT ON RAIL INTEGRITY AND ACHIEVE HIGHER RELIABILITY OF NDE INSPECTION/PROCEDURES FOR COMPLETE RAIL FLAW DETECTION AND CHARACTERIZATION. THIS PROPOSED SOLUTION AIMS TO PROV | $180K |
| Aug 9, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00039N | 541715 | FEASIBILITY/DESIGN STUDY TO DETERMINE IF AND HOW THE VTU CAN BE MODIFIED TO VALIDATE TRACK GEOMETRY CAR MEASUREMENT SYSTEMS. | $289K |
| Aug 9, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00040N | 541715 | THE OBJECTIVES OF THE RESEARCH PROJECT IS TO EVALUATE THE PERFORMANCE OF ADVANCED OESS AND ANCILLARY COMPONENTS, THEIR PROTECTIVE HOUSING, ATTACHMENT TO RAIL CAR, AND GENERAL ARRANGEMENT FOR CRASHWORTHINESS AND PERFORMANCE UNDERFIRE CONDITIONS. | $713K |
| Aug 8, 2024 | Department of Homeland SecurityMISSION ESSENTIALS | 70T05022F5900N013 | 541715 | UTILITIES, OPERATIONS AND MANAGEMENT SUPPORT FOR SURFACE TRANSPORTATION SECURITY READINESS FACILITY (STSRF). | $146K |
| Aug 7, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00038N | 541715 | THIS CAN BE BETTER DONE AT TTC DUE TO THE RESOURCES AVAILABLE THERE AND ITS FUTURE AS A TRAINING FACILITY AS THIS CONTRACT INVOLVES DEVELOPING TRAINING MATERIALS. | $150K |
| Aug 6, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00036N | 541715 | FOCUSING ON CWR MANAGEMENT AND CHARACTERIZATION OF PARAMETERS IN CURVES WITH ELASTIC FASTENING AND CONCRETE TIES - THE WORK WILL BE MUCH THE SAME BUT PRIOR EXPERIENCE EFFICIENCIES SHOULD OFFSET ANY INFLATION FROM NON-TTC LABOR RATES. TTC CENTER LABOR | $200K |
| Aug 1, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00035N | 541715 | PROVIDE SUPPORT FOR THE INTRODUCTION OF NEW TRACK INSPECTION TECHNOLOGIES AS WELL AS THE ADVANCEMENT OF EXISTING TECHNOLOGIES WITH A FOCUS ON SYSTEM INTEGRATION, DATA INTERPRETATION, AND ANALYSIS EFFORTS | $300K |
| Jul 31, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00034N | 541715 | PROVIDE FUNDING NECESSARY FOR THE OPERATIONS, MAINTENANCE, REPAIR, AND UPGRADES SUPPORT WHILE THE TEST VEHICLES ARE USED BY RDT ON AN AS NEEDED BASIS. | $300K |
| Jul 30, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00033N | 541715 | PERFORMANCE OF TRACK REPAIRS AT PCD UNDER CONTRACT 693JJ6-21-D-000001 | $99K |
| Jul 30, 2024 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702224F0059 | 541519 | MOBILE, SOFTWARE AND ENGINEERING SUPPORT FOR PERSISTENCE SURVEILLANCE PROGRAM | $343K |
| Jul 25, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623F00042N | 541715 | REPAIR AND RECOMMISSION SIGNALING AND POSITIVE TRAIN CONTROL (PTC) SYSTEMS ON THE RAIL TEST TRACK (RTT) AND TRANSIT TEST TRACK (TTT) AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) | $355K |
| Jul 24, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00030N | 541715 | ENSCO SHALL PROVIDE THE DOT/FRA WITH RESEARCH AND DEVELOPMENT TIME AND MATERIAL SERVICES ENTITLED, "ACQUISITION TRANSPORTATION & MAINTENANCE OF FAILED/DAMAGED TANK CARS," LOCATED IN PUEBLO, COLORADO. | $330K |
| Jul 22, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00032N | 541715 | RESEARCH TO DEMONSTRATE A PROOF-OF-CONCEPT SYSTEM THAT IDENTIFIES AREAS WITH POSSIBLE TRESPASSER ACTIVITY BY ANALYZING GEOLOCATION INFORMATION FROM SMART DEVICES OCCURRING WITHIN DESIGNATED RAIL CORRIDORS. | $279K |
| Jul 19, 2024 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702224F0065 | 541519 | MODELING, SOFTWARE AND ENGINEERING SUPPORT FOR PERSISTENCE SURVEILLANCE PROGRAM - TASK ORDER 96 | $3.5M |
| Jul 17, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ622F00026N | 541715 | TTC ADMINISTRATION SUPPORT UNDER CONTRACT 693JJ6-21-D-000001 | $65K |
| Jul 15, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623F00032N | 541715 | CONDUCT FIELD TESTING WITH A NORTH AMERICAN RAILROAD TO VALIDATE THE FROZEN BALLAST/RNT LOSS RELATIONSHIP DETERMINED FROM PREVIOUS FRA-FUNDED STUDIES. | $250K |
| Jul 2, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623F00017N | 541715 | THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE METHODOLOGY TO USE TTC EQUIPMENT AND TEST TRACK TO MEASURE VEHICLE PARAMETERS THAT CAN BE USED TO CREATE A VALIDATED VEHICLE MODEL TO BE USED FOR SIMULATION. | $92K |
| Jun 27, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00023N | 541715 | U.S. DEPARTMENT OF TRANSPORTATION (DOT), FEDERAL RAILROAD ADMINISTRATION (FRA), TECHNICAL TRAINING & STANDARD DIVISION (TTSD) FOR TRAINING CLASS SUPPORT SERVICES AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO. | $13K |
| Jun 18, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623F00049N | 541715 | THE OBJECTIVE OF THIS TASK IS TO PROVIDE GENERAL EQUIPMENT/INFRASTRUCTURE-RELATED SUPPORT TO ENABLE THE FRA TO SUSTAIN A STATE-OF-THE-ART FACILITY FOR RESEARCH, TESTING, AND TRAINING, AS WELL AS ENHANCE SITE CAPABILITIES FOR FUTURE GOVERNMENT-RELATED | $200K |
| Jun 17, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00025N | 541715 | RESEARCH INTO RAILROAD SWITCHING, SHOVING TRAINING, AND YARDMASTER TASK SATURATION | $480K |
| Jun 16, 2024 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702223F0071 | 541519 | MODELING, SOFTWARE AND ENGINEERING SUPPORT FOR PERSISTENT SURVEILLANCE PROGRAM. | $113K |
| Jun 11, 2024 | Department of DefenseFA8820 SUSTAINMENT SDACP SSC/PKL | FA882023C0003 | 541715 | SPACE TRAINING ACQUISITION OFFICE DEFENSIVE CYBER OPERATIONS SPACE SYSTEMS ENGINEERING AND INTEGRATION BRIDGE | $1.5M |
| May 31, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ623C000003 | 541330 | THE GOVERNMENT HAS A NEED FOR CONTRACTED SERVICES SUPPORTING THE AUTOMATED TRACK INSPECTION PROGRAM (ATIP). ATIP PROVIDES GUIDANCE AND UNDERSTANDING REGARDING ON-TRACK SAFETY REQUIREMENTS, GEOMETRY MEASUREMENT TECHNOLOGY, OPERATION, AND NATIONAL DEPL | $9.6M |
| May 30, 2024 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0048 | 541990 | SHORT-TERM PREDICTION RESEARCH AND TRANSITION (SPORT) PROJECT | $251K |
| May 29, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ624F00023N | 541715 | U.S. DEPARTMENT OF TRANSPORTATION (DOT), FEDERAL RAILROAD ADMINISTRATION (FRA), TECHNICAL TRAINING & STANDARD DIVISION (TTSD) FOR TRAINING CLASS SUPPORT SERVICES AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO. | $8K |
| May 17, 2024 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702224F0059 | 541519 | MOBILE, SOFTWARE AND ENGINEERING SUPPORT FOR PERSISTENCE SURVEILLANCE PROGRAM | $73K |
| May 15, 2024 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ622F00025N | 541715 | PROVIDE SUPPORT TO UNIVERSITY- AND THIRD-PARTY-LED RESEARCH INITIATIVES FOR CONTROLLED TESTING IN A "REAL-WORLD" SETTING AT TTC FOR NEW AND EMERGING TECHNOLOGIES. | $139K |
Get Alerted Before Ensco INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free