Skip to content

Federal Contractor Profile

Ensco INC

$859M obligated·487 awards·8 agencies·17 NAICS

Federal Contracts

Showing award actions 101–150 of 839 funded award actions, most recent first.

Contracts with positive obligations
487
Funded award actions shown
839
Obligations shown
$859M
Awarding agencies
8

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 27, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Sep 26, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00074N541715THE OBJECTIVE OF THIS TASK IS TO WRITE A 5-YEAR STRATEGIC PLAN FOR THE FRA OFFICE OF RESEARCH, DEVELOPMENT, AND TECHNOLOGY COVERING THE YEARS 2025 THROUGH 2029. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT, AND OTHER MATERIALS NECESSARY TO C$47K
Sep 25, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623F00029N541715UPGRADE TWO ACTIVE GRADE CROSSING SYSTEMS TO TRACK CIRCUIT-BASED CONSTANT WARNING TIME CONTROLLERS. ACQUISITION TITLE: TRANSPORTATION TECHNOLOGY CENTER ACTIVE GRADE CROSSING SYSTEM UPGRADE$125K
Sep 24, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00072N541715PUEBLO CHEMICAL DEPOT TRACK INSPECTIONS AND MAINTENANCE OCT 2022 - SEP 2024$461K
Sep 24, 2024Department of DefenseWASHINGTON HEADQUARTERS SERVICESHQ003423C0012541511SENTRY COMMAND AND CONTROL, INTEGRATION AND SUSTAINMENT SERVICES$170K
Sep 20, 2024Department of Homeland SecuritySECURITY TECHNOLOGY70T04023F7573N00654171570T04023F7573N006 UNDER FRA IDIQ NUMBER 693JJ621D000001 TO PROVIDE TESTING AND ASSESSMENT OF RAILCAR VULNERABILITY.$104K
Sep 19, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00069N541715THE OBJECTIVE OF THIS TASK IS TO DEVELOP A DETAILED PLAN FOR USE IN DEVELOPING A WAYSIDE DETECTOR TEST BED (WDTB) THAT SHALL INCLUDE THE PROCUREMENT AND INSTALLATION OF VARIOUS WAYSIDE DETECTOR TECHNOLOGIES AT TTC.$65K
Sep 19, 2024Department of Homeland SecurityMISSION ESSENTIALS70T05024F5900N011541715SURFACE TRANSPORTATION SECURITY TRAINING, COURSE DEVELOPMENT, AND ADMINISTRATION$2.3M
Sep 18, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00067N5417151. SUPPORT ONGOING COLLECTION OF LIDAR POINT CLOUD SCANS AT GRADE CROSSING THROUGH PARTNERSHIP WITH THE FRA OFFICE OF SAFETY AUTOMATED TRACK INSPECTION PROGRAM (ATIP). 2. SUPPORT EFFORTS OF FRA INFORMATION TECHNOLOGY (IT) TO ESTABLISH A CLOUD-HOSTED$358K
Sep 16, 2024Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKAFA702224F0074541519MODELING, SOFTWARE, AND ENGINEERING SUPPORT CONTRACT IN SUPPORT THE OF AIR FORCE TECHNICAL APPLICATION CENTER.$1000K
Sep 16, 2024Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKAFA702224F0077541519MODELING, SOFTWARE, AND ENGINEERING SUPPORT CONTRACT IN SUPPORT OF THE AIR FORCE TECHNICAL APPLICATION CENTER.$1.1M
Sep 13, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623C000003541330THE GOVERNMENT HAS A NEED FOR CONTRACTED SERVICES SUPPORTING THE AUTOMATED TRACK INSPECTION PROGRAM (ATIP). ATIP PROVIDES GUIDANCE AND UNDERSTANDING REGARDING ON-TRACK SAFETY REQUIREMENTS, GEOMETRY MEASUREMENT TECHNOLOGY, OPERATION, AND NATIONAL DEPL$1.6M
Sep 13, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00064N541715THE OBJECTIVE OF THIS WORK IS TO OBTAIN TECHNICAL SUBJECT MATTER EXPERT SUPPORT ON TANK CAR AND HAZMAT RESEARCH DURING THE 2ND ANNUAL CONFERENCE & TOUR AND THE TANK CAR AND HAZMAT WORKING GROUP MEETING. THE SME WILL PROVIDE A BRIEF HISTORY OF HIS$26K
Sep 10, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00023N541715U.S. DEPARTMENT OF TRANSPORTATION (DOT), FEDERAL RAILROAD ADMINISTRATION (FRA), TECHNICAL TRAINING & STANDARD DIVISION (TTSD) FOR TRAINING CLASS SUPPORT SERVICES AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO.$304K
Sep 9, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00056N541715RESEARCH TO PROVIDE FOLLOW-ON SERVICES OF WHEEL RESEARCH PROGRAM THAT FOCUS ON TAKING ADVANTAGE ON THE SIGNIFICANT PROGRESS AND ACCURACY OF THE FINITE ELEMENT ANALYSIS MODEL.$470K
Sep 6, 2024Department of DefenseFA2521 45 CONS PKFA252123F0149541330SYSTEM ENGINEERING AND INTEGRATION SUPPORT STOPGAP$826K
Sep 4, 2024Department of Transportation693JK3 ACQUISITION SERVICES DIV.693JK319F000059541330TESTING PUBLIC SAFETY AWARENESS TECHNOLOGIES.$383K
Sep 3, 2024Department of DefenseFA8658 AFLCMC EBR EBZFA865824FB015541330AS PART OF THE CERTIFICATION PROCESS FOR THE CFSS, AN INDEPENDENT VERIFICATION AND VALIDATION IVV MUST ADDRESS THE CFSS AUTONOMOUS FLIGHT TERMINATION UNIT - MINIATURIZED (AFTU-M) WRAPPER SOFTWARE ANDTHE PROGRAMMABLE LOGIC DEVICE PLD DESIGNS.$125K
Aug 29, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ622F00034N541715THE PURPOSE OF THE WORK IS TO SUPPORT THE FULL-SCALE TESTING PROGRAM. THIS PROGRAM WILL INCLUDE ONE FULL-SCALE DYNAMIC TEST OF A TANK CAR WITH COMPONENTS ADDED FOR PUNCTURE PROTECTION.$935K
Aug 29, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623C000003541330THE GOVERNMENT HAS A NEED FOR CONTRACTED SERVICES SUPPORTING THE AUTOMATED TRACK INSPECTION PROGRAM (ATIP). ATIP PROVIDES GUIDANCE AND UNDERSTANDING REGARDING ON-TRACK SAFETY REQUIREMENTS, GEOMETRY MEASUREMENT TECHNOLOGY, OPERATION, AND NATIONAL DEPL$117K
Aug 29, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623F00049N541715THE OBJECTIVE OF THIS TASK IS TO PROVIDE GENERAL EQUIPMENT/INFRASTRUCTURE-RELATED SUPPORT TO ENABLE THE FRA TO SUSTAIN A STATE-OF-THE-ART FACILITY FOR RESEARCH, TESTING, AND TRAINING, AS WELL AS ENHANCE SITE CAPABILITIES FOR FUTURE GOVERNMENT-RELATED$891K
Aug 29, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00044N541715THE OVERALL GOAL OF THIS MULTI-PHASE PROJECT IS TO ESTABLISH A VALUE, RANGE OF VALUES, OR MATHEMATICAL STRATEGY WHICH DESCRIBES THE TIME REQUIRED TO INSPECT A TRAIN PRIOR TO DEPARTURE ON A PER-CAR BASIS. THE RESULTS WILL BE USED TO BRIEF FRA EXECUTI$122K
Aug 26, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00044N541715THE OVERALL GOAL OF THIS MULTI-PHASE PROJECT IS TO ESTABLISH A VALUE, RANGE OF VALUES, OR MATHEMATICAL STRATEGY WHICH DESCRIBES THE TIME REQUIRED TO INSPECT A TRAIN PRIOR TO DEPARTURE ON A PER-CAR BASIS. THE RESULTS WILL BE USED TO BRIEF FRA EXECUTI$204K
Aug 20, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00043N541715PROCURE, INSTALL AND CONFIGURE A PRIVATE 5G CELLULAR SITE TO SERVE RAIL RESEARCH NEEDS AT THE TRANSPORTATION TECHNOLOGY CENTER.$350K
Aug 13, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00041N541715THE PRIMARY OBJECTIVE OF THE PROPOSED RESEARCH IS TO CONTINUE THE ON-GOING EFFORT ON RAIL INTEGRITY AND ACHIEVE HIGHER RELIABILITY OF NDE INSPECTION/PROCEDURES FOR COMPLETE RAIL FLAW DETECTION AND CHARACTERIZATION. THIS PROPOSED SOLUTION AIMS TO PROV$180K
Aug 9, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00039N541715FEASIBILITY/DESIGN STUDY TO DETERMINE IF AND HOW THE VTU CAN BE MODIFIED TO VALIDATE TRACK GEOMETRY CAR MEASUREMENT SYSTEMS.$289K
Aug 9, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00040N541715THE OBJECTIVES OF THE RESEARCH PROJECT IS TO EVALUATE THE PERFORMANCE OF ADVANCED OESS AND ANCILLARY COMPONENTS, THEIR PROTECTIVE HOUSING, ATTACHMENT TO RAIL CAR, AND GENERAL ARRANGEMENT FOR CRASHWORTHINESS AND PERFORMANCE UNDERFIRE CONDITIONS.$713K
Aug 8, 2024Department of Homeland SecurityMISSION ESSENTIALS70T05022F5900N013541715UTILITIES, OPERATIONS AND MANAGEMENT SUPPORT FOR SURFACE TRANSPORTATION SECURITY READINESS FACILITY (STSRF).$146K
Aug 7, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00038N541715THIS CAN BE BETTER DONE AT TTC DUE TO THE RESOURCES AVAILABLE THERE AND ITS FUTURE AS A TRAINING FACILITY AS THIS CONTRACT INVOLVES DEVELOPING TRAINING MATERIALS.$150K
Aug 6, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00036N541715FOCUSING ON CWR MANAGEMENT AND CHARACTERIZATION OF PARAMETERS IN CURVES WITH ELASTIC FASTENING AND CONCRETE TIES - THE WORK WILL BE MUCH THE SAME BUT PRIOR EXPERIENCE EFFICIENCIES SHOULD OFFSET ANY INFLATION FROM NON-TTC LABOR RATES. TTC CENTER LABOR$200K
Aug 1, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00035N541715PROVIDE SUPPORT FOR THE INTRODUCTION OF NEW TRACK INSPECTION TECHNOLOGIES AS WELL AS THE ADVANCEMENT OF EXISTING TECHNOLOGIES WITH A FOCUS ON SYSTEM INTEGRATION, DATA INTERPRETATION, AND ANALYSIS EFFORTS$300K
Jul 31, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00034N541715PROVIDE FUNDING NECESSARY FOR THE OPERATIONS, MAINTENANCE, REPAIR, AND UPGRADES SUPPORT WHILE THE TEST VEHICLES ARE USED BY RDT ON AN AS NEEDED BASIS.$300K
Jul 30, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00033N541715PERFORMANCE OF TRACK REPAIRS AT PCD UNDER CONTRACT 693JJ6-21-D-000001$99K
Jul 30, 2024Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKAFA702224F0059541519MOBILE, SOFTWARE AND ENGINEERING SUPPORT FOR PERSISTENCE SURVEILLANCE PROGRAM$343K
Jul 25, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623F00042N541715REPAIR AND RECOMMISSION SIGNALING AND POSITIVE TRAIN CONTROL (PTC) SYSTEMS ON THE RAIL TEST TRACK (RTT) AND TRANSIT TEST TRACK (TTT) AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC)$355K
Jul 24, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00030N541715ENSCO SHALL PROVIDE THE DOT/FRA WITH RESEARCH AND DEVELOPMENT TIME AND MATERIAL SERVICES ENTITLED, "ACQUISITION TRANSPORTATION & MAINTENANCE OF FAILED/DAMAGED TANK CARS," LOCATED IN PUEBLO, COLORADO.$330K
Jul 22, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00032N541715RESEARCH TO DEMONSTRATE A PROOF-OF-CONCEPT SYSTEM THAT IDENTIFIES AREAS WITH POSSIBLE TRESPASSER ACTIVITY BY ANALYZING GEOLOCATION INFORMATION FROM SMART DEVICES OCCURRING WITHIN DESIGNATED RAIL CORRIDORS.$279K
Jul 19, 2024Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKAFA702224F0065541519MODELING, SOFTWARE AND ENGINEERING SUPPORT FOR PERSISTENCE SURVEILLANCE PROGRAM - TASK ORDER 96$3.5M
Jul 17, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ622F00026N541715TTC ADMINISTRATION SUPPORT UNDER CONTRACT 693JJ6-21-D-000001$65K
Jul 15, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623F00032N541715CONDUCT FIELD TESTING WITH A NORTH AMERICAN RAILROAD TO VALIDATE THE FROZEN BALLAST/RNT LOSS RELATIONSHIP DETERMINED FROM PREVIOUS FRA-FUNDED STUDIES.$250K
Jul 2, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623F00017N541715THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE METHODOLOGY TO USE TTC EQUIPMENT AND TEST TRACK TO MEASURE VEHICLE PARAMETERS THAT CAN BE USED TO CREATE A VALIDATED VEHICLE MODEL TO BE USED FOR SIMULATION.$92K
Jun 27, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00023N541715U.S. DEPARTMENT OF TRANSPORTATION (DOT), FEDERAL RAILROAD ADMINISTRATION (FRA), TECHNICAL TRAINING & STANDARD DIVISION (TTSD) FOR TRAINING CLASS SUPPORT SERVICES AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO.$13K
Jun 18, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623F00049N541715THE OBJECTIVE OF THIS TASK IS TO PROVIDE GENERAL EQUIPMENT/INFRASTRUCTURE-RELATED SUPPORT TO ENABLE THE FRA TO SUSTAIN A STATE-OF-THE-ART FACILITY FOR RESEARCH, TESTING, AND TRAINING, AS WELL AS ENHANCE SITE CAPABILITIES FOR FUTURE GOVERNMENT-RELATED$200K
Jun 17, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00025N541715RESEARCH INTO RAILROAD SWITCHING, SHOVING TRAINING, AND YARDMASTER TASK SATURATION$480K
Jun 16, 2024Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKAFA702223F0071541519MODELING, SOFTWARE AND ENGINEERING SUPPORT FOR PERSISTENT SURVEILLANCE PROGRAM.$113K
Jun 11, 2024Department of DefenseFA8820 SUSTAINMENT SDACP SSC/PKLFA882023C0003541715SPACE TRAINING ACQUISITION OFFICE DEFENSIVE CYBER OPERATIONS SPACE SYSTEMS ENGINEERING AND INTEGRATION BRIDGE$1.5M
May 31, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ623C000003541330THE GOVERNMENT HAS A NEED FOR CONTRACTED SERVICES SUPPORTING THE AUTOMATED TRACK INSPECTION PROGRAM (ATIP). ATIP PROVIDES GUIDANCE AND UNDERSTANDING REGARDING ON-TRACK SAFETY REQUIREMENTS, GEOMETRY MEASUREMENT TECHNOLOGY, OPERATION, AND NATIONAL DEPL$9.6M
May 30, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0048541990SHORT-TERM PREDICTION RESEARCH AND TRANSITION (SPORT) PROJECT$251K
May 29, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ624F00023N541715U.S. DEPARTMENT OF TRANSPORTATION (DOT), FEDERAL RAILROAD ADMINISTRATION (FRA), TECHNICAL TRAINING & STANDARD DIVISION (TTSD) FOR TRAINING CLASS SUPPORT SERVICES AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO.$8K
May 17, 2024Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKAFA702224F0059541519MOBILE, SOFTWARE AND ENGINEERING SUPPORT FOR PERSISTENCE SURVEILLANCE PROGRAM$73K
May 15, 2024Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ622F00025N541715PROVIDE SUPPORT TO UNIVERSITY- AND THIRD-PARTY-LED RESEARCH INITIATIVES FOR CONTROLLED TESTING IN A "REAL-WORLD" SETTING AT TTC FOR NEW AND EMERGING TECHNOLOGIES.$139K

Get Alerted Before Ensco INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free