Federal Contractor Profile
Fiber Materials INC.
$47.0M obligated·91 awards·2 agencies·4 NAICS
Federal Contracts
Showing contracts 51–100 of 110 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Dec 2, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0026 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. CALL ORDER 21C. | $127K |
| Nov 10, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0010 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. BPA CALL ORDER 21A. | $148K |
| Nov 10, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0021 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. | $127K |
| Oct 23, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0007 | 541712 | PICA TASK 22 - DRAGONFLY TPS FABRICATION PROGRAM MANAGEMENT SUPPORT, PURCHASE OF LYOCELL, AND STORAGE LYOCELL. | $187K |
| Oct 23, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0008 | 541712 | TASK 24 - PHENOLIC IMPREGNATED CARBON ABLATOR (PICA) PROCESS PRODUCTION START UP AND PICA-D PRODUCTION. | $125K |
| Oct 9, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0003 | 541712 | TASK 23 - 1.3M SINGLE PIECE NEAR NET SHAPE AEROSHELL FORMING AND INFUSION TOOLING DESIGN - PICA SUSTAINABILITY | $100K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0064 | 541712 | PICA TASK 19A - DOUGLAS VESSEL MOVE | $220K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0065 | 541712 | PICA TASK 19B - DRYING OVENS AND MACHINING EQUIPMENT | $169K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0066 | 541712 | PICA TASK 19C - CASTING SYSTEM ELECTRICAL | $55K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0067 | 541712 | PICA TASK 20A - NASH PUMP AND CASTING CONTROLS | $225K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0068 | 541712 | PICA SUSTAINABILITY - TASK 20B - DUST COLLECTOR AND VARCUM VACUUM SYSTEM. | $230K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0069 | 541712 | PICA SUSTAINABILITY - TASK 20C - CASTING PLATFORM, CRANE AND TOOLING. | $151K |
| Jan 14, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0031 | 541712 | PICA TASK 17B COMPLETION OF ELECTRICAL UPGRADES PART 1 | $177K |
| Jan 14, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0032 | 541712 | PICA TASK 17C COMPLETION OF ELECTRICAL UPGRADES PART 1 | $153K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0003 | 541712 | PICA - TASK 16A - DETAILED ENGINEERING DESIGN FOR FUTURE TASKS. | $92K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0005 | 541712 | PICA - TASK 16B - PREPARE AND SHUT DOWN FIBERFORM AND PICA PRODUCTION EQUIPMENT | $212K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0006 | 541712 | PICA - TASK 17A - PERFORM ELECTRICAL UPGRADES | $212K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0007 | 541712 | PICA - TASK 18A - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT. | $68K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0008 | 541712 | PICA - TASK 18B - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT. | $163K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0009 | 541712 | PICA - TASK 18C - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT. | $134K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0010 | 541712 | PICA - TASK 18D - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT. | $157K |
| Sep 23, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0090 | 541712 | PICA-D SUST TASK 15 | $139K |
| Apr 29, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0023 | 541712 | MECHANICAL TESTING - PROVIDE THERMAL AND MECHANICAL PROPERTIES OBTAINED. | $12K |
| Apr 8, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0018 | 541712 | A SUSTAINABLE DOMESTIC FIBERFORM PRECURSOR SOURCE (USING BRIGHT LYOCELL PRECURSOR WITHOUT TITANIUM DULLING AGENT) WILL BE UTILIZED FOR THIS. FIBERFORM BLANK MINI-SPRITE MODELS PREVIOUSLY MADE IN TASK 13 WILL BE USED IN THIS TASK (TARGET DENSITY OF 0.17 +/- 0.01 G/CC). RIGID PICA-D BILLETS (PREVIOUSLY MADE IN TASK 13) AND NASA HEEET TPS (PROVIDED BY NASA) WILL ALSO BE USED IN THIS TASK. SPECIFIC ELEMENTS OF TASK 14 ARE AS FOLLOWS PICA-D-DRW: 004, 011, 013, 015. | $43K |
| Apr 8, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0019 | 541712 | IN TASK 10D, A SET OF PROPERTIES WILL BE EVALUATED TO DETERMINE LYOCELL DERIVED PICA-CHAR PERFORMANCE AND COMPARE TO FIBERFORM. THE LYOCELL DERIVED PICA AND FIBERFORM USED FOR THIS TESTING WILL BE MANUFACTURED UNDER TASK 9 OF THIS BLANKET PURCHASE AGREEMENT. SPECIFIC ELEMENTS OF TASK 10D ARE AS FOLLOWS: CREATE CARBON CHAR, FIBER FORM, AND PICA-D. | $146K |
| Aug 15, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0118 | 541712 | IGF::OT::IGF CALL UNDER BPA NNA16BE83Z, FOR CASTING EQUIPMENT AND TOOLING DESIGN AND FABRICATION, FIBER PROCESSING | $156K |
| Aug 15, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0119 | 541712 | IGF::OT::IGF CALL UNDER BPA NNA16BE83Z FOR NEAR NET SHAPED (NNS) FIBERFORM FABRICATION. | $122K |
| Aug 15, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0120 | 541712 | IGF::OT::IGF BPA CALL UNDER NNA16BE83Z FOR NEAR NET SHAPED (NNS) FIBERFORM MACHINING, EVALUATION , DELIVERY, FABRICATION OF SPRITE MODEL PREFORMS, AND PICA DENSIFICATION | $144K |
| Jun 28, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0108 | 541712 | IGF::OT::IGF HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) SHOULDER ESH GAP FABRICATION | $25K |
| Jun 7, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0106 | 541712 | IGF::OT::IGF HEEET ESH GAP FABRICATION AND LASER SCAN OF HEEET THERMAL PROTECTION MATERIALS | $15K |
| Apr 25, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0065 | 541712 | IGF::OT::IGF THIS IS BPA CALL NUMBER 80ARC018F0062 UNDER BPA NNA16BE83Z, TO ORDER TASK 10, MECHANICAL AND THERMAL CONDUCTIVITY TESTING OF LYOCELL DERIVED PICA | $112K |
| Apr 6, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0062 | 541712 | IGF::OT::IGF RAYON PROCUREMENT AND PICA BILLET FABRICATION | $118K |
| Mar 6, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0056 | 541712 | IGF::OT::IGF HEEET WEAVE DENSIFICATION AND PROPERTY TESTING | $96K |
| Feb 5, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC017F0041 | 541712 | IGF::OT::IGF NASA REQUIRES A SERIES OF PREFORMS TO BE INFUSED, THE PREFORMS WILL BE PROVIDED BY NASA. THE QUANTITY OF PREFORMS PROVIDED WILL FIT IN THE STANDARD INFUSION VESSEL. | $14K |
| Sep 12, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC017F0041 | 541712 | IGF::OT::IGF NASA REQUIRES A SERIES OF PREFORMS TO BE INFUSED, THE PREFORMS WILL BE PROVIDED BY NASA. THE QUANTITY OF PREFORMS PROVIDED WILL FIT IN THE STANDARD INFUSION VESSEL. | $72K |
| Sep 6, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF81T | 541712 | IGF::OT::IGF POST WEAVING MANUFACTURING SUPPORT FOR THE HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT. | $19K |
| Jul 18, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC017F0021 | 541712 | IGF::OT::IGFIN PREPARATION FOR ARC JET CHARACTERIZATION OF LYOCELL DERIVED PICA MATERIAL AND COMPARING PERFORMANCE AND PROPERTIES TO HERITAGE PICA MATERIAL, NASA REQUIRES A SERIES OF VIRGIN PICA PRE-ASSEMBLED ARC JET BLANKS. FMI SHALL PACKAGE AND SHIP THE MACHINED PARTS TO NASA AMES. PICA PRECURSOR TYPE (LYOCELL, FERMOSA OR SNIACE) AND PICA DENSITY NEED TO BE TRACKED AND LABELED ON EACH MACHINED PART PROVIDED. THE PART WILL NOT BE DIRECTLY LABELED BUT THE PACKAGING MATERIAL CAN BE MARKED ACCORDINGLY. | $14K |
| Jul 13, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BD37T | 541712 | IGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERS | $7K |
| Jun 28, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC017F0011 | 541712 | IGF::OT::IGFPOST WEAVING MANUFACTURING SUPPORT FOR THE HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET PROJECT | $81K |
| May 30, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF81T | 541712 | IGF::OT::IGF POST WEAVING MANUFACTURING SUPPORT FOR THE HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT. | $71K |
| Mar 27, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BD37T | 541712 | IGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERS | $49K |
| Mar 6, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF56T | 541712 | IGF::OT::IGF CALL UNDER PICA SUSTAINABILITY BLANKET PURCHASE AGREEMENT NNA16BE83Z MECHANICAL AND THERMAL CONDUCTIVITY TESTING OF LYOCELL DERIVED PICA. , A SET OF PROPERTIES WILL BE EVALUATED TO DETERMINE LYOCELL DERIVED PICA PERFORMANCE AND COMPARE TO HERITAGE SNIACE PICA. | $39K |
| Mar 6, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF52T | 541712 | IGF::OT::IGF CALL UNDER PICA SUSTAINABILITY BLANKET PURCHASE AGREEMENT NNA16BE83Z | $112K |
| Feb 16, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF55T | 541712 | IGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERS | $34K |
| Nov 17, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF33T | 541712 | IGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERS | $20K |
| Nov 17, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF32T | 541712 | IGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERS | $18K |
| Sep 27, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE84T | 541712 | IGF::OT::IGF BPA CALL UNDER NNA16BE83Z FOR FIBER PROCESSING. THIS TASK INVOLVES THE CARBONIZATION OF THE LIMITED QUANTITY OF SNIACE RAYON STILL AVAILABLE AT FMI, PROCUREMENT OF THAT MATERIAL AND COMPLETING THE FOLLOWING TASKS: FMI SHALL CONVERT THE ORGANIC RAYON TO CARBON "BLACK GOODS" SUITABLE FOR MAKING THE PICA PREFORM/FIBERFORM MATERIAL (THE RAYON FIBER CONVERSION PROFILE WILL FOLLOW THE SAME PROFILE AS USED FOR OSIRIS-REX). | $34K |
| Sep 27, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE85T | 541712 | IGF::OT::IGF BPA CALL UNDER NNA16BE83Z FOR PICA SUSTAINABILITY. THE CONTRACTOR SHALL STORE APPROXIMATELY 800 LBS. OF SNIACE RAYON CARBON BLACK GOODS AT THE CONTRACTOR'S FACILITY FOR A PERIOD UP TO FIVE YEARS FOR FUTURE NASA SCIENCE MISSION DIRECTORATE (SMD) MISSION NEEDS. | $23K |
| Sep 7, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE64T | 541712 | IGF::OT::IGF IGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERS | $98K |
| Sep 7, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE68T | 541712 | IGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERS | $54K |
Get Alerted Before Fiber Materials INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free