Federal Contractor Profile
Graftech International LTD.
$68M obligated·121 awards·2 agencies·7 NAICS
Federal Contracts
Showing award actions 51–100 of 147 funded award actions, most recent first.
- Contracts with positive obligations
- 121
- Funded award actions shown
- 147
- Obligations shown
- $68M
- Awarding agencies
- 2
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 28, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 30, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0093 | 541715 | TPS FOR SMD - DRAGONFLY 6-INCH PICA D BLANKS | $422K |
| Sep 24, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0120 | 541715 | TEAM SURROGATE DEV UNIT MACHINING UPDATE AND 3MDCP PHASE 1 TESTING: DEVELOPMENT | $729K |
| Sep 15, 2021 | Department of DefenseNSWC DAHLGREN | N0017821FD481 | 541712 | REENTRY MATERIAL FOR US PROGRAMS (FFP) | $345K |
| Jun 9, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0116 | 541715 | FABRICATION OF SINGLE PIECE 3MDCP DEVELOPMENT UNIT, FLAT PANELS AND MANUFACTURING DEVELOPMENT UNIT (MDU) FROM GFE SURROGATE WEAVE | $1.6M |
| Jun 2, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0098 | 541712 | ELEMENTAL ANALYSIS,TENSION TESTING OF FIBERFORM, AND CHAR YIELD ANALYSIS OF (1) 6-INCH AND (1) 8-INCH PICA-BILLET. | $62K |
| May 18, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0093 | 541715 | TPS FOR SMD - DRAGONFLY 6-INCH PICA D BLANKS | $550K |
| May 6, 2021 | Department of DefenseNSWC DAHLGREN | N0017820FD478 | 541712 | SUB-SCALE PREFORM FAB AND DENSIFICATION PROCESS BASELINING | $21K |
| Apr 26, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0094 | 541715 | MARS SAMPLE RETURN EARTH ENTRY VEHICLE (MSR EEV) - FABRICATION OF FORMING AND RESIN INFUSION TOOLING TO SUPPORT MANUFACTURING OF THE SINGLE PIECE 3MDCP DEVELOPMENT UNIT | $299K |
| Apr 22, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0093 | 541715 | TPS FOR SMD - DRAGONFLY 6-INCH PICA D BLANKS | $576K |
| Feb 19, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0054 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. CALL ORDER 21F. | $194K |
| Feb 19, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0057 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. CALL ORDER 21G. | $174K |
| Feb 12, 2021 | Department of DefenseNSWC DAHLGREN | N0017821FD423 | 541712 | FABRICATION OF REENTRY BODY TPSM (FMS) | $54K |
| Jan 22, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0053 | 541715 | FLIGHT THERMAL PROTECTION SYSTEMS (TPS) FOR SMD MISSIONS | $636K |
| Jan 20, 2021 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0042 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. CALL ORDER 21E. | $126K |
| Dec 21, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0039 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. CALL ORDER 21D. | $126K |
| Dec 2, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0026 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. CALL ORDER 21C. | $127K |
| Nov 10, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0010 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. BPA CALL ORDER 21A. | $148K |
| Nov 10, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0021 | 541712 | FABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. | $127K |
| Oct 23, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0007 | 541712 | PICA TASK 22 - DRAGONFLY TPS FABRICATION PROGRAM MANAGEMENT SUPPORT, PURCHASE OF LYOCELL, AND STORAGE LYOCELL. | $187K |
| Oct 23, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0008 | 541712 | TASK 24 - PHENOLIC IMPREGNATED CARBON ABLATOR (PICA) PROCESS PRODUCTION START UP AND PICA-D PRODUCTION. | $125K |
| Oct 9, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC021F0003 | 541712 | TASK 23 - 1.3M SINGLE PIECE NEAR NET SHAPE AEROSHELL FORMING AND INFUSION TOOLING DESIGN - PICA SUSTAINABILITY | $100K |
| Aug 24, 2020 | Department of DefenseNSWC DAHLGREN | N0017820FD478 | 541712 | SUB-SCALE PREFORM FAB AND DENSIFICATION PROCESS BASELINING | $503K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0064 | 541712 | PICA TASK 19A - DOUGLAS VESSEL MOVE | $220K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0065 | 541712 | PICA TASK 19B - DRYING OVENS AND MACHINING EQUIPMENT | $169K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0066 | 541712 | PICA TASK 19C - CASTING SYSTEM ELECTRICAL | $55K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0067 | 541712 | PICA TASK 20A - NASH PUMP AND CASTING CONTROLS | $225K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0068 | 541712 | PICA SUSTAINABILITY - TASK 20B - DUST COLLECTOR AND VARCUM VACUUM SYSTEM. | $230K |
| Apr 30, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0069 | 541712 | PICA SUSTAINABILITY - TASK 20C - CASTING PLATFORM, CRANE AND TOOLING. | $151K |
| Jan 24, 2020 | Department of DefenseNSWC DAHLGREN | N0017820FD424 | 541712 | TASK ORDER FOR THE MOC3HA INITIATIVE | $341K |
| Jan 14, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0031 | 541712 | PICA TASK 17B COMPLETION OF ELECTRICAL UPGRADES PART 1 | $177K |
| Jan 14, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0032 | 541712 | PICA TASK 17C COMPLETION OF ELECTRICAL UPGRADES PART 1 | $153K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0003 | 541712 | PICA - TASK 16A - DETAILED ENGINEERING DESIGN FOR FUTURE TASKS. | $92K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0005 | 541712 | PICA - TASK 16B - PREPARE AND SHUT DOWN FIBERFORM AND PICA PRODUCTION EQUIPMENT | $212K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0006 | 541712 | PICA - TASK 17A - PERFORM ELECTRICAL UPGRADES | $212K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0007 | 541712 | PICA - TASK 18A - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT. | $68K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0008 | 541712 | PICA - TASK 18B - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT. | $163K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0009 | 541712 | PICA - TASK 18C - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT. | $134K |
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0010 | 541712 | PICA - TASK 18D - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT. | $157K |
| Sep 26, 2019 | Department of DefenseNSWC DAHLGREN | N0017819FD479 | 541712 | REENTRY MATERIAL FOR US PROGRAMS | $1.0M |
| Sep 25, 2019 | Department of DefenseNSWC DAHLGREN | N0017819FD480 | 541712 | BULK BUY OF PRECURSOR MATERIAL FOR U.S. AND FMS | $1.6M |
| Sep 23, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0090 | 541712 | PICA-D SUST TASK 15 | $139K |
| May 29, 2019 | Department of DefenseFA8219 AFNWC PZBG | FA821918C0004 | 541330 | IGF::OT::IGF REENTRY VEHICLE APPLICATION PROGRAM NOSETIP MATERIAL REPLACEMENT | $560K |
| Apr 29, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0023 | 541712 | MECHANICAL TESTING - PROVIDE THERMAL AND MECHANICAL PROPERTIES OBTAINED. | $12K |
| Apr 11, 2019 | Department of DefenseNSWC DAHLGREN | N0017819FD445 | 541712 | FABRICATION OF REENTRY BODY TPSM (US) IGF::OT::IGF | $722K |
| Apr 8, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0018 | 541712 | A SUSTAINABLE DOMESTIC FIBERFORM PRECURSOR SOURCE (USING BRIGHT LYOCELL PRECURSOR WITHOUT TITANIUM DULLING AGENT) WILL BE UTILIZED FOR THIS. FIBERFORM BLANK MINI-SPRITE MODELS PREVIOUSLY MADE IN TASK 13 WILL BE USED IN THIS TASK (TARGET DENSITY OF 0.17 +/- 0.01 G/CC). RIGID PICA-D BILLETS (PREVIOUSLY MADE IN TASK 13) AND NASA HEEET TPS (PROVIDED BY NASA) WILL ALSO BE USED IN THIS TASK. SPECIFIC ELEMENTS OF TASK 14 ARE AS FOLLOWS PICA-D-DRW: 004, 011, 013, 015. | $43K |
| Apr 8, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0019 | 541712 | IN TASK 10D, A SET OF PROPERTIES WILL BE EVALUATED TO DETERMINE LYOCELL DERIVED PICA-CHAR PERFORMANCE AND COMPARE TO FIBERFORM. THE LYOCELL DERIVED PICA AND FIBERFORM USED FOR THIS TESTING WILL BE MANUFACTURED UNDER TASK 9 OF THIS BLANKET PURCHASE AGREEMENT. SPECIFIC ELEMENTS OF TASK 10D ARE AS FOLLOWS: CREATE CARBON CHAR, FIBER FORM, AND PICA-D. | $146K |
| Sep 24, 2018 | Department of DefenseNSWC DAHLGREN | N0017818FD484 | 541712 | FABRICATION OF REENTRY BODY TPSM (US) IGF::OT::IGF | $1.4M |
| Sep 24, 2018 | Department of DefenseNSWC DAHLGREN | N0017818FD486 | 541712 | FABRICATION OF REENTRY BODY TPSM (US) IGF::OT::IGF | $656K |
| Sep 24, 2018 | Department of DefenseNSWC DAHLGREN | N0017818FD485 | 541712 | FABRICATION OF REENTRY BODY TPSM (US) IGF::OT::IGF | $1.6M |
| Aug 15, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0120 | 541712 | IGF::OT::IGF BPA CALL UNDER NNA16BE83Z FOR NEAR NET SHAPED (NNS) FIBERFORM MACHINING, EVALUATION , DELIVERY, FABRICATION OF SPRITE MODEL PREFORMS, AND PICA DENSIFICATION | $144K |
Get Alerted Before Graftech International LTD.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free