Skip to content
Home/Contractors/Island Roads Corporation

Federal Contractor Profile

Island Roads Corporation

Federal contracting record: $51M obligated across 7 awards from 1 agencies, FY 2016–2024.

$51M
Total Obligated
7
Award Records
1
Agencies Served
1
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

DDYED5LKN8M6

CAGE Code

35XA1

Address

6501 REDHOOK PLZ STE 201, CHARLOTTE AMALIE, VI, 008021373

First Federal Award

Mar 30, 2016

Most Recent Award

Jul 31, 2024

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 237310

    HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

    7 awards

    $51M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Mar 10, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THIS REQUEST FOR PROPOSAL (RFP) IS FOR THE VIRGIN ISLANDS DEPARTMENT OF PUBLIC WORKS PROJECT VI ST ER STJ (002), STT (004), LOCATED ON THE ISLAND OF ST. THOMAS AND ST. JOHN, UNITED STATES VIRGIN ISLANDS IN STRICT ACCORDANCE WITH THE SOLICITATION INS$746K
Mar 25, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THIS REQUEST FOR PROPOSAL (RFP) IS FOR THE VIRGIN ISLANDS DEPARTMENT OF PUBLIC WORKS PROJECT VI ST ER STJ (002), STT (004), LOCATED ON THE ISLAND OF ST. THOMAS AND ST. JOHN, UNITED STATES VIRGIN ISLANDS IN STRICT ACCORDANCE WITH THE SOLICITATION INS$2.9M
Feb 5, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310STIPULATED FEE FOR UNSUCCESSFUL FIRM FOR RFP 693C73-20-R-000007, PROJECT VI ST ER STX (003) PROJECT.$30K
Jan 29, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THIS REQUEST FOR PROPOSAL (RFP) IS FOR THE VIRGIN ISLANDS DEPARTMENT OF PUBLIC WORKS PROJECT VI ST ER STJ (002), STT (004), LOCATED ON THE ISLAND OF ST. THOMAS AND ST. JOHN, UNITED STATES VIRGIN ISLANDS IN STRICT ACCORDANCE WITH THE SOLICITATION INS$884K
Nov 18, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THIS REQUEST FOR PROPOSAL (RFP) IS FOR THE VIRGIN ISLANDS DEPARTMENT OF PUBLIC WORKS PROJECT VI ST ER STJ (002), STT (004), LOCATED ON THE ISLAND OF ST. THOMAS AND ST. JOHN, UNITED STATES VIRGIN ISLANDS IN STRICT ACCORDANCE WITH THE SOLICITATION INS$20M
May 13, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: DESIGN-BUILD PROJECT VI A30(001), TURPENTINE RUN BRIDGE THE TURPENTINE RUN BRIDGE ON ST. THOMAS, US VIRGIN ISLANDS, WAS CONSTRUCTED IN 1996 AS PART OF AN ARMY CORPS OF ENGINEERS (USACE) FLOOD CONTROL PROJECT. HOWEVER, THE BRIDGE APPROACHES AND ASSOCIATED ROADWAY WORK ON BOLONGO BAY ROAD AND TURPENTINE RUN ROAD WERE DELAYED DUE TO ACQUISITION OF RIGHT OF WAY AND WERE NEVER CONSTRUCTED. PROJECT VI A30(001) CONSISTS OF CONSTRUCTION OF BRIDGE APPROACHES TO THE TURPENTINE RUN BRIDGE, INCLUDING REALIGNMENT OF APPROXIMATELY 600 OF BOLONGO BAY ROAD (ROUTE 30) AND REALIGNMENT OF APPROXIMATELY 1200 OF TURPENTINE RUN ROAD (ROUTE 32). PROPOSED IMPROVEMENTS INCLUDE, BUT ARE NOT LIMITED TO, UTILITY RELOCATIONS, SIGNAL INSTALLATION, DRAINAGE IMPROVEMENTS, MINOR BRIDGE REHABILITATION, AND ROADSIDE SAFETY IMPROVEMENTS.$518K
Aug 21, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION237310VIRGIN ISLANDS NATIONAL PARK - VI ERFO NPS 2017-1(1) - THE PROJECT CONSISTS OF STORM DAMAGE REPAIRS ON NORTH SHORE ROAD AND ON JOHN HEAD ROAD. THE WORK INCLUDES ROADWAY EXCAVATION, SHORING AND BRACING, AGGREGATE BASE, HOT ASPHALT CONCRETE PAVEMENT,$931K
Aug 23, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THE WORK INVOLVES EMERGENCY REPAIRS OF DAMAGED TRAFFIC SIGNAL SYSTEMS AT MULTIPLE SITES ON ST. THOMAS, U.S. VIRGIN ISLANDS.$3.0M
Jun 11, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THE WORK INVOLVES EMERGENCY REPAIRS OF DAMAGED TRAFFIC SIGNAL SYSTEMS AT MULTIPLE SITES ON ST. THOMAS, U.S. VIRGIN ISLANDS.$564K
May 30, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF THE WORK CONSISTS OF THE DESIGN AND CONSTRUCTION OF TRAFFIC SIGNAL SYSTEMS, COMPLETE AND IN PLACE. THE WORK INCLUDES THE REMOVAL OF THE DAMAGED COMPONENTS OF THE EXISTING TRAFFIC SIGNAL SYSTEMS, AND THE INSTALLATION OF FOUNDATIONS, SIGNAL POLES, MAST ARMS, SIGNAL HEADS, CONTROLLER CABINETS, MANHOLES, CONDUITS, WIRING, VEHICLE DETECTORS, ELECTRICAL SERVICE, TRAFFIC SIGNAL COMMUNICATIONS, AND ANY OTHER MISCELLANEOUS ITEMS REQUIRED TO PROVIDE FULLY FUNCTIONAL TRAFFIC SIGNAL SYSTEMS.$7K
Apr 4, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THE WORK INVOLVES EMERGENCY REPAIRS OF DAMAGED TRAFFIC SIGNAL SYSTEMS AT MULTIPLE SITES ON ST. THOMAS, U.S. VIRGIN ISLANDS.$1.5M
Apr 3, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: VI 38(2) CONTRACT 1 THE PROJECT CONSISTS OF WIDENING AND REHABILITATING RAPHUNE HILL ROAD (ROUTE 38), AND CENTERLINE AND RACE TRACK ROADS (ROUTE 313) AT THE RAPHUNE HILL INTERSECTION. THE WORK INCLUDES ASPHALT PAVEMENT RECONSTRUCTION, AGGREGATE BASE, HOT ASPHALT CONCRETE PAVEMENT, CONCRETE SIDEWALK AND CURB AND GUTTER, DRAINAGE, UTILITY RELOCATION, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$107K
Apr 3, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF THE WORK CONSISTS OF THE DESIGN AND CONSTRUCTION OF TRAFFIC SIGNAL SYSTEMS, COMPLETE AND IN PLACE. THE WORK INCLUDES THE REMOVAL OF THE DAMAGED COMPONENTS OF THE EXISTING TRAFFIC SIGNAL SYSTEMS, AND THE INSTALLATION OF FOUNDATIONS, SIGNAL POLES, MAST ARMS, SIGNAL HEADS, CONTROLLER CABINETS, MANHOLES, CONDUITS, WIRING, VEHICLE DETECTORS, ELECTRICAL SERVICE, TRAFFIC SIGNAL COMMUNICATIONS, AND ANY OTHER MISCELLANEOUS ITEMS REQUIRED TO PROVIDE FULLY FUNCTIONAL TRAFFIC SIGNAL SYSTEMS.$1.1M
Jan 19, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF THE WORK CONSISTS OF THE DESIGN AND CONSTRUCTION OF TRAFFIC SIGNAL SYSTEMS, COMPLETE AND IN PLACE. THE WORK INCLUDES THE REMOVAL OF THE DAMAGED COMPONENTS OF THE EXISTING TRAFFIC SIGNAL SYSTEMS, AND THE INSTALLATION OF FOUNDATIONS, SIGNAL POLES, MAST ARMS, SIGNAL HEADS, CONTROLLER CABINETS, MANHOLES, CONDUITS, WIRING, VEHICLE DETECTORS, ELECTRICAL SERVICE, TRAFFIC SIGNAL COMMUNICATIONS, AND ANY OTHER MISCELLANEOUS ITEMS REQUIRED TO PROVIDE FULLY FUNCTIONAL TRAFFIC SIGNAL SYSTEMS.$438K
Nov 30, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF THE WORK CONSISTS OF THE DESIGN AND CONSTRUCTION OF TRAFFIC SIGNAL SYSTEMS, COMPLETE AND IN PLACE. THE WORK INCLUDES THE REMOVAL OF THE DAMAGED COMPONENTS OF THE EXISTING TRAFFIC SIGNAL SYSTEMS, AND THE INSTALLATION OF FOUNDATIONS, SIGNAL POLES, MAST ARMS, SIGNAL HEADS, CONTROLLER CABINETS, MANHOLES, CONDUITS, WIRING, VEHICLE DETECTORS, ELECTRICAL SERVICE, TRAFFIC SIGNAL COMMUNICATIONS, AND ANY OTHER MISCELLANEOUS ITEMS REQUIRED TO PROVIDE FULLY FUNCTIONAL TRAFFIC SIGNAL SYSTEMS.$3.6M
Aug 23, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: DESIGN-BUILD PROJECT VI A30(001), TURPENTINE RUN BRIDGE THE TURPENTINE RUN BRIDGE ON ST. THOMAS, US VIRGIN ISLANDS, WAS CONSTRUCTED IN 1996 AS PART OF AN ARMY CORPS OF ENGINEERS (USACE) FLOOD CONTROL PROJECT. HOWEVER, THE BRIDGE APPROACHES AND ASSOCIATED ROADWAY WORK ON BOLONGO BAY ROAD AND TURPENTINE RUN ROAD WERE DELAYED DUE TO ACQUISITION OF RIGHT OF WAY AND WERE NEVER CONSTRUCTED. PROJECT VI A30(001) CONSISTS OF CONSTRUCTION OF BRIDGE APPROACHES TO THE TURPENTINE RUN BRIDGE, INCLUDING REALIGNMENT OF APPROXIMATELY 600 OF BOLONGO BAY ROAD (ROUTE 30) AND REALIGNMENT OF APPROXIMATELY 1200 OF TURPENTINE RUN ROAD (ROUTE 32). PROPOSED IMPROVEMENTS INCLUDE, BUT ARE NOT LIMITED TO, UTILITY RELOCATIONS, SIGNAL INSTALLATION, DRAINAGE IMPROVEMENTS, MINOR BRIDGE REHABILITATION, AND ROADSIDE SAFETY IMPROVEMENTS.$2.7M
Feb 23, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: VI 38(2) CONTRACT 1 THE PROJECT CONSISTS OF WIDENING AND REHABILITATING RAPHUNE HILL ROAD (ROUTE 38), AND CENTERLINE AND RACE TRACK ROADS (ROUTE 313) AT THE RAPHUNE HILL INTERSECTION. THE WORK INCLUDES ASPHALT PAVEMENT RECONSTRUCTION, AGGREGATE BASE, HOT ASPHALT CONCRETE PAVEMENT, CONCRETE SIDEWALK AND CURB AND GUTTER, DRAINAGE, UTILITY RELOCATION, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$987K
Sep 9, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: DESIGN-BUILD PROJECT VI A30(001), TURPENTINE RUN BRIDGE THE TURPENTINE RUN BRIDGE ON ST. THOMAS, US VIRGIN ISLANDS, WAS CONSTRUCTED IN 1996 AS PART OF AN ARMY CORPS OF ENGINEERS (USACE) FLOOD CONTROL PROJECT. HOWEVER, THE BRIDGE APPROACHES AND ASSOCIATED ROADWAY WORK ON BOLONGO BAY ROAD AND TURPENTINE RUN ROAD WERE DELAYED DUE TO ACQUISITION OF RIGHT OF WAY AND WERE NEVER CONSTRUCTED. PROJECT VI A30(001) CONSISTS OF CONSTRUCTION OF BRIDGE APPROACHES TO THE TURPENTINE RUN BRIDGE, INCLUDING REALIGNMENT OF APPROXIMATELY 600 OF BOLONGO BAY ROAD (ROUTE 30) AND REALIGNMENT OF APPROXIMATELY 1200 OF TURPENTINE RUN ROAD (ROUTE 32). PROPOSED IMPROVEMENTS INCLUDE, BUT ARE NOT LIMITED TO, UTILITY RELOCATIONS, SIGNAL INSTALLATION, DRAINAGE IMPROVEMENTS, MINOR BRIDGE REHABILITATION, AND ROADSIDE SAFETY IMPROVEMENTS.$9.6M
Mar 30, 2016Department of TransportationEASTERN FEDERAL LANDS HIGHWAY DIVISION237310IGF::OT::IGF PROJECT: VI 38(2) CONTRACT 1 THE PROJECT CONSISTS OF WIDENING AND REHABILITATING RAPHUNE HILL ROAD (ROUTE 38), AND CENTERLINE AND RACE TRACK ROADS (ROUTE 313) AT THE RAPHUNE HILL INTERSECTION. THE WORK INCLUDES ASPHALT PAVEMENT RECONSTRUCTION, AGGREGATE BASE, HOT ASPHALT CONCRETE PAVEMENT, CONCRETE SIDEWALK AND CURB AND GUTTER, DRAINAGE, UTILITY RELOCATION, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$2.0M

Want to win work like Island Roads Corporation?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.