Showing award actions 51–85 of 85 funded award actions, most recent first.

Contracts with positive obligations
14
Funded award actions shown
85
Obligations shown
$56M
Awarding agencies
2

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of July 20, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Aug 14, 2020National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0070541330LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E$300K
Jun 24, 2020National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$1.0M
May 27, 2020National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC20C0062334511DEEP ATMOSPHERE VENUS INVESTIGATION OF NOBLE GASES, CHEMISTRY, AND IMAGING PLUS (DAVINCI+) KINETX PHASE A$102K
Apr 29, 2020Department of DefenseW6QK ACC-RSA COSW9126019P0011541511SATCOM ANALYSIS TOOL$96K
Jan 14, 2020National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$160K
Dec 20, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0070541330LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E$500K
Oct 21, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0070541330LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E$500K
Sep 24, 2019Department of DefenseW6QK ACC-RSA COSW9126019P0011541511SATCOM ANALYSIS TOOL$11K
Sep 11, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0070541330LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E$175K
Aug 19, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$2.0M
Aug 5, 2019Department of DefenseW6QK ACC-RSA COSW9126019P0011541511SATCOM ANALYSIS TOOL$90K
Mar 28, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$1.5M
Feb 7, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0070541330LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E$500K
Feb 7, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$600K
Jan 2, 2019Department of DefenseNSWC DAHLGRENN0017819F7971541330SEAPORT NXG MINIMUM OBLIGATION TASK ORDER$500
Dec 17, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0070541330LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E$250K
Sep 5, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$1.0M
Jul 19, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$2.0M
May 1, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0070541330LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E$789K
Dec 14, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$1.5M
Sep 6, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$406K
Aug 16, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$1.1M
May 23, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$752K
Apr 12, 2017Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIVN6833517C0313541712RESEARCH AND DEVELOPMENT IGF::OT::IGF$125K
Apr 12, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$1.3M
Feb 8, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$750K
Feb 1, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$126K
Jan 4, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$204K
Dec 1, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$733K
Oct 28, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$57K
Sep 27, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$830K
Jul 11, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$1.1M
Mar 17, 2016National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG13FC02C334511THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.$1.0M
Mar 7, 2016National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG16FH51C541712IGF::OT::IGF DAVINCI NASA HAS SELECTED FIVE SCIENCE INVESTIGATIONS FOR REFINEMENT DURING THE NEXT YEAR AS A FIRST STEP IN CHOOSING ONE OR TWO MISSIONS FOR FLIGHT OPPORTUNITIES AS EARLY AS 2020. THE SUBMITTED PROPOSALS WOULD STUDY VENUS, NEAR-EARTH OBJECTS AND A VARIETY OF ASTEROIDS. DAVINCI - DEEP ATMOSPHERE VENUS INVESTIGATION OF NOBLES GASES CHEMISTRY AND IMAGING. DAVINCI WOULD STUDY THE CHEMICAL COMPOSITION OF VENUS' ATMOSPHERE DURING A 63-MINUTE DESCENT. IT WOULD ANSWER SCIENTIFIC QUESTIONS THAT HAVE BEEN CONSIDERED HIGH PRIORITIES FOR MANY YEARS, SUCH AS WHETHER THERE ARE VOLCANOES ACTIVE TODAY ON THE SURFACE OF VENUS AND HOW THE SURFACE INTERACTS WITH THE ATMOSPHERE OF THE PLANET. THE SELECTED INVESTIGATIONS HAVE THE POTENTIAL TO REVEAL MUCH ABOUT THE FORMATION OF OUR SOLAR SYSTEM AND ITS DYNAMIC PROCESSES, SAID JOHN GRUNSFELD, ASTRONAUT AND ASSOCIATE ADMINISTRATOR FOR NASA'S SCIENCE MISSION DIRECTORATE IN WASHINGTON. DYNAMIC AND EXCITING MISSIONS LIKE THESE HOLD PROMISE TO UNRAVEL THE MYSTERIES OF OUR SOLAR SYSTEM AND INSPIRE FUTURE GENERATIONS OF EXPLORERS. IT'S AN INCREDIBLE TIME FOR SCIENCE, AND NASA IS LEADING THE WAY. A GOAL IS UNDERSTOOD TO HAVE A BROAD SCOPE (E.G. DISCOVER WHETHER LIFE EXISTS ELSEWHERE IN THE UNIVERSE, DISCOVER HOW AND WHY THE EARTHS CLIMATE AND THE ENVIRONMENT ARE CHANGING), WHILE AN OBJECTIVE IS UNDERSTOOD AS A MORE NARROWLY FOCUSED PART OF A STRATEGY TO ACHIEVE A GOAL (E.G., IDENTIFY SPECIFIC CHEMICAL, MINERALOGICAL, OR MORPHOLOGICAL FEATURES ON MARS THAT PROVIDE EVIDENCE OF PAST OR PRESENT LIFE THERE; UNDERSTAND AND IMPROVE PREDICTIVE CAPABILITY FOR CHANGES IN THE OZONE LAYER, CLIMATE FORCING, AND AIR QUALITY ASSOCIATED WITH CHANGES IN ATMOSPHERIC COMPOSITION). PROPOSED INVESTIGATIONS MUST ACHIEVE THEIR PROPOSED OBJECTIVES; HOWEVER, THE INVESTIGATION MIGHT ONLY MAKE PROGRESS TOWARD A GOAL WITHOUT FULLY ACHIEVING IT.$79K
Dec 22, 2015Department of DefenseNIWC ATLANTIC0002541330IGF::OT::IGF THE PURPOSE SUPPORT IS TO PROVIDE PROGRAM MANAGEMENT (PM), DATA AND ASSET MANAGEMENT (DM/AM), MATERIAL PROCUREMENT (MP), MATERIAL FABRICATION (MF), MATERIAL INTEGRATION (MI), TESTING AND EVALUATION (T&E), AND LOGISTICS AND SUPPORT (L&S) TO MARCORSYSCOM (MCSC).$1.0M

Get Alerted Before Kinetx INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.