Federal Contractor Profile
Kinetx INC
$56M obligated·14 awards·2 agencies·4 NAICS
Federal Contracts
Showing award actions 51–85 of 85 funded award actions, most recent first.
- Contracts with positive obligations
- 14
- Funded award actions shown
- 85
- Obligations shown
- $56M
- Awarding agencies
- 2
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of July 20, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 14, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0070 | 541330 | LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E | $300K |
| Jun 24, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $1.0M |
| May 27, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC20C0062 | 334511 | DEEP ATMOSPHERE VENUS INVESTIGATION OF NOBLE GASES, CHEMISTRY, AND IMAGING PLUS (DAVINCI+) KINETX PHASE A | $102K |
| Apr 29, 2020 | Department of DefenseW6QK ACC-RSA COS | W9126019P0011 | 541511 | SATCOM ANALYSIS TOOL | $96K |
| Jan 14, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $160K |
| Dec 20, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0070 | 541330 | LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E | $500K |
| Oct 21, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0070 | 541330 | LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E | $500K |
| Sep 24, 2019 | Department of DefenseW6QK ACC-RSA COS | W9126019P0011 | 541511 | SATCOM ANALYSIS TOOL | $11K |
| Sep 11, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0070 | 541330 | LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E | $175K |
| Aug 19, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $2.0M |
| Aug 5, 2019 | Department of DefenseW6QK ACC-RSA COS | W9126019P0011 | 541511 | SATCOM ANALYSIS TOOL | $90K |
| Mar 28, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $1.5M |
| Feb 7, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0070 | 541330 | LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E | $500K |
| Feb 7, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $600K |
| Jan 2, 2019 | Department of DefenseNSWC DAHLGREN | N0017819F7971 | 541330 | SEAPORT NXG MINIMUM OBLIGATION TASK ORDER | $500 |
| Dec 17, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0070 | 541330 | LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E | $250K |
| Sep 5, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $1.0M |
| Jul 19, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $2.0M |
| May 1, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0070 | 541330 | LUCY FLIGHT DYNAMICS SYSTEMS NAVIGATIONAL PHASE B/C/D/E | $789K |
| Dec 14, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $1.5M |
| Sep 6, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $406K |
| Aug 16, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $1.1M |
| May 23, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $752K |
| Apr 12, 2017 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833517C0313 | 541712 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $125K |
| Apr 12, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $1.3M |
| Feb 8, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $750K |
| Feb 1, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $126K |
| Jan 4, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $204K |
| Dec 1, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $733K |
| Oct 28, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $57K |
| Sep 27, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $830K |
| Jul 11, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $1.1M |
| Mar 17, 2016 | National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTER | NNG13FC02C | 334511 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | $1.0M |
| Mar 7, 2016 | National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTER | NNG16FH51C | 541712 | IGF::OT::IGF DAVINCI NASA HAS SELECTED FIVE SCIENCE INVESTIGATIONS FOR REFINEMENT DURING THE NEXT YEAR AS A FIRST STEP IN CHOOSING ONE OR TWO MISSIONS FOR FLIGHT OPPORTUNITIES AS EARLY AS 2020. THE SUBMITTED PROPOSALS WOULD STUDY VENUS, NEAR-EARTH OBJECTS AND A VARIETY OF ASTEROIDS. DAVINCI - DEEP ATMOSPHERE VENUS INVESTIGATION OF NOBLES GASES CHEMISTRY AND IMAGING. DAVINCI WOULD STUDY THE CHEMICAL COMPOSITION OF VENUS' ATMOSPHERE DURING A 63-MINUTE DESCENT. IT WOULD ANSWER SCIENTIFIC QUESTIONS THAT HAVE BEEN CONSIDERED HIGH PRIORITIES FOR MANY YEARS, SUCH AS WHETHER THERE ARE VOLCANOES ACTIVE TODAY ON THE SURFACE OF VENUS AND HOW THE SURFACE INTERACTS WITH THE ATMOSPHERE OF THE PLANET. THE SELECTED INVESTIGATIONS HAVE THE POTENTIAL TO REVEAL MUCH ABOUT THE FORMATION OF OUR SOLAR SYSTEM AND ITS DYNAMIC PROCESSES, SAID JOHN GRUNSFELD, ASTRONAUT AND ASSOCIATE ADMINISTRATOR FOR NASA'S SCIENCE MISSION DIRECTORATE IN WASHINGTON. DYNAMIC AND EXCITING MISSIONS LIKE THESE HOLD PROMISE TO UNRAVEL THE MYSTERIES OF OUR SOLAR SYSTEM AND INSPIRE FUTURE GENERATIONS OF EXPLORERS. IT'S AN INCREDIBLE TIME FOR SCIENCE, AND NASA IS LEADING THE WAY. A GOAL IS UNDERSTOOD TO HAVE A BROAD SCOPE (E.G. DISCOVER WHETHER LIFE EXISTS ELSEWHERE IN THE UNIVERSE, DISCOVER HOW AND WHY THE EARTHS CLIMATE AND THE ENVIRONMENT ARE CHANGING), WHILE AN OBJECTIVE IS UNDERSTOOD AS A MORE NARROWLY FOCUSED PART OF A STRATEGY TO ACHIEVE A GOAL (E.G., IDENTIFY SPECIFIC CHEMICAL, MINERALOGICAL, OR MORPHOLOGICAL FEATURES ON MARS THAT PROVIDE EVIDENCE OF PAST OR PRESENT LIFE THERE; UNDERSTAND AND IMPROVE PREDICTIVE CAPABILITY FOR CHANGES IN THE OZONE LAYER, CLIMATE FORCING, AND AIR QUALITY ASSOCIATED WITH CHANGES IN ATMOSPHERIC COMPOSITION). PROPOSED INVESTIGATIONS MUST ACHIEVE THEIR PROPOSED OBJECTIVES; HOWEVER, THE INVESTIGATION MIGHT ONLY MAKE PROGRESS TOWARD A GOAL WITHOUT FULLY ACHIEVING IT. | $79K |
| Dec 22, 2015 | Department of DefenseNIWC ATLANTIC | 0002 | 541330 | IGF::OT::IGF THE PURPOSE SUPPORT IS TO PROVIDE PROGRAM MANAGEMENT (PM), DATA AND ASSET MANAGEMENT (DM/AM), MATERIAL PROCUREMENT (MP), MATERIAL FABRICATION (MF), MATERIAL INTEGRATION (MI), TESTING AND EVALUATION (T&E), AND LOGISTICS AND SUPPORT (L&S) TO MARCORSYSCOM (MCSC). | $1.0M |
Get Alerted Before Kinetx INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free