Federal Contractor Profile
Koman Sustainable Solutions, LLC
$124M obligated·131 awards·3 agencies·10 NAICS
Federal Contracts
Showing contracts 51–100 of 155 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 7, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706025F0009 | 238220 | THE CONTRACTOR SHALL PROVIDE ALL NECESSARY WORK NEEDED TO MEET CURRENT MISSION REQUIREMENTS AS OUTLINED IN THE STATEMENT OF WORK (SOW). | $53K |
| Nov 5, 2024 | Department of DefenseW071 ENDIST OMAHA | W9128F23C0044 | 237310 | DESIGN AND CONSTRUCT REPAIR KENNEY GATE | $36K |
| Sep 30, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0155 | 238220 | PKB - URGENT HIGH VOLTAGE SWITCH REPAIR B60 JBAB. | $149K |
| Sep 27, 2024 | Department of DefenseFA3029 71 FTW CVC | FA302924F0007 | 236220 | RENOVATE ROOMS 141,142, AND RESTROOMS IN FACILITY 415 (BASE EXCHANGE) IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). | $290K |
| Sep 26, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0147 | 238220 | PKB - THE PURPOSE OF THIS REQUIREMENT IS TO INSTALL NEW WELDED PIPE, FITTINGS, VALVES, AND FLANGES TO CONNECT THE INCOMING DOMESTIC WATER LINE TO THE BUILDING DOMESTIC WATER SUPPLY IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $98K |
| Sep 26, 2024 | Department of DefenseW6QM MICC-FT GORDON | W9124924C0016 | 238220 | 810043G-2P BLDG. 900 REPLACE COOLING | $2.4M |
| Sep 24, 2024 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2023C0104 | 236220 | LYJO 290111 & 316068 - REHABILITATE TEXAS WHITE HOUSE & REHABILITATE HANGAR BUILDING, LYNDON B. JOHNSON NATIONAL HISTORICAL PARK | $14K |
| Sep 17, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0130 | 238220 | PKB - B168 EMERGENCY REPAIR WATER LINE PROVIDE ALL NECESSARY WORK NEEDED TO MEET CURRENT MISSION REQUIREMENTS AS OUTLINED IN THIS STATEMENT OF WORK (SOW). | $35K |
| Sep 11, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0116 | 238220 | PKB-THE PROCUREMENT REQUIRES THE REPLACEMENT OF EXISTING 12-INCH AND 8-INCH DOMESTIC WATER LINES AND VALVES ON THE WEST SIDE OF B168 WITH C900 PIPING, IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $640K |
| Sep 10, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0113 | 238220 | THE PURPOSE OF THIS REQUIREMENT IS TO PROVIDE ALL LABOR AND EQUIPMENT TO ACCOMPLISH THE REPAIR AND REPLACEMENT OF THE HIGH VOLTAGE SWITCH AT B123 JOINT BASE ANACOSTIA-BOLLING IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $225K |
| Sep 9, 2024 | Department of DefenseW6QM MICC-FT GORDON | W9124923C0026 | 238990 | DE05377-2P BF001 REPAIR BARTON FIELD TRA | $3.2M |
| Sep 9, 2024 | Department of DefenseW071 ENDIST OMAHA | W9128F23C0044 | 237310 | DESIGN AND CONSTRUCT REPAIR KENNEY GATE | $42K |
| Sep 6, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0112 | 238220 | PKB - B3617 INSTALL CHILLER AND REPLACE PUMPS AND HVU | $820K |
| Sep 6, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0111 | 238220 | PKB - THE PROCUREMENT REQUIRES ALL NECESSARY WORK NEEDED TO MEET CURRENT MISSION REQUIREMENTS IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). CONTRACTOR TO PERFORM DDC FIELD PANEL FAST FORWARD PROTOCOL AND REPLACE MAIN BUILDING PUMPS. | $158K |
| Sep 6, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0109 | 238220 | PKB-THE DEMO AND REPLACEMENT OF THREE (3) ROOFTOP AIR HANDLING UNITS FROM THE SITE AT B418 IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $283K |
| Sep 6, 2024 | Department of DefenseW074 ENDIST MOBILE | W9127822C0036 | 531120 | MACDILL AIR FORCE BASE MISO IV MODULAR TRAILER LEASE | $1.8M |
| Sep 4, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0105 | 238220 | PKB - CONTRACTOR SHALL REMOVE AND REPLACE FOUR (4) AIR HANDLING UNITS (AHUS) ON THE FIRST FLOOR OF BUILDING 399 IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $563K |
| Aug 28, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0099 | 238220 | PROVIDE ALL NECESSARY WORK NEEDED TO RENOVATE THE FACILITY TO MEET CURRENT MISSION REQUIREMENTS AS OUTLINED IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). | $1.1M |
| Aug 27, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0092 | 238220 | PKB - THE PROCUREMENT REQUIRES ALL NECESSARY WORK NEEDED TO MEET CURRENT MISSION REQUIREMENTS IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). THE PURPOSE OF THIS PROJECT IS TO REPAIR THE SEWER LINE THAT IS CAUSING FLOODING IN ROOMS 182 AND 182A. | $38K |
| Jul 23, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0071 | 238220 | PKB-THE PROCUREMENT REQUIRES THE INSTALLATION OF A LIGHTENING PROTECTION SYSTEM AT B16 AND B5 IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $66K |
| Jul 15, 2024 | Department of DefenseFA3020 82 CONS LGC | FA302024F0135 | 236220 | DESIGN-BUILD TO REPAIR BRICK SPALLS, REPAIR EXTERIOR ARCHITECTURAL CONCRETE FACADE AND APPLY TEXTURE SEAL COATING, REPAIR STONE COPING PARAPET AND REMOVE EXTERIOR SEALANT/CAULK THEN REPLACE WITH NEW SEALANT/CAULKING. | $1.1M |
| Jul 15, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024C0008 | 238220 | PKB - PROVIDE ALL NECESSARY WORK NEEDED TO RENOVATE THE FACILITY TO MEET CURRENT MISSION REQUIREMENTS, TO COMPLETE THE REPLACEMENT OF THE HVAC SYSTEM B417 JBAB AS OUTLINED IN THE STATEMENT OF WORK (SOW) | $2.9M |
| Jul 3, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0068 | 238220 | PKB-REPLACEMENT OF THE COOLING TOWER DRIVE MOTORS AT B16S CT1 AND CT2, REPLACEMENT OF COOLING TOWER POWERTRAIN COMPONENTS, UPGRADE INTEGRATED AUTOMATION, INSTALL NEW BAS AND TROUBLESHOOT CHILLERS IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $368K |
| Jun 25, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0061 | 238220 | PKB - THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL AND EQUIPMENT NECESSARY TO DEMO TWENTY-TWO (22) CLASSROOM VENTILATOR UNITS AND REMOVE THEM FROM THE SITE IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW) DATED 8 MARCH 2024. | $821K |
| Jun 6, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0059 | 238220 | PKB - THIS TASK ORDER IS TO PROVIDE ALL LABOR AND EQUIPMENT TO ACCOMPLISH THE REPAIR AND REPLACEMENT OF THE HIGH VOLTAGE SWITCH AT B54 JOINT BASE ANACOSTIA-BOLLING IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW) | $209K |
| May 23, 2024 | Department of DefenseFA4419 97 CONF CC | FA441924F0074 | 236220 | B18 ROOF RENOVATION AT ALTUS AFB OK. THIS PROJECT CONSISTS OF REPLACING THE SINGLE-PLY ROOF SYSTEM WITH A NEW FULLY ADHERED ETHYLENE - PROPYLENE - DIENE - MONOMER (EPDM) SINGLE-PLY SYSTEM WITH A NO DOLLAR LIMIT (NDL) TWENTY (20) YEAR WARRANTY. | $583K |
| May 10, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0053 | 238220 | B168 JBAB - REPLACE FLOORING AND RF SHIELDING ROOM 123 | $10K |
| May 8, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0055 | 238220 | PKB-THE PROCUREMENT REQUIRES A TEMPORARY RENTAL CHILLER, WITH A MINIMUM OF 70 TONS OF COOLING CAPACITY, TO PROVIDE COOLING TO B55 UNTIL THE NEW CHILLER IS INSTALLED AND OPERATIONAL IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $113K |
| Apr 18, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460022F0131 | 236220 | ISOLATE AND ABANDON TWO (2) CLOSED LOOP GEOTHERMAL GROUND WELL SYSTEM AND A FULL-DEPTH REPLACEMENT OF 95,000 SQ. FT. PARKING LOT THAT SITS ABOVE ONE OF THE GEOTHERMAL GROUND SYSTEMS. | $520K |
| Mar 22, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706023F0113 | 238220 | B93 HVAC REPAIR ON JOINT BASE ANACOSTIA-BOLLING | $152K |
| Mar 20, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0040 | 238220 | PKB - B72 INSTALL EMERGENCY TEMPORARY CHILLER AND INVESTIGATE HVAC CONTROLS | $316K |
| Mar 14, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0039 | 238220 | PKB - JBAB B3617 EMERGENCY REPLACE BOILER | $69K |
| Mar 14, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0037 | 238220 | PKB - B54 PROVIDE AND INSTALL TEMPORARY CHILLER | $62K |
| Mar 14, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0034 | 238220 | B365 REPAIR AND UNCLOG MANHOLE | $46K |
| Mar 5, 2024 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2023C0104 | 236220 | LYJO 290111 & 316068 - REHABILITATE TEXAS WHITE HOUSE & REHABILITATE HANGAR BUILDING, LYNDON B. JOHNSON NATIONAL HISTORICAL PARK | $378 |
| Feb 20, 2024 | Department of DefenseFA4419 97 CONF CC | FA441924F0057 | 236220 | BUILDING 225 ROOF REPLACEMENT. | $395K |
| Feb 12, 2024 | Department of DefenseFA4801 49 CONS PK | FA480124P0019 | 337214 | MODULAR STANDALONE CONFERENCE ROOM WITH 2 OFFICES AND WHITEBOARDS | $111K |
| Feb 6, 2024 | Department of DefenseW074 ENDIST MOBILE | W9127822C0036 | 531120 | MACDILL AIR FORCE BASE MISO IV MODULAR TRAILER LEASE | $51K |
| Feb 2, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0029 | 238220 | B168 REPAIR LIFT STATION PUMP | $100K |
| Feb 2, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0014 | 238220 | B20 EMERGENCY WATERLINE REPAIR ON JBAB | $144K |
| Jan 25, 2024 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0025 | 238220 | B417 FIRE ALARM, MOLD, WATER DAMAGE, PAINT AND FLOORING | $393K |
| Jan 22, 2024 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2023C0104 | 236220 | LYJO 290111 & 316068 - REHABILITATE TEXAS WHITE HOUSE & REHABILITATE HANGAR BUILDING, LYNDON B. JOHNSON NATIONAL HISTORICAL PARK | $5.5M |
| Dec 20, 2023 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0019 | 238220 | INSTALL HIGH VOLTAGE LINE AND PANEL IN BILLY MITCHELL ESTATES, JBAB | $926K |
| Dec 5, 2023 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0014 | 238220 | B20 EMERGENCY WATERLINE REPAIR ON JBAB | $167K |
| Dec 4, 2023 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0012 | 238220 | REPAIR WATERLINE B29 JBAB | $80K |
| Dec 4, 2023 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0013 | 238220 | INSTALL SERVER ROOM HVAC TRANSFORMER FOR B168'S ROOM 123 AT JBAB | $17K |
| Dec 1, 2023 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0011 | 238220 | INSTALL OF WATER HEATING BYPASS B3619, JBAB | $148K |
| Nov 20, 2023 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0008 | 238220 | EMERGENCY WATERLINE REPAIR B18 JBAB | $49K |
| Nov 2, 2023 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C24F00000007 | 236210 | LAREDO REPAIRS | $961K |
| Oct 2, 2023 | Department of DefenseFA7060 11TH CONTRACTING SQ PK | FA706024F0002 | 236220 | B370 AIR COOLED CHILLER | $346K |
Get Alerted Before Koman Sustainable Solutions, LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free