Showing award actions 51–100 of 234 funded award actions, most recent first.

Contracts with positive obligations
86
Funded award actions shown
234
Obligations shown
$1.6B
Awarding agencies
4

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of October 28, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Sep 17, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC019D0012336414SPACEFLIGHT DEMONSTRATION OF A POWER AND PROPULSION ELEMENT CONTRACT$44M
Sep 12, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC24CA053541715EDGE SPACECRAFT CONCEPT STUDY PHASE A$300K
Aug 22, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC024F0064336414PPE - TTO 029$879K
Aug 22, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$4.9M
Aug 20, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC24PC139541715ACCESS TO SPACE (ATS) TRADE STUDIES$250K
Jul 26, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$1.0M
Jul 25, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNM16AA29C541712IGF::OT::IGF TIPPING POINT TECHNOLOGIES - DRAGONFLY: ON-ORBIT ROBOTIC INSTALLATION AND RECONFIGURATION OF LARGE SOLID RADIO FREQUENCY REFLECTORS.$100K
Jul 19, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$206K
Jul 10, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$206K
Jun 13, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$3.5M
Jun 6, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC024F0043336414PPE - TTO 028$175K
May 16, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$69K
May 16, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$957K
May 13, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC019D0012336414SPACEFLIGHT DEMONSTRATION OF A POWER AND PROPULSION ELEMENT CONTRACT$42M
Apr 25, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$5.5M
Apr 3, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$5.5M
Mar 13, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$1.3M
Mar 13, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$61K
Mar 6, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC019D0012336414SPACEFLIGHT DEMONSTRATION OF A POWER AND PROPULSION ELEMENT CONTRACT$42M
Mar 4, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC024F0005336414PPE - TTO 024$63K
Feb 26, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC024F0027336414PPE - TTO 026$446K
Feb 21, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC024F0025336414PPE - TTO 027$391K
Jan 24, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNM16AA29C541712IGF::OT::IGF TIPPING POINT TECHNOLOGIES - DRAGONFLY: ON-ORBIT ROBOTIC INSTALLATION AND RECONFIGURATION OF LARGE SOLID RADIO FREQUENCY REFLECTORS.$3.5M
Jan 5, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNM16AA29C541712IGF::OT::IGF TIPPING POINT TECHNOLOGIES - DRAGONFLY: ON-ORBIT ROBOTIC INSTALLATION AND RECONFIGURATION OF LARGE SOLID RADIO FREQUENCY REFLECTORS.$862K
Jan 3, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$1.4M
Dec 22, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC019D0012336414SPACEFLIGHT DEMONSTRATION OF A POWER AND PROPULSION ELEMENT CONTRACT$39M
Dec 20, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0116336414PPE - TTO 023$484K
Dec 12, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC024F0012336414PPE - TTO 025$388K
Nov 8, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC024F0005336414PPE - TTO 024$328K
Nov 7, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC019D0012336414SPACEFLIGHT DEMONSTRATION OF A POWER AND PROPULSION ELEMENT CONTRACT$49M
Sep 27, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0120336414PPE - TTO 021: PPE 825L XENON TANK LINER PHASED ARRAY ULTRASONIC TESTING (PAUT) NDE INSPECTION$173K
Sep 26, 2023Department of DefenseFA8819 SPECIAL PROGRAMS DIR SMC SPFA881419F0001481212HOSTED PAYLOAD SOLUTION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION'S TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION PAYLOAD$2.6M
Sep 21, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0113336414PPE - TTO 022$328K
Sep 21, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0116336414PPE - TTO 023$173K
Sep 19, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$4.0M
Sep 18, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC019D0012336414SPACEFLIGHT DEMONSTRATION OF A POWER AND PROPULSION ELEMENT CONTRACT$59M
Jul 28, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0083336414PPE TTO 020 - XE TANK NDE TIM$168K
Jul 27, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC019D0012336414SPACEFLIGHT DEMONSTRATION OF A POWER AND PROPULSION ELEMENT CONTRACT$61M
Jul 14, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0079336414TTO 019 - NDE OF BIPROP TANK (PPE)$430K
Jun 15, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0067336414TO 016$130K
Jun 14, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$120K
May 31, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0064336414PPE - TTO 015$377K
May 9, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA055541330GEOXO SPACE CRAFT PHASE A STUDY$117K
Apr 12, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0051336414PPE - TTO 016$168K
Apr 7, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0043336414PPE TTO 013$430K
Apr 7, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0044336414PPE TTO 012$168K
Mar 31, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0029336414TTO 001, PPE CONTRACT$377K
Mar 31, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC023F0030336414TTO 14, PPE CONTRACT$252K
Mar 30, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER80GRC019D0012336414SPACEFLIGHT DEMONSTRATION OF A POWER AND PROPULSION ELEMENT CONTRACT$10M
Feb 7, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17FB00C336414THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.$191K

Get Alerted Before Lanteris Space LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free