Skip to content
Home/Contractors/Liberty Electric INC

Federal Contractor Profile

Liberty Electric INC

Federal contracting record: $8.9M obligated across 40 awards from 4 agencies, FY 2016–2027.

$8.9M
Total Obligated
40
Award Records
4
Agencies Served
9
NAICS Codes

Liberty Electric INC at a glance

Liberty Electric INC, based in Missoula, MT, has received $8.9M in federal contract obligations across 40 awards from 4 agencies.

Its largest customer is the Department of Defense, at 80% of obligations, followed by Department of Health and Human Services (11%) and Department of Agriculture (8%).

Its largest line of work is NAICS 238210 (electrical contractors and other wiring installation contractors): $7.4M across 27 awards.

In FY2025 it received $581K, up 14% from FY2024.

3 of its contracts are scheduled to end soon; the next with the Department of Defense ends in November 2026.

Company Profile

Parent UEI (Unique Entity Identifier)

DHMLQJL9Z533

CAGE Code

0LYU7

Address

9660 SUMMIT DR, MISSOULA, MT, 598089440

First Federal Award

Dec 3, 2015

Most Recent Award

Oct 23, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 238210

    ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS

    27 awards

    $7.4M
  • 236220

    COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

    1 awards

    $665K
  • 237130

    POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION

    1 awards

    $384K
  • 238220

    PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS

    2 awards

    $186K
  • 561621

    SECURITY SYSTEMS SERVICES (EXCEPT LOCKSMITHS)

    4 awards

    $101K
  • 238290

    OTHER BUILDING EQUIPMENT CONTRACTORS

    2 awards

    $88K
  • 332311

    PREFABRICATED METAL BUILDING AND COMPONENT MANUFACTURING

    1 awards

    $75K
  • 115310

    SUPPORT ACTIVITIES FOR FORESTRY

    1 awards

    $14K
  • 335313

    SWITCHGEAR AND SWITCHBOARD APPARATUS MANUFACTURING

    1 awards

    $13K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Jun 25, 2026Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH OLAO238210UPS REPLACEMENT - RIELLO MASTER HP 250KVA SYSTEM, BLDG. 15 AT RML$164K
Jun 15, 2026Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH OLAO238210UPS ELECTRICAL WORK AT RML, BUILDING 6$144K
Jun 12, 2026Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9236220GAOA LCIC LIGHTING UPGRADE (RE-SOLICITATION)$665K
Apr 15, 2026Department of DefenseFA4626 341 CONS LGC238290LIGHTNING PROTECTION$55K
Feb 25, 2026Department of DefenseFA4626 341 CONS LGC237130REMOVAL AND REPLACEMENT OF ALL STREET LIGHTS, POLES, AND CONCRETE BASES, INCLUDING NEW CIRCUITS, CONDUITS, CONDUCTORS, DISCONNECTS ON PEDESTALS, AND CONNECTIONS TO EXISTING TRANSFORMERS. CONDUITS SHALL BE INSTALLED BY DIRECTIONAL DRILLING.$384K
Sep 23, 2025Department of Health and Human ServicesNIH A E CONSTRUCTION238210PROVIDE FUNDING FOR ELECTRICAL SYSTEM EMERGENCY REPAIRS IN SUPPORT OF RESEARCH FACILITIES AT THE RML CAMPUS.$100K
Aug 11, 2025Department of DefenseFA4626 341 CONS LGC238210THIS PURCHASE IS FOR THE ACCEPTANCE TESTING OF LIGHTNING PROTECTION SYSTEM (LPS) FOR BUILDING 1825 AT MALMSTROM AFB. THE ACCEPTANCE TESTING WILL INCLUDE THE FOLLOWING TASKS SPECIFIED IN THE SOW.$838
Jul 30, 2025Department of DefenseFA4626 341 CONS LGC238210WING CONFERENCE ROOM CONDUIT INSTALL$15K
May 8, 2025Department of DefenseFA4626 341 CONS LGC238210PROVIDE 208V 3 PHASE POWER TO THE LAGOONS AT 11 MISSILE ALERT FACILITIES. INSTALLATION OF ELECTRICAL CONDUIT, CONDUCTORS, SERVICE PANELS WITH MAIN BREAKERS, CIRCUIT BREAKERS, AND OUTLETS FROM SPECIFIED LOCATIONS TO THE LAGOONS.$386K
Apr 23, 2025Department of DefenseFA4626 341 CONS LGC238210THIS PURCHASE IS FOR THE ACCEPTANCE TESTING OF LIGHTNING PROTECTION SYSTEM (LPS) FOR BUILDING 1825 AT MALMSTROM AFB. THE ACCEPTANCE TESTING WILL INCLUDE THE FOLLOWING TASKS SPECIFIED IN THE SOW.$11K
Nov 14, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210ORF PROJECT NO.: C200377 THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE ELECTRICAL CONSTRUCTION TO PROVIDE "BLDG. J TEMPORARY POWER FOR CONSTRUCTION" AT THE NIH/RML CAMPUS, HAMILTON, MT. (SEE THE SCHEDULE)$9K
Nov 14, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE ELECTRICAL REPAIRS, RENOVATIONS, AND UPGRADES IN SUPPORT OF THE NIH/RML CAMPUS, HAMILTON, MT. (SEE THE SCHEDULE)$50K
Nov 14, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210ORF PROJECT NO. C200615 THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE PARKING LOT LIGHTING IN THE NEW TEMPORARY NW PARKING LOT. (SEE THE SCHEDULE)$10K
Sep 23, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210ORF PROJECT NO. C200615 THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE PARKING LOT LIGHTING IN THE NEW TEMPORARY NW PARKING LOT. (SEE THE SCHEDULE)$69K
Aug 23, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PERFORM THE "ANNUAL LIGHTNING PROTECTION CERTIFICATION, MAINTENANCE AND REPAIR AT THE NIH/RML CAMPUS, HAMILTON, MT. (SEE THE SCHEDULE)$83K
Aug 7, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE, INSTALL, TEST AND COMMISSION BUILDING 26 BOILER PLANT MAIN AREA DIMMABLE LIGHTING CONTROL - WIRED OPTION AND BUILDING 28 CHILLER PLANT LIGHT FIXTURE REPLACEMENT AT THE NIH/RML CAMPUS, HAMIL$24K
Aug 6, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210ORF PROJECT NO.: C200377 THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE ELECTRICAL CONSTRUCTION TO PROVIDE "BLDG. J TEMPORARY POWER FOR CONSTRUCTION" AT THE NIH/RML CAMPUS, HAMILTON, MT. (SEE THE SCHEDULE)$135K
Jul 1, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE ON CALL ELECTRICAL CONSTRUCTION RENOVATIONS, ALTERATIONS AND REPAIRS AT THE NIH/RML CAMPUS. (SEE THE SCHEDULE)$50K
May 17, 2024Department of DefenseFA4626 341 CONS LGC238210INSTALLATION AND TESTING OF FIBEROPTIC SECRET INTERNET PROTOCOL ROUTER NETWORK LINES AT MALMSTROM AIR FORCE BASE$4K
Apr 11, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE THE ELECTRICAL UPGRADES/REPLACEMENTS IN BLDG. 26, BOILER PLANT AT THE NIN/RML CAMPUS, HAMILTON, MT. (SEE THE SCHEDULE)$19K
Feb 20, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION238210THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PERFORM THE "ANNUAL LIGHTNING PROTECTION CERTIFICATION, MAINTENANCE AND REPAIR AT THE NIH/RML CAMPUS, HAMILTON, MT. (SEE THE SCHEDULE)$125K
Sep 25, 2023Department of the InteriorFWS, CONSTRUCTION A/E TEAM 1238210MT-BLNWR-ELC&LIGHTING SYSTEM$3K
Sep 21, 2023Department of DefenseW7NK USPFO ACTIVITY MTANG 120238210REPLACEMENT OF SERVICE ENTRANCE SWITCH GEAR. PROJECT JKSE232405$195K
Jan 31, 2023Department of DefenseFA4626 341 CONS LGC561621REPAIR OF FIRE DETECTION AND ALARM SYSTEMS.$38K
Sep 6, 2022Department of the InteriorFWS PACIFIC REGIONAL OFFICE238210MT-BLNWR-ELC&LIGHTING SYSTEM$3K

Contracts expiring soon

Liberty Electric INC contracts whose period of performance ends soonest — each one a likely recompete.

All contracts expiring soon →

Want to win work like Liberty Electric INC?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.