Federal Contracts
Showing award actions 101–150 of 288 funded award actions, most recent first.
- Contracts with positive obligations
- 290
- Funded award actions shown
- 288
- Obligations shown
- $75M
- Awarding agencies
- 1
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of February 8, 2021. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 15, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0038 | 236220 | 31 BLDS AT NFH | $138K |
| Nov 14, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0032 | 236220 | B-7051 REPLACE FLOORING, B-9205 INSULATE PIPES | $214K |
| Nov 14, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0034 | 236220 | B-7001 INSTALL FIBER COMS, HMMU REPAIR RANGE ROADS | $219K |
| Nov 14, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0035 | 236220 | 28000 INSTALL ELECTRICAL OUTLETS 41007 BLOCK ENTRY 9214 REPAIR SEWER LINE 15060 INSTALL POWER DROPS 9573 REPAIR SLAB LEAK | $219K |
| Nov 13, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0029 | 236220 | REPAIR AND SEALING ROOF AT B-89010 | $826K |
| Nov 8, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0028 | 236220 | BROOKHAVEN REPAIR POWER CENTER 5 | $49K |
| Nov 6, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0027 | 236220 | B-2804 INSTALL RAISED FLOOR | $219K |
| Nov 1, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0023 | 236220 | B-39009 REPLACE/REPAIR ROOF | $178K |
| Oct 30, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0021 | 236220 | B-12022 REPAIR TO OP STANDARDS. POP 210 DAYS | $388K |
| Oct 29, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0022 | 236220 | B-39043 REPAIR CEP COOLING TOWER, B-10018 ARSON REMEDIATION, B-23001 RELOCATE BUS STOP SHELTERS, B-5764 REPAIR FOUNDATION LEAK | $183K |
| Oct 25, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0018 | 236220 | B-33010 INSTALL GRAVEL PARKING, B-18015 STAIRWELL REPAIR, B-325 REPLACE WIRING, B-92074 REPLACE RUSTED DOOR AND FRAME, B-4616 CONSTRUCT SOUTH WEST AWNING AT FORT HOOD. | $219K |
| Oct 23, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0017 | 236220 | THE PURPOSE OF THIS PROJECT IS TO REPAIR AREA DRAINS AT B-9411 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 210 CALENDAR DAYS. BEGINNING 23 OCTOBER 2019 THROUGH 20 MAY 2020. | $221K |
| Oct 22, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0007 | 236220 | B-33000 REPLACE SEATING AND FLOORING. POP 210 DAYS | $315K |
| Oct 21, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G20F0005 | 236220 | INSULATE CHILLED WATER LINES AT FORT HOOD, TX. | $684K |
| Sep 30, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0238 | 236220 | B-22038 INSTALL DOOR OPENERS, B-9001 REPLACE CARPET, 113TH INSTALL OUTDOOR WATER FOUNTAIN, B-23020 PAINT EXTERIOR, B-89010 DEMO EXHAUST SYSTEM AT FT HOOD JOC. POP 210 DAYS, 30SEP19 - 27APR20. | $221K |
| Sep 30, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0240 | 236220 | B-3202 INSTALL OUTLETS, B-36000 REPAIR SIDEWALKS AT FT HOOD. POP 210 DAYS, FROM 30SEP19 TO 27APR20. | $206K |
| Sep 29, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0237 | 236220 | B-9560 MOLD REMEDIATION, B-9553 RUNWAY BEAM REPLACEMENT, B-49020 PATCH AND PAINT, B-22041 INSTALL INSULATED STRUCTURES AT FORT HOOD. POP IS 210 DAYS FROM 29-SEP-29 THROUGH 26-APR-20. | $221K |
| Sep 29, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0236 | 236220 | B-36000 REPAINT 2ND FLOOR ACS, B-5782 INSTALL STEEL DOOR, B-90094 INSTALL AIR DRYER AT FORT HOOD. POP IS 210 DAYS FROM 29-SEP-19 THROUGH 26-APR-20. | $108K |
| Sep 29, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0233 | 236220 | B-19030 INSTALL IDS AND CARD SWIPE AT FORT HOOD. POP IS 210 FROM 29-SEP-19 THROUGH 26-APR-20 | $100K |
| Sep 29, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0235 | 236220 | B-91012 CONSTRUCT WALLS AT FORT HOOD. POP IS 210 DAYS FROM 29-SEP-19 THROUGH 26-APR-20. | $121K |
| Sep 27, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0225 | 236220 | JMMU, REPAIR TRENCH | $975K |
| Sep 27, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0311 | 236220 | DEMOLITION AND RECONSTRUCTION OF THE EXISTING NORTH AND SOUTH TRENCHES OF FORT HOODS CRITTENBERGER MULTI-PURPOSE RANGE COMPLEX (CMPRC). NEW SUBSURFACE DRAINAGE SYSTEM SHALL BE INSTALLED IN BOTH TRENCHES. | $998K |
| Sep 27, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0276 | 236220 | CLABBER CREEK RECONSTRUCT TRENCH AT FORT HOOD, TX. | $975K |
| Sep 26, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F6139 | 236220 | THE PURPOSE OF THIS PROJECT IS TO RENOVATE BUILDING AT B-739 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 210 CALENDAR DAYS. BEGINNING 25 SEPTEMBER 2019 THROUGH 22 APRIL 2020. | $406K |
| Sep 25, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F6138 | 236220 | RENOVATE BUILDING AT B-730 FOR FORT HOOD. POP IS FROM 25SEP19 THROUGH 23JAN20. | $180K |
| Sep 24, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F6135 | 236220 | FORT HOOD HVAC AND ELECTRICAL | $807K |
| Sep 24, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0223 | 236220 | CORRECT DRAINAGE AT B-52024, REPLACE GREASE TRAP AT B-90145, AND INCREASE HVAC AT B-4619 FOR FORT HOOD. POP IS FROM 24SEP19 THROUGH 21APR20 | $247K |
| Sep 23, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0392 | 236220 | 91044 REPLACE UNISEX DIVIDERS 5757 INSTALL HVAC 33012 REPAIR JANITOR CLOSET 11010 CRANE REPLACEMENT 56000 NFH TENTS REPLACE LINERS | $499K |
| Sep 20, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0387 | 236220 | REPLACE WATER FOUNTAINS AT B-194, REPLACE BEAMS AT B-1975, REPAIR GROUND SCALE AT B-90147, INSTALL CONDUIT AT B-56507,&REPAIR ROOMS AT 39000BLK AT FORT HOOD. POP IS FROM 20SEP19 THROUGH 17APR20. | $114K |
| Sep 20, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0388 | 236220 | B-41000 ROOF REPLACEMENT. INSTALL MEMBRANE ROOF. DURATION IS FROM 20 SEP 19 - 17 FEB 20 | $250K |
| Sep 19, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0382 | 236220 | INSTALL CONCRETE PADS AT B-91027, INSTALL SUMP PUMP AT B-36000, REMEDIATE MOLD AT B-194, RENOVATE BUILDING AT B-90075,&REPAIR DRYWALL AT B-31014 FOR FT. HOOD. POP IS FROM 19 SEP 19 THROUGH 16 APR 20. | $169K |
| Sep 19, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0383 | 236220 | 29000 BLK REPAIR ROOMS - PERFORM VARIOUS REPAIRS TO THE BARRACKS ROOMS. DURATION IS FROM 19 SEP 19 - 16 APR 20. | $499K |
| Sep 19, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0381 | 236220 | B-12020 REPAIR BUILIDNG TO OP STANDARDS. WORK DURATION IS FROM 19 SEP 19 - 16 APR 20 | $424K |
| Sep 19, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0385 | 236220 | B-35040 INSTALL OVERHANG CANOPY TO PROTECT ARMY EQUIPMENT. DURATION IS FROM 19 SEP 19 THRU 16 APR 20 | $374K |
| Sep 18, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0377 | 236220 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT FENCE AND CANOPY AT B-40054 FOR FT HOOD, TEXAS. POP IS 210 CALENDAR DAYS, 17 SEP 19 THROUGH 14 APR 20. | $499K |
| Sep 18, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0378 | 236220 | THE PURPOSE OF THIS PROJECT IS TO RENOVATE BLDG AT B-2200 FOR FT HOOD, TEXAS. POP IS 210 CALENDAR DAYS, 18 SEP 19 THROUGH 15 APR 20. | $500K |
| Sep 12, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0369 | 236220 | THE PURPOSE OF THIS PROJECT IS TO INSTALL BLACKOUT BLINDS AT B-1001, RELOCATE SCREENS AT B-320, REMEDIATE MOLD AT B-27013, INSTALL TRAFFIC SIGNS AT B-5793, RENOVATE BLDG AT B-2201, FT HOOD, TEXAS. POP IS 120 CALENDAR DAYS, 12 SEP 19 THROUGH 9 APR 20 | $287K |
| Sep 6, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0323 | 236220 | THE PURPOSE OF THIS PROJECT IS TO MODIFY BAY AT B-56357 AND 56504 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 210 CALENDAR DAYS. BEGINNING 6 SEPTEMBER 2019 THROUGH 3 APRIL 2020. | $423K |
| Sep 4, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0363 | 236220 | IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE 6 WATER FOUNTAINS AT B-56505&REPAIR WATER LEAK AT B-56616 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 210 CALENDAR DAYS. BEGINNING 4 SEPTEMBER 2019 THROUGH 1 APRIL 2020. | $174K |
| Aug 28, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0353 | 236220 | REPAIR FUEL WATER SEPERATOR AT B-4007, REMEDIATE MOLD RM234 AT B-91220, REMEDIATE MOLD AT B-10037, REMEDIATE MOLD RM154 AT B-91220&PREVENT RUNOFF AT B-4902 FOR FT HOOD, TX. POP 28 AUG 19 TO 25 MAR 20. | $94K |
| Aug 26, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0348 | 236220 | REPAIR CULVERT AND REPAIR DRAINAGE DITCH AT CLABBER CREEK FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 210 CALENDAR DAYS. BEGINNING 26 AUGUST 2019 THROUGH 23 MARCH 2020. | $186K |
| Aug 26, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0349 | 236220 | REPLACE DAMAGED FLOOR AT B-92087, REPAIR FLOORING AT B-333, DEMO AND INSTALL LVT AT B-90042, REPLACE GENERATOR ENGINE AT B-89101, CRANE REPLACEMENT 7021 AT FT HOOD, TEXAS. POP 210, 26 AUG 19 THROUGH 23 MAR 20 | $466K |
| Aug 20, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0339 | 236220 | THE PURPOSE OF THIS PROJECT IS TO REPLACE BROKEN SEWER PIPE AT 113 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 210 CALENDAR DAYS. BEGINNING 20 AUGUST 2019 THROUGH 17 MARCH 2020. | $59K |
| Aug 20, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0336 | 236220 | CONSTRUCT SIDEWALK AT B-4819, REPAIR URINALS AT B-9535, REPLACE DISCONNECT AT B-88036, CONSTRUCT AWNING AT B4616,&REPAIR EXTERIOR EIFS AT B-90145 FOR FT HOOD, TEXAS. THE CONTRACT POP IS 210 DAYS. BEGINNING 19 AUG 19 THROUGH 16 MAR 19 | $199K |
| Aug 19, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0335 | 236220 | THE PURPOSE OF THIS PROJECT IS TO REPAIR SCIF AT B-2804 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 210 CALENDAR DAYS. BEGINNING 19 AUG 19 THROUGH 16 MAR 20. | $4K |
| Aug 16, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0333 | 236220 | INSTALL CAGE GATE AT B-9211, RELOCATE DOOR AT B-36000, INSTALL AIRLINES AT B-22041, REPLACE RAMP AT B-4408,&REMEDIATE MOLD AT B-10009. POP IS 120, BEGINNING 16 AUG 2019 THROUGH 14 DEC 2019. | $92K |
| Aug 14, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0331 | 236220 | REPLACE SHOWER DRAIN AT B-9529, PAINT AND RESTORE AT B-136, ASBESTOS ABATEMENT AT B-36000, PAINT WALLS AT B-410,&REPAIR ASPHALT AT B-70013. THE CONTRACT PERFORMANCE IS 210 DAYS. BEGINNING 14 AUG 19 THROUGH 11 MAR 20 | $157K |
| Aug 12, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0327 | 236220 | REPLACE COVE BASE AT B-4431, REPAIR AND REPAINT WALLS AT B-22027, REPLACE SHEETROCK CEILING AT B-56454, REPLACE SHEETROCK AT B-56456, REPLACE SHEETROCK CEILING AT B-56437 FOR FORT HOOD. POP IS 120 DAYS, FROM 12 AUG 19 THROUGH 12 DEC 19. | $158K |
| Aug 12, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0328 | 236220 | B-10021 REPAIR AND CLEAN OUT STORM DRAIN AT B-10021, INSTALL CRAC AT B-22028, AND REPAIR AND CLEANOUT STORM DRAIN AT B-10021 FOR FORT HOOD, TX. POP 180, FROM 12 AUG 19 THROUGH 12 FEB 2020. | $228K |
| Aug 6, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0305 | 236220 | THE PURPOSE OF THIS PROJECT IS TO REPAIR ROOMS IN THE HAMMERHEAD BARRACKS FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 300 CALENDAR DAYS. BEGINNING 6 AUG 2019 THROUGH 1 JUNE 2020. | $500K |