Federal Contractor Profile
Olgoonik Diversified Services LLC
$137M obligated·394 awards·3 agencies·6 NAICS
Federal Contracts
Showing contracts 101–150 of 508 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 24, 2019 | Department of DefenseFA7000 10 CONS LGC | FA700019FA177 | 236220 | XQPZ 19-0206 RPR/RECONFIG INT BLDG 5136 FOR FM-JA | $195K |
| Sep 24, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA149 | 236220 | REPAIR PLUMBING 3200 AREA BUILDING 1 | $268K |
| Sep 24, 2019 | Department of DefenseFA7000 10 CONS LGC | FA700018F1167 | 236220 | SPOT REPAIR CENTER GYM, EAST GYM AND NAT | $12K |
| Sep 24, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0077 | 236220 | DPT19-014 INSTALL ELECTRICAL BLDG. 2135&SPC19-004 INSTALL POWER AND ERECT VEHICLE LIFT BLDG. 2082. | $445 |
| Sep 23, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0125 | 236220 | GAR18-018 RENOVATE INTERIOR SPACE B1659 | $351K |
| Sep 18, 2019 | Department of CommerceDEPT OF COMMERCE NIST | DOCSB134117CN0025 | 236220 | IGF::OT::IGF THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) IN BOULDER, COLORADO IS CURRENTLY MAKING SIGNIFICANT IMPROVEMENTS TO ITS 64-YEAR-OLD BOULDER CAMPUS INCLUDING MAJOR RENOVATIONS OF BUILDING 1, WING 3. NIST AND THE OFFICE OF FACILITIES AND PROPERTY MANAGEMENT (OFPM) REQUIRES THE CONTRACTOR TO DISCONNECT AND TEMPORARILY RELOCATE ALL THE ELECTRICAL AND FIRE ALARM CONDUIT; PERFORM ASBESTOS ABATEMENT AND DEMOLITION IN SPECIFIED OFFICE SPACES; TEMPORARILY CONNECT TO THE WING 1 TEMPORARY CHILLER UNTIL THE PERMANENT CENTRAL UTILITY PLANT (CUP) SUPPLY IS OPERATIONAL IN WING 1; AND INSTALL THE NEW CHILLED WATER AND HEATING WATER UTILITIES IN WING 1 UNLESS THE DOMESTIC COLD WATER PIPE HAS THE ASBESTOS ABATED WHEN THE OTHER EXISTING LINES ARE ABATED; INSTALL A CODE COMPLIANT PRODUCT THE ROOF CONTRACTOR SHALL TO BUILD THE PARAPET UP AND ROOF THIS INTO THE SPECIFIED SYSTEM TO KEEP A CONSISTENT LOOK; REVISE NAME TAGS AND CONTROL DRAWINGS TO MATCH THE REVISED ENGINEERED DRAWINGS TO REFLECT THE NEW VERSIONS OF MAXIMO AND METASYS BEFORE THE SYSTEM IS COMPLETE AND TURNED OVER TO OFPM; IN-STALLED AND INTEGRATED WITH THE NEW CHILLED WATER AND HEATING WATER SYSTEM BEING INSTALLED IN THE SECOND FLOOD SPINE | $400K |
| Sep 17, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0122 | 236220 | GAR18-016, REPAIRS (RPR), B1118 TO REMODEL PORTIONS OF B1118, GARRISON HEADQUARTERS, NAMELY: UPGRADE THE APPEARANCE AND CONTROL THE ACCESSIBILITY OF THE ENTRY LOBBY AND VESTIBULE. | $290K |
| Sep 13, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA131 | 236220 | TDKA 19-2521 REPAIR KITCHEN RM 1021 B350 AT PETERSON AFB, CO | $39K |
| Sep 13, 2019 | Department of DefenseW6QK ACC-RSA COS | W9126019P0014 | 238990 | 20K FENCE AND ELECTRICAL UPGRADE | $30K |
| Sep 11, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA119 | 236220 | REPAIR CARPET BLDG. 1171 | $186K |
| Sep 10, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA115 | 236220 | PROVIDE ALL MATERIAL, LABOR, TRANSPORTATION, AND ANY OTHER RESOURCES REQUIRED TO MODIFY THE EXISTING SPACE TO CREATE A NEW SECURE AREA APPROXIMATELY 45,277 SF. COMPLETE WORK IN ACCORDANCE WITH STATEMENT OF WORK&SABER SPECS | $369K |
| Sep 6, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0119 | 236220 | TEN18-026 CNS, OPEN STORAGE BLDG 9091 | $139K |
| Sep 5, 2019 | Department of DefenseFA4613 90 CONS PK | FA461319FA082 | 236220 | REPLACE BARRIER HEATERS AT GATES 1, 2 AND 5 IN ACCORDANCE WITH STATEMENT OF WORK DATED 27 AUG 2019. | $60K |
| Aug 28, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0103 | 236220 | DPW 18-125 MOTOR POOLS PIT FILL/REPAIR | $53K |
| Aug 28, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA108 | 236220 | REPLACE LETTERING BLDG 1 SIGN | $18K |
| Aug 23, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ18F0040 | 236220 | TEN15-504 - RENOVATION OF BUILDING 8000 | $290K |
| Aug 23, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0105 | 236220 | BAA19-004 REMOVE, REPLACE, INSTALL&UPGRADE AUDIO VISUAL&TELECONFERENCING SYSTE IN BUILDING 9662, FTC | $190K |
| Aug 14, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA070 | 236220 | REQUIREMENT TO INSTALL A SCIF INTO BLDG 1 | $142K |
| Aug 2, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251718F5039 | 236220 | REMODEL SECURE RM 163 B2025 | $7K |
| Jul 25, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0084 | 236220 | MWR16-023 REPAIR RESTROOMS AT IHP | $100K |
| Jul 19, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0077 | 236220 | DPT19-014 INSTALL ELECTRICAL BLDG. 2135&SPC19-004 INSTALL POWER AND ERECT VEHICLE LIFT BLDG. 2082. | $15K |
| Jul 3, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ18F0035 | 236220 | PROJECT 2BDE 18-001 - 2BDE LAMS SHELTER | $87K |
| Jul 1, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0074 | 236220 | SABER SERVICES | $148K |
| Jun 28, 2019 | Department of CommerceDEPT OF COMMERCE NIST | DOCSB134117CN0025 | 236220 | IGF::OT::IGF THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) IN BOULDER, COLORADO IS CURRENTLY MAKING SIGNIFICANT IMPROVEMENTS TO ITS 64-YEAR-OLD BOULDER CAMPUS INCLUDING MAJOR RENOVATIONS OF BUILDING 1, WING 3. NIST AND THE OFFICE OF FACILITIES AND PROPERTY MANAGEMENT (OFPM) REQUIRES THE CONTRACTOR TO DISCONNECT AND TEMPORARILY RELOCATE ALL THE ELECTRICAL AND FIRE ALARM CONDUIT; PERFORM ASBESTOS ABATEMENT AND DEMOLITION IN SPECIFIED OFFICE SPACES; TEMPORARILY CONNECT TO THE WING 1 TEMPORARY CHILLER UNTIL THE PERMANENT CENTRAL UTILITY PLANT (CUP) SUPPLY IS OPERATIONAL IN WING 1; AND INSTALL THE NEW CHILLED WATER AND HEATING WATER UTILITIES IN WING 1 UNLESS THE DOMESTIC COLD WATER PIPE HAS THE ASBESTOS ABATED WHEN THE OTHER EXISTING LINES ARE ABATED; INSTALL A CODE COMPLIANT PRODUCT THE ROOF CONTRACTOR SHALL TO BUILD THE PARAPET UP AND ROOF THIS INTO THE SPECIFIED SYSTEM TO KEEP A CONSISTENT LOOK; REVISE NAME TAGS AND CONTROL DRAWINGS TO MATCH THE REVISED ENGINEERED DRAWINGS TO REFLECT THE NEW VERSIONS OF MAXIMO AND METASYS BEFORE THE SYSTEM IS COMPLETE AND TURNED OVER TO OFPM; IN-STALLED AND INTEGRATED WITH THE NEW CHILLED WATER AND HEATING WATER SYSTEM BEING INSTALLED IN THE SECOND FLOOD SPINE | $305K |
| Jun 27, 2019 | Department of DefenseFA4613 90 CONS PK | FA461317FG616 | 236220 | IGF::OT::IGF RENOVATE Q-01 FOR WYOSHPO | $13K |
| Jun 19, 2019 | Department of DefenseW071 ENDIST OMAHA | W9128F18C0015 | 236220 | IGF::OT::IGF - M - NIST BLDGS 1&22 RENOVATION, BOULDER, CO | $40K |
| Jun 14, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA070 | 236220 | REQUIREMENT TO INSTALL A SCIF INTO BLDG 1 | $1.2M |
| Jun 14, 2019 | Department of DefenseFA7000 10 CONS LGC | FA700018F1167 | 236220 | SPOT REPAIR CENTER GYM, EAST GYM AND NAT | $4K |
| Jun 13, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA065 | 236220 | TDKA 19-2507 BLDG 2 J6 CRAC (COMPUTER ROOM AC) UNIT REPLACEMENT, ROOM B011 | $141K |
| Jun 4, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251718F5039 | 236220 | REMODEL SECURE RM 163 B2025 | $7K |
| May 31, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA043 | 236220 | IGF:OT::IGF THE CONTRACTOR SHALL FURNISH ALL LABOR, TOOLS, PARTS, EQUIPMENT, MATERIALS, AND TRANSPORTATION NECESSARY TO COMPLETE TDKA 16-2527 REPAIR CLASSROOM, B1555 IN ACCORDANCE WITH ATTACHED STATEMENT OF WORK | $105K |
| May 30, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA058 | 236220 | LOGICAL FOLLOW ON REQUIREMENT OF UTILIDOR REPIAR | $71K |
| May 21, 2019 | Department of DefenseW071 ENDIST OMAHA | W9128F17C0048 | 236220 | IGF::OT::IGF DESIGN AND CONSTRUCT NIST BOULDER COMPUTER FACILITY, CO | $27K |
| May 20, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0031 | 236220 | DPT19-001, CONSTRUCT PHOTO BOOTH BLDG 12 | $2K |
| May 17, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0068 | 236220 | TEN18-029 B1280, CONSTRUCT CUBICLES AND PERFORM ELECTRICAL WORK | $90K |
| May 15, 2019 | Department of DefenseFA4613 90 CONS PK | FA461319FA046 | 236220 | B246 RENOVATIONS IN ACCORDANCE WITH STATEMENT OF WORK DATED 6 MAR 2019. | $19K |
| May 10, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA056 | 236220 | HIGH BAY BLDG 2027 | $390K |
| May 8, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA051 | 236220 | REPLACE POOL PIPING BLDG 404 | $158K |
| May 7, 2019 | General Services AdministrationPBS R00 SPECIAL PROGRAMS DIVISION | 47PA0318C0046 | 236220 | DESIGN-BUILD EOIR SPACE BUILD-OUT IN DENVER, CO | $5K |
| May 7, 2019 | Department of CommerceDEPT OF COMMERCE NIST | DOCSB134117CN0025 | 236220 | IGF::OT::IGF THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) IN BOULDER, COLORADO IS CURRENTLY MAKING SIGNIFICANT IMPROVEMENTS TO ITS 64-YEAR-OLD BOULDER CAMPUS INCLUDING MAJOR RENOVATIONS OF BUILDING 1, WING 3. NIST AND THE OFFICE OF FACILITIES AND PROPERTY MANAGEMENT (OFPM) REQUIRES THE CONTRACTOR TO DISCONNECT AND TEMPORARILY RELOCATE ALL THE ELECTRICAL AND FIRE ALARM CONDUIT; PERFORM ASBESTOS ABATEMENT AND DEMOLITION IN SPECIFIED OFFICE SPACES; TEMPORARILY CONNECT TO THE WING 1 TEMPORARY CHILLER UNTIL THE PERMANENT CENTRAL UTILITY PLANT (CUP) SUPPLY IS OPERATIONAL IN WING 1; AND INSTALL THE NEW CHILLED WATER AND HEATING WATER UTILITIES IN WING 1 UNLESS THE DOMESTIC COLD WATER PIPE HAS THE ASBESTOS ABATED WHEN THE OTHER EXISTING LINES ARE ABATED; INSTALL A CODE COMPLIANT PRODUCT THE ROOF CONTRACTOR SHALL TO BUILD THE PARAPET UP AND ROOF THIS INTO THE SPECIFIED SYSTEM TO KEEP A CONSISTENT LOOK; REVISE NAME TAGS AND CONTROL DRAWINGS TO MATCH THE REVISED ENGINEERED DRAWINGS TO REFLECT THE NEW VERSIONS OF MAXIMO AND METASYS BEFORE THE SYSTEM IS COMPLETE AND TURNED OVER TO OFPM; IN-STALLED AND INTEGRATED WITH THE NEW CHILLED WATER AND HEATING WATER SYSTEM BEING INSTALLED IN THE SECOND FLOOD SPINE | $4K |
| May 2, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA048 | 236220 | IGF::OT::IGF REPAIR OVERHEAD DOORS BLDG 2015 | $89K |
| May 1, 2019 | Department of DefenseW071 ENDIST OMAHA | W9128F17C0048 | 236220 | IGF::OT::IGF DESIGN AND CONSTRUCT NIST BOULDER COMPUTER FACILITY, CO | $179K |
| Apr 29, 2019 | Department of DefenseFA2543 460 CONS | 5G13 | 236220 | IGF::OT::IGF REPAIR SUBGRADE ASPEN/KEYSTONE WAY | $216K |
| Apr 25, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ18F0109 | 236220 | PROJECT TEN17-008 | $55K |
| Apr 25, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ18F0040 | 236220 | TEN15-504 - RENOVATION OF BUILDING 8000 | $39K |
| Apr 23, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA049 | 236220 | REPAIR ROOF BLDG 2017 | $310K |
| Apr 19, 2019 | Department of DefenseW6QM MICC-FT CARSON | W911RZ19F0053 | 236220 | DPW18-122 SFAB BLDG 1161 | $254K |
| Apr 18, 2019 | Department of DefenseFA4613 90 CONS PK | FA461319FA026 | 236220 | PORCH AND FIRE ESCAPE REPAIRS BUILDING 37 | $17K |
| Apr 11, 2019 | Department of DefenseFA2517 21 CONS BLDG 350 | FA251719FA047 | 236220 | IGF:OT::IGF THE CONTRACTOR SHALL FURNISH ALL LABOR, TOOLS, PARTS, EQUIPMENT, MATERIALS, AND TRANSPORTATION NECESSARY TO COMPLETE TDKA 18-2505 REPAIR OVERHEAD DOORS, B218 IN ACCORDANCE WITH ATTACHED STATEMENT OF WORK (SOW), DRAWINGS, AND ORIGINAL SABER CERTIFICATIONS. | $147K |
| Apr 9, 2019 | Department of DefenseFA7000 10 CONS LGC | FA700018F1170 | 236220 | XQPZ 08-5001A DEMOLISH GOLF COURSE CLUBHOUSE | $110K |
Get Alerted Before Olgoonik Diversified Services LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free