Federal Contractor Profile
Price Contracting INC
$64M obligated·211 awards·3 agencies·8 NAICS
Federal Contracts
Showing award actions 101–150 of 284 funded award actions, most recent first.
- Contracts with positive obligations
- 211
- Funded award actions shown
- 284
- Obligations shown
- $64M
- Awarding agencies
- 3
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 25, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jun 6, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0028 | 237310 | GAOA - RECREATION SITE ROAD DEFERRED MAINTENANCE (1DQ). THE PROJECT CONSISTS OF ROAD CLEARING, RECONDITIONING, DRAIN DIP CONSTRUCTION AND CULVERT INSTALLATION. PROJECT ALSO INCLUDES FULL DEPTH SURFACE RECLAMATION ON SELECT NATIVE SURFACED ROADS, USI | $10K |
| Jun 2, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0064 | 237310 | GAOA EAST FORK RESERVOIR AND STORM LAKE ROAD RECONDITIONING-THE INTENT OF THIS PROJECT IS TO IMPROVE ROAD DRAINAGE AND RECONDITION EAST FORK FORK ROAD #672. | $110K |
| Jun 1, 2023 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B123F0064 | 237310 | 0412 CONST IIJA SIL LITTLE WEISER AND ANDERSON CREEK ROAD RESURFACING, BASE | $1.2M |
| May 23, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0057 | 237310 | GAOA - GREEN BAY CAMPGROUND RENOVATIONS. THIS PROJECT CONSISTS OF CONSTRUCTING/RECONSTRUCTING VARIOUS CAMPING FACILITIES, ROADS, PATHS, AND PARKING AREAS AT THE GREEN BAY CAMPGROUND LOCATED ON THE IDAHO PANHANDLE NATIONAL FORESTS. | $846K |
| May 16, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0028 | 237310 | GAOA - RECREATION SITE ROAD DEFERRED MAINTENANCE (1DQ). THE PROJECT CONSISTS OF ROAD CLEARING, RECONDITIONING, DRAIN DIP CONSTRUCTION AND CULVERT INSTALLATION. PROJECT ALSO INCLUDES FULL DEPTH SURFACE RECLAMATION ON SELECT NATIVE SURFACED ROADS, USI | $7K |
| May 4, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0046 | 237310 | BAER: STEEP GULCH CULVERT REPLACEMENT WILL REPLACE AN UNDERSIZED CULVERT TO ALLOW INCREASED FLOWS TO PASS UNDER THE ROAD WITHOUT CAUSING DAMAGE TO THE CROSSING. | $85K |
| May 4, 2023 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B123F0041 | 237310 | HIGH PRIORITY - CLEAR ROADSIDE VEGETATION, RECONDITION, AND RESURFACE APPROXIMATELY 11 MILES OF NFS ROADS. UTILIZE EXISTING AGGREGATE STOCKPILES AT THE SAGE HEN PIT, APPROX. 32,000 TONS AVAILABLE. REPLACE DEFICIENT DRAINAGE CULVERTS WHERE NEEDED. | $282K |
| Apr 28, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0042 | 237310 | GAOA MT BITTERROOT: MEADOW VAPOR AND DARBY STORMWATER UPGRADES THE PROJECT CONSISTS OF BEST MANAGEMENT PRACTICE (BMP) UPGRADES AND ROAD IMPROVEMENT WORK, TO INCLUDE BUT NOT LIMITED TO DRAIN DIP CONSTRUCTION, CULVERT INSTALLATION AND ROADWAY RECONDIT | $423K |
| Apr 25, 2023 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B123F0003 | 237310 | THE WORK CONSISTS OF WHAT IS SHOWN ON THE PLANS, STATED IN THE SPECIFICATIONS, AND SUMMARIZED BELOW. PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT NEEDED TO COMPLETE THE WORK. THIS PROJECT CONSISTS OF PURCHASING, DELIVERING AND INSTALLING A 70-FOOT SPAN | $299K |
| Apr 18, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0024 | 237310 | GAOA CENTENNIAL ROAD IMPROVEMENTS TASK ORDER ON THE MADISON RD | $424K |
| Apr 13, 2023 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B123F0033 | 237310 | CONSTRUCTION OF 26' SPAN MULTI-PLATE PIPE ARCH SET ON PRECAST CONCRETE FOOTINGS. UTILIZE THE R4 CIVIL CONSTRUCTION MATOC, ZONE 1. | $503K |
| Apr 13, 2023 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B123F0041 | 237310 | HIGH PRIORITY - CLEAR ROADSIDE VEGETATION, RECONDITION, AND RESURFACE APPROXIMATELY 11 MILES OF NFS ROADS. UTILIZE EXISTING AGGREGATE STOCKPILES AT THE SAGE HEN PIT, APPROX. 32,000 TONS AVAILABLE. REPLACE DEFICIENT DRAINAGE CULVERTS WHERE NEEDED. | $644K |
| Mar 27, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0031 | 237310 | GAOA CRYSTAL LAKE CAMPGROUND IMPROVEMENTS ON THE JUDITH-MUSSELSHELL RANGER DISTRICT, HELENA L&C NF | $854K |
| Mar 14, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0028 | 237310 | GAOA - RECREATION SITE ROAD DEFERRED MAINTENANCE (1DQ). THE PROJECT CONSISTS OF ROAD CLEARING, RECONDITIONING, DRAIN DIP CONSTRUCTION AND CULVERT INSTALLATION. PROJECT ALSO INCLUDES FULL DEPTH SURFACE RECLAMATION ON SELECT NATIVE SURFACED ROADS, USI | $169K |
| Mar 3, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0024 | 237310 | GAOA CENTENNIAL ROAD IMPROVEMENTS TASK ORDER ON THE MADISON RD | $300K |
| Feb 2, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 2 | 1284LM22F0018 | 237310 | GAOA: RECREATION SITE ACCESS ROAD RECLAMATION_ST MARYS DRIVING SURFACE IMPROVEMENT | $145K |
| Dec 7, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22C0033 | 237310 | GAOA_WARM SPRINGS 6 DEFICIENT BRIDGE REPAIR 4CF | $40K |
| Nov 21, 2022 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B123F0003 | 237310 | THE WORK CONSISTS OF WHAT IS SHOWN ON THE PLANS, STATED IN THE SPECIFICATIONS, AND SUMMARIZED BELOW. PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT NEEDED TO COMPLETE THE WORK. THIS PROJECT CONSISTS OF PURCHASING, DELIVERING AND INSTALLING A 70-FOOT SPAN | $635K |
| Nov 16, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F4000 | 237310 | GAOA KNIEFF CREEK CULVERT REPLACEMENT PROJECT - TASK ORDER ON THE IDIQ ROAD CONSTRUCTION SERVICES CONTRACT. | $745K |
| Nov 1, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0097 | 237310 | DAGGER CREEK BRIDGE REPLACEMENT PROJECT SALMON-CHALLIS NATIONAL FOREST | $22K |
| Sep 29, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0097 | 237310 | DAGGER CREEK BRIDGE REPLACEMENT PROJECT SALMON-CHALLIS NATIONAL FOREST | $15K |
| Sep 29, 2022 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B122F0052 | 237310 | CONSTRUCTION, CMJL JEANETTE CREEK AOP, REGION 4 ROADS MATOC. BASE ITEMS | $273K |
| Sep 20, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0097 | 237310 | DAGGER CREEK BRIDGE REPLACEMENT PROJECT SALMON-CHALLIS NATIONAL FOREST | $147K |
| Sep 8, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0116 | 237310 | BEAVER CREEK FISHING ACCESS IMPROVEMENTS | $199K |
| Sep 6, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0097 | 237310 | CONSTRUCTION CONTRACT TO IMPROVE THE NATIVE SURFACE OF FOREST ROAD 114. | $43K |
| Aug 31, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0110 | 237310 | THIS PROJECT CONSISTS OF THE REPLACEMENT OF THREE BRIDGES WITH SELECTED STRUCTURES, AT THREE DIFFERENT LOCATIONS ON THE BITTERROOT NATIONAL FOREST IN MONTANA. | $840K |
| Aug 24, 2022 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B122F0022 | 237310 | INFRASTRUCTURE FUNDING (CMJR) - 622 ROAD IMPROVEMENTS (CONSTRUCTION) - UTILIZE R4 CIVIL MATOC | $150K |
| Aug 23, 2022 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056722F00117N | 237310 | ID FS SAW T 2017(1), REDFISH LAKE TO STANLEY TRAIL | $832K |
| Aug 19, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0084 | 237310 | THE PROJECT SCOPE FOR GAOA SCNF BOUNDARY-DAGGER ROAD - STANLEY- LANDMARK PROJECT 4BM OUTLINES ROAD IMPROVEMENTS ALONG THE 579 AND 568 ROADS ON THE CHALLIS AND LOWMAN RANGER DISTRICTS. | $687K |
| Aug 18, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT21F0027 | 237310 | GAOA BOISE NF EF BURNT LOG CREEK DEFICIENT BRIDGE PRIORITY REPAIR - REPLACE DEFICIENT TIMBER BRIDGE WITH PREFABRICATED STEEL BRIDGE. | $4K |
| Aug 16, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0037 | 237310 | ST. JOE ROAD IMPROVEMENT TASK ORDER | $69K |
| Aug 15, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0056 | 237310 | ALDER & TRAIL FIRES BAER ROAD WORK ON FS ROADS 1213, 8243 AND 943,1084,1085,1242,AND 7369 ON THE BEAVERHEAD-DEERLODGE NATIONAL FOREST | $4K |
| Jul 28, 2022 | Department of AgricultureRegional Office, R1 | 12034322M7082 | 115310 | PRICE CONTRACTING, INC. MT-BRF-022161 E-40 | $56K |
| Jul 28, 2022 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056722F00117N | 237310 | ID FS SAW T 2017(1), REDFISH LAKE TO STANLEY TRAIL | $1.1M |
| Jul 26, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0072 | 237310 | THE PROJECT CONSISTS OF RE-ESTABLISHING DRIVING SURFACE TO SPECIFIED DEPTH ON NATIVE SURFACED ROADS, USING MOBILE ROCK MILLING EQUIPMENT TO MANUFACTURE CUSHION FROM IN-PLACE BOULDERS AND BEDROCK IN THE ROAD SURFACE. THIS INCLUDES WATERING, MIXING, B | $381K |
| Jul 26, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0038 | 237310 | GAOA FY22 HLF BCWSS LOGGING LICK CREEK ROAD IMPROVEMENTS: SPECIFIC WORK ITEMS TO FOREST ROAD NO. 67 & 839 INCLUDE BUT ARE NOT LIMITED TO: SELECTIVE CLEARING, SPECIAL CLEARING & GRUBBING, ITEM REMOVAL (CULVERT), ADDING DESIGNATED BARROW MATERI | $68K |
| Jul 12, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0065 | 237310 | CONSTRUCTION, EAST FORK FIR CREEK BRIDGE, BOISE NATIONAL FOREST, LOWMAN RANGER DISTRICT, ROADS MATOC | $378K |
| Jun 29, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0058 | 237310 | CONSTRUCTION, BNF, TWO-BIT CULVERT REPLACEMENT | $194K |
| Jun 28, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22C0040 | 237310 | CONSTRUCTION, BNF, TWO-BIT CULVERT REPLACEMENT | $194K |
| Jun 28, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0027 | 237310 | CONSTRUCTION, SMITH CREEK AOPS AND BRIDGE, ROADS MATOC | $22K |
| Jun 22, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 3 | 1240LN21F0095 | 237310 | SPECIFIC WORK ITEMS TO FOREST ROAD NO. 138 INCLUDE, BUT ARE NOT LIMITED TO: CLEARING AND GRUBBING, BRUSHING, CULVERT CLEANING, REMOVAL AND INSTALLATION, GATE INSTALLATION, DRAINAGE EXCAVATION (TYPE II DRAIN DIP), RIPRAP PLACEMENT, DITCH AND SHOULDER | $43K |
| Jun 22, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 2 | 1284LM22F0018 | 237310 | GAOA: RECREATION SITE ACCESS ROAD RECLAMATION_ST MARYS DRIVING SURFACE IMPROVEMENT | $52K |
| Jun 14, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22C0033 | 237310 | GAOA_WARM SPRINGS 6 DEFICIENT BRIDGE REPAIR 4CF | $330K |
| Jun 13, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0025 | 237310 | SF RAMP TRAVEL MANAGEMENT ROAD DECOMMISSIONING - ZENA-OOMPAUL AREA | $137K |
| Jun 8, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0020 | 237310 | GAOA CONSTRUCTION - COUNCIL AND WEISER BRIDGE REPAIRS, ROADS MATOC | $204K |
| Jun 3, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0056 | 237310 | ALDER & TRAIL FIRES BAER ROAD WORK ON FS ROADS 1213, 8243 AND 943,1084,1085,1242,AND 7369 ON THE BEAVERHEAD-DEERLODGE NATIONAL FOREST | $277K |
| Jun 2, 2022 | Department of AgricultureUSDA-FS, STEWARDSHIP CONTRACTING BRANCH | 12363N22F4028 | 237310 | THORN CREEK TIMBER SALE ROAD CONSTRUCTION (GNA) COUNCIL RANGER DISTRICT; PAYETTE NATIONAL FOREST | $118K |
| May 20, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 8 | 1240LT22F0020 | 237310 | GAOA CONSTRUCTION - COUNCIL AND WEISER BRIDGE REPAIRS, ROADS MATOC | $109K |
| May 18, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 2 | 1284LM22F0013 | 237310 | GAOA: BITTERROOT NATIONAL FOREST RECREATION SITE ACCESS ROAD RECLAMATION_GIRD THIS TO IS ASSOCIATED WITH THE PARENT CONTRACT AND ALL TERMS AND CONDITIONS APPLY. THE TOTAL AMOUNT OF AWARD IS $379,845.00. THE OBLIGATION FOR THIS AWARD IS SHOWN I | $10K |
| May 17, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0045 | 237310 | GAOA MEADOW VAPOR & DARBY AOP AND STORM WATER UPGRADES WITH CULVERT REPLACEMENTS UNDER THE REGION 1 ROAD & BRIDGE MATOC IN THE UPPER EAST FORK BITTERROOT DRAINAGE. | $449K |
Get Alerted Before Price Contracting INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free