Skip to content
Home/Contractors/Schrock Construction INC

Federal Contractor Profile

Schrock Construction INC

Federal contracting record: $1.1M obligated across 5 awards from 2 agencies, FY 2016–2026.

$1.1M
Total Obligated
5
Award Records
2
Agencies Served
2
NAICS Codes

Schrock Construction INC at a glance

Schrock Construction INC, based in Victor, MT, has received $1.1M in federal contract obligations across 5 awards from 2 agencies.

Its largest customer is the Department of Agriculture, at 77% of obligations, followed by Department of Health and Human Services (23%).

Its largest line of work is NAICS 236220 (commercial and institutional building construction): $1.0M across 4 awards.

One of its contracts with the Department of Agriculture is scheduled to end in November 2026, which can open it to recompetition.

Company Profile

Parent UEI (Unique Entity Identifier)

CLYMK3WHKS67

CAGE Code

6UXE5

Address

1353 US HIGHWAY 93 N, VICTOR, MT, 598759769

First Federal Award

Oct 27, 2015

Most Recent Award

Sep 8, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 236220

    COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

    4 awards

    $1.0M
  • 236210

    INDUSTRIAL BUILDING CONSTRUCTION

    1 awards

    $40K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Sep 8, 2026Department of AgricultureUSDA FOREST SERVICE-SPOC EAST236220TRAPPER CREEK WIND DAMAGE RECONSTRUCTION - REPAIR MULTIPLE BUILDINGS DAMAGED BYWIND AND FALLING TREES (ROOF, CEILING, WALL, AND ADJOINING AREAS)$17K
Apr 23, 2026Department of AgricultureUSDA FOREST SERVICE-SPOC EAST236220TRAPPER CREEK WIND DAMAGE RECONSTRUCTION - REPAIR MULTIPLE BUILDINGS DAMAGED BYWIND AND FALLING TREES (ROOF, CEILING, WALL, AND ADJOINING AREAS)$805K
Sep 24, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION236220ORF PROJECT NO. C200618 CONSTRUCTION, THE CONTRACTOR SHALL EVALUATE THE ROOFS AT THE NIH/RML CAMPUS AND PREPARE A REPORT AND COST ESTIMATE FOR THE SHORT TERM AND LONG-TERM REPAIR ON ROOFS. (SEE THE SCHEDULE)$138K
Mar 21, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION236220CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE SLOPE STABILIZATION IN THE NORTHWEST CORNER OF THE NIH/RML ALONG THE PROPERTY LINE AND RE-INSTALL THE FENCE ON THE PROPER PROPERTY LINE. (SEE THE SCHEDULE)$6K
Mar 7, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION236220CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO PROVIDE SLOPE STABILIZATION IN THE NORTHWEST CORNER OF THE NIH/RML ALONG THE PROPERTY LINE AND RE-INSTALL THE FENCE ON THE PROPER PROPERTY LINE. (SEE THE SCHEDULE)$65K
Dec 15, 2015Department of Health and Human ServicesOD OM ORFDO OA OFC ACQUISITIONS236210IGF::OT::IGF HAZMAT VEHICLE STORAGE BUILDING, LOCATED AT THE NATIONAL INSTITUTES OF HEALTH (N.I.H.) ROCKY MOUNTAIN LABORATORIES (R.M.L.) IN HAMILTON, MT, INCLUDES THE CONSTRUCTION OF A NEW POST-FRAME, INSULATED, METAL-SIDED VEHICLE STORAGE BUILDING AND APPURTENANCES. THIS BUILDING WILL BE A 36'X40' (1,440 FT2) WITH 14' HIGH WALLS WITH AN OVERHANG COVERED AREA ON ONE SIDE. THE BUILDING SHALL HAVE REINFORCED CONCRETE FLOOR, TWO 12'X 12' POWER OPERATED OVERHEAD DOORS, TWO PERSONNEL DOORS, WINDOWS, NATURAL GAS UNIT HEATERS, LED LIGHTING AND A BATHROOM WITH SLOP SINK. IT ALSO INCLUDES A 36'X 30' REINFORCED CONCRETE APRON, DOOR STOOPS, BOLLARDS TO PROTECT THE DOORWAYS AND UNDERGROUND UTILITY WORK INCLUDING ELECTRICAL FEEDERS IN CONDUIT, WATER SERVICE LINE, SEWER SERVICE LINES, AND NATURAL GAS LINE. THE PRIMARY PURPOSE OF THE BUILDING IS TO SERVE AS A STORAGE BUILDING FOR TWO LARGE TRUCKS THAT ARE PART OF THE HAZARDOUS RESPONSE UNIT.$25K
Oct 27, 2015Department of Health and Human ServicesOD OM ORFDO OA OFC ACQUISITIONS236210IGF::OT::IGF HAZMAT VEHICLE STORAGE BUILDING, LOCATED AT THE NATIONAL INSTITUTES OF HEALTH (N.I.H.) ROCKY MOUNTAIN LABORATORIES (R.M.L.) IN HAMILTON, MT, INCLUDES THE CONSTRUCTION OF A NEW POST-FRAME, INSULATED, METAL-SIDED VEHICLE STORAGE BUILDING AND APPURTENANCES. THIS BUILDING WILL BE A 36'X40' (1,440 FT2) WITH 14' HIGH WALLS WITH AN OVERHANG COVERED AREA ON ONE SIDE. THE BUILDING SHALL HAVE REINFORCED CONCRETE FLOOR, TWO 12'X 12' POWER OPERATED OVERHEAD DOORS, TWO PERSONNEL DOORS, WINDOWS, NATURAL GAS UNIT HEATERS, LED LIGHTING AND A BATHROOM WITH SLOP SINK. IT ALSO INCLUDES A 36'X 30' REINFORCED CONCRETE APRON, DOOR STOOPS, BOLLARDS TO PROTECT THE DOORWAYS AND UNDERGROUND UTILITY WORK INCLUDING ELECTRICAL FEEDERS IN CONDUIT, WATER SERVICE LINE, SEWER SERVICE LINES, AND NATURAL GAS LINE. THE PRIMARY PURPOSE OF THE BUILDING IS TO SERVE AS A STORAGE BUILDING FOR TWO LARGE TRUCKS THAT ARE PART OF THE HAZARDOUS RESPONSE UNIT.$15K

Contracts expiring soon

Schrock Construction INC contracts whose period of performance ends soonest — each one a likely recompete.

All contracts expiring soon →

Want to win work like Schrock Construction INC?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.