Federal contracting record: $50M obligated across 211 awards from 1 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
Y536XM52MGV5
CAGE Code
3DN00
Address
126 S JAMES ST STE 100, GOLDSBORO, NC, 275304702
First Federal Award
Oct 1, 2015
Most Recent Award
May 15, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Defense$50M
100.0% of total obligations
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Jun 2, 2026 | Department of DefenseFA4803 20 CONS LGCA | 237310 | REPAIR AFCENT MULTI PARKING | $163K |
| May 15, 2026 | Department of DefenseFA4803 20 CONS LGCA | 237310 | INTERSECTION IMPROVEMENT/AFCENT ROUNDABOUT | $770K |
| Sep 30, 2025 | Department of DefenseFA4803 20 CONS LGCA | 237310 | CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS, TOOLS, EQUIPMENT, AND TRANSPORTATION TO EXECUTE THE REQUIREMENTS OF DRYDEN WAY AND THE PATROL ROAD AT SHAW AFB, SC IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW) DATED 29 JULY 2025. | $512K |
| Sep 27, 2025 | Department of DefenseFA4809 4TH CONS SQ CC | 237310 | REPAIR AIRFIELD/BASE PAVEMENTS | $39K |
| Sep 25, 2025 | Department of DefenseFA4809 4TH CONS SQ CC | 237310 | REPAIR AIRFIELD/BASE PAVEMENTS | $68K |
| Sep 19, 2025 | Department of DefenseFA4803 20 CONS LGCA | 237310 | THE PURPOSE OF THIS TASK ORDER IS TO REMOVIE EXISTING POLY PADS AND REPLACE THEM WITH NEW PADS, INSTALL NEW POLY PADS TO THE EDGE OF THE RUNWAY, CONCRETE SLAB REMOVAL AND REPLACEMENT, CONCRETE SPALL REPAIR, AND OTHER WORK AS SPECIFIED IAW THE SOW | $296K |
| Sep 17, 2025 | Department of DefenseFA4803 20 CONS LGCA | 237310 | THE PURPOSE OF THIS TASK ORDER IS TO REMOVE RUBBER, RESTRIPE AND PAINT PORTIONS OF THE RUNWAY IAW THE ATTACHED STATEMENT OF WORK. | $169K |
| Sep 15, 2025 | Department of DefenseFA4803 20 CONS LGCA | 237310 | THIS REQUIREMENT IS TO REPLACE ALL RUNWAY CENTERLINE STRIPES (37 TOTAL CENTERLINE STRIPES) ON SHAW AFB, SC IN ACCORDANCE WITH THE STATEMENT OF WORK DATED 10 JULY 2025. | $48K |
| Aug 12, 2025 | Department of DefenseFA4803 20 CONS LGCA | 237310 | CONSTRUCT A BLAST WALL AND FENCING AROUND THE PRIMARY GENERATOR FOR THE 1900 AREA AFCENT COMPOUND ALONG WITH PAVING A NEW SIDEWALK AND PROVIDING LIGHTS AND VEHICLE BARRIERS FOR THE GENERATOR AND SURROUNDING AREA. | $8K |
| Jul 23, 2025 | Department of DefenseFA4809 4TH CONS SQ CC | 237310 | REPAIR AIRFIELD/BASE PAVEMENTS | $189K |
| May 29, 2025 | Department of DefenseFA4803 20 CONS LGCA | 237310 | THIS REQUIREMENT IS TO EXTEND THE EXISTING TRAIL LOCATED ACROSS FROM B1505 ADJACENT TO THE GOLF COURSE PARAMETER AND TERMINATE TRAIL ONTO EXISTING SIDEWALK ADJACENT TO B1411ON SHAW AFB, SC IN ACCORDANCE WITH THE STATEMENT OF WORK. | $30K |
| May 7, 2025 | Department of DefenseFA4803 20 CONS LGCA | 237310 | THE PURPOSE OF THIS PROJECT IS TO MILL AND REPAVE RHODES AVE FROM THE WATER TOWER TO THE INTERSECTION WITH SHAW DR. AS WELL AS ADD A CROSSWALK ON SHAW DR. | $20K |
| Jan 14, 2025 | Department of DefenseFA4809 4TH CONS SQ CC | 237310 | VKAG 25-1002 MAINTAIN PAVEMENT MARKING AND RUBBER REMOVAL | $241K |
| Sep 30, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | THIS PROJECT IS FOR REPAIRING VARIOUS PARKING LOTS 1799, B825 AND B1510 WHICH CONSISTS OF MILLING OF EXISTING ASPHALT, SURFACE MIX ASPHALT PLACEMENT, STRIPING, GRADING, DEMO/REPLACE WHEEL STOPS, INSTALLING SIDEWALK, AND PROVIDING DRAINAGE IAW THE SOW | $329K |
| Sep 27, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | FOR PROVIDING ALL PLAN, LABOR, MATERIAL, EQUIPMENT, PERMITS, AND TRANSPORTATION AND PERFORMING ALL OPERATIONS NECESSARY TO REPAIR DRAINAGE STRUCTURES AT THE NORTH FIGHTER RAMP AND CONCRETE APRON NEAR TWY ALPHA AND TWY BRAVO. | $56K |
| Sep 27, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | CONSTRUCT A BLAST WALL AND FENCING AROUND THE PRIMARY GENERATOR FOR THE 1900 AREA AFCENT COMPOUND ALONG WITH PAVING A NEW SIDEWALK AND PROVIDING LIGHTS AND VEHICLE BARRIERS FOR THE GENERATOR AND SURROUNDING AREA. | $659K |
| Sep 24, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | THE PURPOSE OF THIS PROJECT IS TO MILL AND REPAVE RHODES AVE FROM THE WATER TOWER TO THE INTERSECTION WITH SHAW DR. AS WELL AS ADD A CROSSWALK ON SHAW DR. | $815K |
| Sep 20, 2024 | Department of DefenseFA4809 4TH CONS SQ CC | 237310 | THE SUBJECT TASK ORDER IS ISSUED FOR THE PAYMENT OF THE PROJECT-ESTIMATING FEE, INCLUSIVE OF THE STATEMENT OF WORK AND DESIGN FOR PROJECT NO. VKAG 24-1021 REPAIR SLIPPAGE CRACKING, TAXIWAY GOLF. | $106 |
| Sep 18, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | THE PURPOSE OF THIS REQUIREMENT IS TO CONSTRUCT DELINEATION TREATMENTS ON THE STREETS TO IMPROVE DRIVING CONDITIONS AT SHAW AIR FORCE BASE. ALL WORK SHOULD BE EXECUTED IAW THE ATTACHED STATEMENT OF WORK, DATED 13 AUGUST 2024. | $48K |
| Sep 16, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | REMOVE RUBBER, PAINT CENTER LINES, REPAIR JOINT SEALS, REMOVE SEDIMENT AND GRASS BUILDUP ON SHAW AIR FORCE BASE RUNWAYS AND TAXIWAYS. | $289K |
| Sep 13, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | REPAIR JOINT SEAL, CONCRETE SPALL AND DEMO/REPLACE CONCRETE TO INSTALL FULL DEPTH CORK BOARD EXPANSION JOINTS | $345K |
| Sep 9, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | PLAN, LABOR, MATERIAL, EQUIPMENT, PERMITS, TRANSPORTATION AND PERFORMING ALL OPERATIONS NECESSARY TO DEMO EXCAVATE EXISTING PAVEMENT AND BASE, INSTALL GRAVEL BASE, REPAIR CATCH BASIN INLETS, REPAIR CURB AND GUTTER, IN STRICT ACCORDANCE WITH THE SOW. | $326K |
| Jul 3, 2024 | Department of DefenseFA4809 4TH CONS SQ CC | 237310 | VKAG 23-1038 REPAIR BOLLARDS BERKELEY GATE | $5K |
| Mar 12, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | MQ-9 BUILDING GENERATOR PROTECTION | $42K |
| Feb 20, 2024 | Department of DefenseFA4803 20 CONS LGCA | 237310 | CONSTRUCT A NEW PARKING LOT FOR THE MQ-9 TRAINING AND ADMINISTRATION BUILDINGS. | $5K |