Home/Contractors/Southwest Research Institute/contracts

Federal Contractor Profile

Southwest Research Institute

$1.98B obligated·1,105 awards·15 agencies·62 NAICS

Federal Contracts

Showing contracts 150 of 2,733 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Apr 23, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310023F0142541715TECHNICAL ASSISTANCE FOR DEVELOPMENT OF REGULATORY AND TECHNICAL ANALYSES SUPPORTING 10 CFR PART 61$100K
Apr 21, 2026National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25PA983541380RAMAN SPECTROSCOPIC INSTRUMENT TESTING AND FIELD TEST LOGISTICS$15K
Apr 15, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC20C0053336419SOLAR ORBITER SPICE PHASES E/F EFFORT$350K
Apr 13, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310024F0137541715RESEARCH AND GUIDANCE DEVELOPMENT ASSISTANCE ON INNOVATIVE METHODS AND TECHNOLOGIES TO ENHANCE SAFETY FOR DESIGN AND CONSTRUCTION OF NEW COMMERCIAL NUCLEAR POWER PLANTS$112K
Apr 10, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310024F0140541715DEVELOPMENT OF ANNOTATED DOCUMENTS FOR SRPS AND SELECT RGS FOR NRC REVIEW OF [1] STORAGE AND [2] TRANSPORTATION OF SPENT NUCLEAR FUEL AND RADIOACTIVE MATERIALS APPLICATIONS$410K
Apr 9, 2026Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303022FET400026541611BASE IDIQ$1.0M
Apr 8, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310023F0032541715CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES (CNWRA) MANAGEMENT AND INFRASTRUCTURE-RELATED ACTIVITIES (MINIMUM GUARANTEE)$260K
Apr 2, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310023F0143541715TECHNICAL ASSISTANCE FOR REVIEW OF THE DOE NON HIGH LEVEL WASTE DETERMINATIONS$365K
Apr 2, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM09AA24C541712STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS OF NASAS PLANETARY SCIENCE PROGRAM.$705K
Apr 2, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC25CA025336414DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF.$1.2M
Mar 31, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310025C0023541380RADIOCHEMICAL SAMPLE ANALYSIS SUPPORT FOR DECOMMISSIONING SITES$34K
Mar 30, 2026National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC26P0417513210NUMERICAL PROPULSION SYSTEM SIMULATION (NPSS) CONSORTIUM SUPPORT FY26$32K
Mar 25, 2026Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303022FET400026541611BASE IDIQ$1K
Mar 24, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERHQTR0200204DNASW02008541611NEW HORIZON -- PLUTO MISSION PHASE B$2.4M
Mar 24, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG04EB99C336414TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION$1.2M
Mar 24, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG05EC87C541710LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE$450K
Mar 19, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA08C541330IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS.$4.0M
Mar 12, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM13AA38C541330PHASE A/B DEVELOPMENT OF THE JUICE ULTRAVIOLET SPECTROGRAPH IGF::CT,CL::IGF THE EUROPEAN SPACE AGENCY SELECTED THE JUPITER ICY MOONS EXPLORER (JUICE) MISSION AS THE FIRST MISSION IN ITS LARGE-CLASS MISSION PORTFOLIO UNDER THE COSMIC VISION PROGRAM. THE JUICE MISSION WILL INVESTIGATE JUPITER AND ITS ICY MOONS, COMPLETING ITS MISSION BY ORBITING GANYMEDE. THE MISSION IS PLANNED FOR LAUNCH IN 2022. THE NASA SCIENCE MISSION DIRECTORATE (SMD) HAS OFFERED TO COLLABORATE IN THIS MISSION. IN 2012, NASA ISSUED PROGRAM ELEMENT APPENDIX (PEA) K AS AN APPENDIX OF THE SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2)(NNH12ZDA006O-JUICE) ANNOUNCEMENT OF OPPORTUNITY (AO)(NNH12ZDA006O) FOR THE PURPOSE OF SOLICITING PROPOSALS FOR JUICE MISSION OF OPPORTUNITY (MO) INVESTIGATIONS TO BE MANAGED UNDER THE NASA NEW FRONTIERS PROGRAM. THE JUICE ULTRAVIOLET IMAGING SPECTROGRAPH (JUICE-UVS) IS A COMPLETE, STAND-ALONE INSTRUMENT PROPOSED AND SELECTED UNDER THE SALMON-2 AO, TO BE INCLUDED IN THE ESA JUICE PAYLOAD AS PART OF NASAS U.S. CONTRIBUTION, AND DEVELOPED BY THE SOUTHWEST RESEARCH INSTITUTE (SWRI) IN SAN ANTONIO, TX. THE LEADER OF THE JUICE-UVS TEAM IS THE PRINCIPAL INVESTIGATOR (PI), DR. RANDY GLADSTONE OF SWRI. THE GOALS OF THE JUICE-UVS INVESTIGATION ARE TO: 1) EXPLORE THE ATMOSPHERES, PLASMA INTERACTIONS, AND SURFACES OF THE GALILEAN SATELLITES; 2) DETERMINE THE DYNAMICS, CHEMISTRY, AND VERTICAL STRUCTURE OF JUPITERS UPPER ATMOSPHERE, FROM EQUATOR TO POLE, AS A TEMPLATE FOR GIANT PLANETS EVERYWHERE; AND 3) INVESTIGATE THE JUPITER-IO CONNECTION BY QUANTIFYING ENERGY AND MASS FLOW IN THE IO ATMOSPHERE, NEUTRAL CLOUDS, AND TORUS. THESE GOALS ARE CLOSELY ALIGNED TO THOSE DESCRIBED IN THE JUICE ASSESSMENT STUDY REPORT, AND ARE CONSISTENT WITH NASA GOALS IN THE MOST RECENT PLANETARY DECADAL SURVEY, THE EJSM STUDY REPORT, AND SMDS FORMAL GOALS DOCUMENTS.$392K
Mar 10, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310023F0131541715REVIEW OF STRUCTURAL DESIGN CODES AND STANDARDS TO INFORM THE UPDATING OF CURRENT REGULATORY GUIDANCE$40K
Mar 3, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG05EC87C541710LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE$150K
Feb 26, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERHQTR0200204DNASW02008541611NEW HORIZON -- PLUTO MISSION PHASE B$500K
Feb 25, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC24CA041541715JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING.$3.4M
Feb 24, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310024F0137541715RESEARCH AND GUIDANCE DEVELOPMENT ASSISTANCE ON INNOVATIVE METHODS AND TECHNOLOGIES TO ENHANCE SAFETY FOR DESIGN AND CONSTRUCTION OF NEW COMMERCIAL NUCLEAR POWER PLANTS$60K
Feb 24, 2026Department of EnergyNNSA NON-MO CNTRCTNG OPS DIV89233124CNA000374541330APEX DEVELOPMENT, DESIGN, FABRICATION, TESTING AND INSTALLATION FOR THE OFFICE OF DEFENSE NUCLEAR NONPROLIFERATION$2.2M
Feb 23, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG04EB99C336414TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION$2.0M
Feb 20, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310023F0142541715TECHNICAL ASSISTANCE FOR DEVELOPMENT OF REGULATORY AND TECHNICAL ANALYSES SUPPORTING 10 CFR PART 61$60K
Feb 17, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM13AA38C541330PHASE A/B DEVELOPMENT OF THE JUICE ULTRAVIOLET SPECTROGRAPH IGF::CT,CL::IGF THE EUROPEAN SPACE AGENCY SELECTED THE JUPITER ICY MOONS EXPLORER (JUICE) MISSION AS THE FIRST MISSION IN ITS LARGE-CLASS MISSION PORTFOLIO UNDER THE COSMIC VISION PROGRAM. THE JUICE MISSION WILL INVESTIGATE JUPITER AND ITS ICY MOONS, COMPLETING ITS MISSION BY ORBITING GANYMEDE. THE MISSION IS PLANNED FOR LAUNCH IN 2022. THE NASA SCIENCE MISSION DIRECTORATE (SMD) HAS OFFERED TO COLLABORATE IN THIS MISSION. IN 2012, NASA ISSUED PROGRAM ELEMENT APPENDIX (PEA) K AS AN APPENDIX OF THE SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2)(NNH12ZDA006O-JUICE) ANNOUNCEMENT OF OPPORTUNITY (AO)(NNH12ZDA006O) FOR THE PURPOSE OF SOLICITING PROPOSALS FOR JUICE MISSION OF OPPORTUNITY (MO) INVESTIGATIONS TO BE MANAGED UNDER THE NASA NEW FRONTIERS PROGRAM. THE JUICE ULTRAVIOLET IMAGING SPECTROGRAPH (JUICE-UVS) IS A COMPLETE, STAND-ALONE INSTRUMENT PROPOSED AND SELECTED UNDER THE SALMON-2 AO, TO BE INCLUDED IN THE ESA JUICE PAYLOAD AS PART OF NASAS U.S. CONTRIBUTION, AND DEVELOPED BY THE SOUTHWEST RESEARCH INSTITUTE (SWRI) IN SAN ANTONIO, TX. THE LEADER OF THE JUICE-UVS TEAM IS THE PRINCIPAL INVESTIGATOR (PI), DR. RANDY GLADSTONE OF SWRI. THE GOALS OF THE JUICE-UVS INVESTIGATION ARE TO: 1) EXPLORE THE ATMOSPHERES, PLASMA INTERACTIONS, AND SURFACES OF THE GALILEAN SATELLITES; 2) DETERMINE THE DYNAMICS, CHEMISTRY, AND VERTICAL STRUCTURE OF JUPITERS UPPER ATMOSPHERE, FROM EQUATOR TO POLE, AS A TEMPLATE FOR GIANT PLANETS EVERYWHERE; AND 3) INVESTIGATE THE JUPITER-IO CONNECTION BY QUANTIFYING ENERGY AND MASS FLOW IN THE IO ATMOSPHERE, NEUTRAL CLOUDS, AND TORUS. THESE GOALS ARE CLOSELY ALIGNED TO THOSE DESCRIBED IN THE JUICE ASSESSMENT STUDY REPORT, AND ARE CONSISTENT WITH NASA GOALS IN THE MOST RECENT PLANETARY DECADAL SURVEY, THE EJSM STUDY REPORT, AND SMDS FORMAL GOALS DOCUMENTS.$35K
Feb 12, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC20C0053336419SOLAR ORBITER SPICE PHASES E/F EFFORT$100K
Feb 11, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC25CA035334516SUPRATHERMAL ION SPECTROGRAPH PHASE E INSTRUMENT FOR SOLAR ORBITER MISSION$300K
Feb 4, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERHQTR0200204DNASW02008541611NEW HORIZON -- PLUTO MISSION PHASE B$127K
Feb 2, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG05EC87C541710LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE$300K
Jan 29, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG04EB99C336414TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION$800K
Jan 29, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310023F0142541715TECHNICAL ASSISTANCE FOR DEVELOPMENT OF REGULATORY AND TECHNICAL ANALYSES SUPPORTING 10 CFR PART 61$102K
Jan 28, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310025F0103541715RADIOLOGICAL CONSEQUENCES DUE TO A CHLORIDE-INDUCED STRESS CORROSION CRACKING DEFECT IN A DRY CASK STORAGE SYSTEM$70K
Jan 23, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310023F0131541715REVIEW OF STRUCTURAL DESIGN CODES AND STANDARDS TO INFORM THE UPDATING OF CURRENT REGULATORY GUIDANCE$50K
Jan 22, 2026Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA124F0024541715RESEARCH, DEVELOPMENT TEST AND EVALUATION OF TEST ARTICLES$200K
Jan 22, 2026Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA225FE006541715SUNSPEAR II: AGENT DEFEAT TESTING$730K
Jan 22, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA08C541330IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS.$1.9M
Jan 20, 2026Department of Transportation693JJ3 ACQUISITION AND GRANTS MGT693JJ324C000013541330AWARD CONTRACT NEXT GEN. LIQUEFACTION PROJECT DATABASE AND MODEL DEVELOPMENT IN SUPPORT OF IMPROVED LIQUEFACTION HAZARD ASSESSMENTS$140K
Jan 14, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC20C0060336414THE SPACE WEATHER FOLLOW ON (SWFO-L1) MISSION MAGNETOMETER SUITE (MAG) JOINT UNDERTAKING BETWEEN NASA AND NOAA.$250K
Jan 14, 2026Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA124F0029541715ALTERNATE SIGNATURES AND MULTI-MISSION, MODULAR UNMANNED PAYLOAD.$1.0M
Jan 13, 2026Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA124F0021541715ENGINEERING, TEST, AND EVALUATION - PROJECT ARES$2.8M
Jan 13, 2026Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA123F0009541715ENGINEERING SERVICES$987K
Jan 12, 2026Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310023F0032541715CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES (CNWRA) MANAGEMENT AND INFRASTRUCTURE-RELATED ACTIVITIES (MINIMUM GUARANTEE)$100K
Jan 12, 2026Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA224F0002541715ENGINEERING SERVICES$2.1M
Jan 9, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC25CA023336414SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS.$6.5M
Jan 8, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM09AA24C541712STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS OF NASAS PLANETARY SCIENCE PROGRAM.$779K
Jan 7, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG05EC87C541710LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE$350K
Jan 6, 2026Department of DefenseDEFENSE THREAT REDUCTION AGENCYHDTRA125FE013541715THE PURPOSE FOR THIS REQUIREMENT IS TO PROVIDE ENGINEERING AND TECHNICAL SUPPORT TO PROCURE, DESIGN, DEVELOP AND HOST TEST ARTICLES THAT WILL AIDE IN THE VERIFICATION AND VALIDATION OF RESEARCH AND DEVELOPMENT CAPABILITIES FOR PROJECT SIREN.$1.3M
Dec 30, 2025Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION31310025C0023541380RADIOCHEMICAL SAMPLE ANALYSIS SUPPORT FOR DECOMMISSIONING SITES$90K

Get Alerted Before Southwest Research Institute's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free