Federal Contractor Profile
Southwest Research Institute
$1.98B obligated·1,105 awards·15 agencies·62 NAICS
Federal Contracts
Showing contracts 1–50 of 2,733 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Apr 23, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310023F0142 | 541715 | TECHNICAL ASSISTANCE FOR DEVELOPMENT OF REGULATORY AND TECHNICAL ANALYSES SUPPORTING 10 CFR PART 61 | $100K |
| Apr 21, 2026 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC25PA983 | 541380 | RAMAN SPECTROSCOPIC INSTRUMENT TESTING AND FIELD TEST LOGISTICS | $15K |
| Apr 15, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC20C0053 | 336419 | SOLAR ORBITER SPICE PHASES E/F EFFORT | $350K |
| Apr 13, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310024F0137 | 541715 | RESEARCH AND GUIDANCE DEVELOPMENT ASSISTANCE ON INNOVATIVE METHODS AND TECHNOLOGIES TO ENHANCE SAFETY FOR DESIGN AND CONSTRUCTION OF NEW COMMERCIAL NUCLEAR POWER PLANTS | $112K |
| Apr 10, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310024F0140 | 541715 | DEVELOPMENT OF ANNOTATED DOCUMENTS FOR SRPS AND SELECT RGS FOR NRC REVIEW OF [1] STORAGE AND [2] TRANSPORTATION OF SPENT NUCLEAR FUEL AND RADIOACTIVE MATERIALS APPLICATIONS | $410K |
| Apr 9, 2026 | Department of EnergyHEADQUARTERS PROCUREMENT SERVICES | 89303022FET400026 | 541611 | BASE IDIQ | $1.0M |
| Apr 8, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310023F0032 | 541715 | CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES (CNWRA) MANAGEMENT AND INFRASTRUCTURE-RELATED ACTIVITIES (MINIMUM GUARANTEE) | $260K |
| Apr 2, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310023F0143 | 541715 | TECHNICAL ASSISTANCE FOR REVIEW OF THE DOE NON HIGH LEVEL WASTE DETERMINATIONS | $365K |
| Apr 2, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM09AA24C | 541712 | STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS OF NASAS PLANETARY SCIENCE PROGRAM. | $705K |
| Apr 2, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC25CA025 | 336414 | DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. | $1.2M |
| Mar 31, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310025C0023 | 541380 | RADIOCHEMICAL SAMPLE ANALYSIS SUPPORT FOR DECOMMISSIONING SITES | $34K |
| Mar 30, 2026 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC26P0417 | 513210 | NUMERICAL PROPULSION SYSTEM SIMULATION (NPSS) CONSORTIUM SUPPORT FY26 | $32K |
| Mar 25, 2026 | Department of EnergyHEADQUARTERS PROCUREMENT SERVICES | 89303022FET400026 | 541611 | BASE IDIQ | $1K |
| Mar 24, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | HQTR0200204DNASW02008 | 541611 | NEW HORIZON -- PLUTO MISSION PHASE B | $2.4M |
| Mar 24, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG04EB99C | 336414 | TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | $1.2M |
| Mar 24, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG05EC87C | 541710 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE | $450K |
| Mar 19, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM16AA08C | 541330 | IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS. | $4.0M |
| Mar 12, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM13AA38C | 541330 | PHASE A/B DEVELOPMENT OF THE JUICE ULTRAVIOLET SPECTROGRAPH IGF::CT,CL::IGF THE EUROPEAN SPACE AGENCY SELECTED THE JUPITER ICY MOONS EXPLORER (JUICE) MISSION AS THE FIRST MISSION IN ITS LARGE-CLASS MISSION PORTFOLIO UNDER THE COSMIC VISION PROGRAM. THE JUICE MISSION WILL INVESTIGATE JUPITER AND ITS ICY MOONS, COMPLETING ITS MISSION BY ORBITING GANYMEDE. THE MISSION IS PLANNED FOR LAUNCH IN 2022. THE NASA SCIENCE MISSION DIRECTORATE (SMD) HAS OFFERED TO COLLABORATE IN THIS MISSION. IN 2012, NASA ISSUED PROGRAM ELEMENT APPENDIX (PEA) K AS AN APPENDIX OF THE SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2)(NNH12ZDA006O-JUICE) ANNOUNCEMENT OF OPPORTUNITY (AO)(NNH12ZDA006O) FOR THE PURPOSE OF SOLICITING PROPOSALS FOR JUICE MISSION OF OPPORTUNITY (MO) INVESTIGATIONS TO BE MANAGED UNDER THE NASA NEW FRONTIERS PROGRAM. THE JUICE ULTRAVIOLET IMAGING SPECTROGRAPH (JUICE-UVS) IS A COMPLETE, STAND-ALONE INSTRUMENT PROPOSED AND SELECTED UNDER THE SALMON-2 AO, TO BE INCLUDED IN THE ESA JUICE PAYLOAD AS PART OF NASAS U.S. CONTRIBUTION, AND DEVELOPED BY THE SOUTHWEST RESEARCH INSTITUTE (SWRI) IN SAN ANTONIO, TX. THE LEADER OF THE JUICE-UVS TEAM IS THE PRINCIPAL INVESTIGATOR (PI), DR. RANDY GLADSTONE OF SWRI. THE GOALS OF THE JUICE-UVS INVESTIGATION ARE TO: 1) EXPLORE THE ATMOSPHERES, PLASMA INTERACTIONS, AND SURFACES OF THE GALILEAN SATELLITES; 2) DETERMINE THE DYNAMICS, CHEMISTRY, AND VERTICAL STRUCTURE OF JUPITERS UPPER ATMOSPHERE, FROM EQUATOR TO POLE, AS A TEMPLATE FOR GIANT PLANETS EVERYWHERE; AND 3) INVESTIGATE THE JUPITER-IO CONNECTION BY QUANTIFYING ENERGY AND MASS FLOW IN THE IO ATMOSPHERE, NEUTRAL CLOUDS, AND TORUS. THESE GOALS ARE CLOSELY ALIGNED TO THOSE DESCRIBED IN THE JUICE ASSESSMENT STUDY REPORT, AND ARE CONSISTENT WITH NASA GOALS IN THE MOST RECENT PLANETARY DECADAL SURVEY, THE EJSM STUDY REPORT, AND SMDS FORMAL GOALS DOCUMENTS. | $392K |
| Mar 10, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310023F0131 | 541715 | REVIEW OF STRUCTURAL DESIGN CODES AND STANDARDS TO INFORM THE UPDATING OF CURRENT REGULATORY GUIDANCE | $40K |
| Mar 3, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG05EC87C | 541710 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE | $150K |
| Feb 26, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | HQTR0200204DNASW02008 | 541611 | NEW HORIZON -- PLUTO MISSION PHASE B | $500K |
| Feb 25, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC24CA041 | 541715 | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. | $3.4M |
| Feb 24, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310024F0137 | 541715 | RESEARCH AND GUIDANCE DEVELOPMENT ASSISTANCE ON INNOVATIVE METHODS AND TECHNOLOGIES TO ENHANCE SAFETY FOR DESIGN AND CONSTRUCTION OF NEW COMMERCIAL NUCLEAR POWER PLANTS | $60K |
| Feb 24, 2026 | Department of EnergyNNSA NON-MO CNTRCTNG OPS DIV | 89233124CNA000374 | 541330 | APEX DEVELOPMENT, DESIGN, FABRICATION, TESTING AND INSTALLATION FOR THE OFFICE OF DEFENSE NUCLEAR NONPROLIFERATION | $2.2M |
| Feb 23, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG04EB99C | 336414 | TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | $2.0M |
| Feb 20, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310023F0142 | 541715 | TECHNICAL ASSISTANCE FOR DEVELOPMENT OF REGULATORY AND TECHNICAL ANALYSES SUPPORTING 10 CFR PART 61 | $60K |
| Feb 17, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM13AA38C | 541330 | PHASE A/B DEVELOPMENT OF THE JUICE ULTRAVIOLET SPECTROGRAPH IGF::CT,CL::IGF THE EUROPEAN SPACE AGENCY SELECTED THE JUPITER ICY MOONS EXPLORER (JUICE) MISSION AS THE FIRST MISSION IN ITS LARGE-CLASS MISSION PORTFOLIO UNDER THE COSMIC VISION PROGRAM. THE JUICE MISSION WILL INVESTIGATE JUPITER AND ITS ICY MOONS, COMPLETING ITS MISSION BY ORBITING GANYMEDE. THE MISSION IS PLANNED FOR LAUNCH IN 2022. THE NASA SCIENCE MISSION DIRECTORATE (SMD) HAS OFFERED TO COLLABORATE IN THIS MISSION. IN 2012, NASA ISSUED PROGRAM ELEMENT APPENDIX (PEA) K AS AN APPENDIX OF THE SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2)(NNH12ZDA006O-JUICE) ANNOUNCEMENT OF OPPORTUNITY (AO)(NNH12ZDA006O) FOR THE PURPOSE OF SOLICITING PROPOSALS FOR JUICE MISSION OF OPPORTUNITY (MO) INVESTIGATIONS TO BE MANAGED UNDER THE NASA NEW FRONTIERS PROGRAM. THE JUICE ULTRAVIOLET IMAGING SPECTROGRAPH (JUICE-UVS) IS A COMPLETE, STAND-ALONE INSTRUMENT PROPOSED AND SELECTED UNDER THE SALMON-2 AO, TO BE INCLUDED IN THE ESA JUICE PAYLOAD AS PART OF NASAS U.S. CONTRIBUTION, AND DEVELOPED BY THE SOUTHWEST RESEARCH INSTITUTE (SWRI) IN SAN ANTONIO, TX. THE LEADER OF THE JUICE-UVS TEAM IS THE PRINCIPAL INVESTIGATOR (PI), DR. RANDY GLADSTONE OF SWRI. THE GOALS OF THE JUICE-UVS INVESTIGATION ARE TO: 1) EXPLORE THE ATMOSPHERES, PLASMA INTERACTIONS, AND SURFACES OF THE GALILEAN SATELLITES; 2) DETERMINE THE DYNAMICS, CHEMISTRY, AND VERTICAL STRUCTURE OF JUPITERS UPPER ATMOSPHERE, FROM EQUATOR TO POLE, AS A TEMPLATE FOR GIANT PLANETS EVERYWHERE; AND 3) INVESTIGATE THE JUPITER-IO CONNECTION BY QUANTIFYING ENERGY AND MASS FLOW IN THE IO ATMOSPHERE, NEUTRAL CLOUDS, AND TORUS. THESE GOALS ARE CLOSELY ALIGNED TO THOSE DESCRIBED IN THE JUICE ASSESSMENT STUDY REPORT, AND ARE CONSISTENT WITH NASA GOALS IN THE MOST RECENT PLANETARY DECADAL SURVEY, THE EJSM STUDY REPORT, AND SMDS FORMAL GOALS DOCUMENTS. | $35K |
| Feb 12, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC20C0053 | 336419 | SOLAR ORBITER SPICE PHASES E/F EFFORT | $100K |
| Feb 11, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC25CA035 | 334516 | SUPRATHERMAL ION SPECTROGRAPH PHASE E INSTRUMENT FOR SOLAR ORBITER MISSION | $300K |
| Feb 4, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | HQTR0200204DNASW02008 | 541611 | NEW HORIZON -- PLUTO MISSION PHASE B | $127K |
| Feb 2, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG05EC87C | 541710 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE | $300K |
| Jan 29, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG04EB99C | 336414 | TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | $800K |
| Jan 29, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310023F0142 | 541715 | TECHNICAL ASSISTANCE FOR DEVELOPMENT OF REGULATORY AND TECHNICAL ANALYSES SUPPORTING 10 CFR PART 61 | $102K |
| Jan 28, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310025F0103 | 541715 | RADIOLOGICAL CONSEQUENCES DUE TO A CHLORIDE-INDUCED STRESS CORROSION CRACKING DEFECT IN A DRY CASK STORAGE SYSTEM | $70K |
| Jan 23, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310023F0131 | 541715 | REVIEW OF STRUCTURAL DESIGN CODES AND STANDARDS TO INFORM THE UPDATING OF CURRENT REGULATORY GUIDANCE | $50K |
| Jan 22, 2026 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA124F0024 | 541715 | RESEARCH, DEVELOPMENT TEST AND EVALUATION OF TEST ARTICLES | $200K |
| Jan 22, 2026 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA225FE006 | 541715 | SUNSPEAR II: AGENT DEFEAT TESTING | $730K |
| Jan 22, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM16AA08C | 541330 | IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS. | $1.9M |
| Jan 20, 2026 | Department of Transportation693JJ3 ACQUISITION AND GRANTS MGT | 693JJ324C000013 | 541330 | AWARD CONTRACT NEXT GEN. LIQUEFACTION PROJECT DATABASE AND MODEL DEVELOPMENT IN SUPPORT OF IMPROVED LIQUEFACTION HAZARD ASSESSMENTS | $140K |
| Jan 14, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC20C0060 | 336414 | THE SPACE WEATHER FOLLOW ON (SWFO-L1) MISSION MAGNETOMETER SUITE (MAG) JOINT UNDERTAKING BETWEEN NASA AND NOAA. | $250K |
| Jan 14, 2026 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA124F0029 | 541715 | ALTERNATE SIGNATURES AND MULTI-MISSION, MODULAR UNMANNED PAYLOAD. | $1.0M |
| Jan 13, 2026 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA124F0021 | 541715 | ENGINEERING, TEST, AND EVALUATION - PROJECT ARES | $2.8M |
| Jan 13, 2026 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA123F0009 | 541715 | ENGINEERING SERVICES | $987K |
| Jan 12, 2026 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310023F0032 | 541715 | CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES (CNWRA) MANAGEMENT AND INFRASTRUCTURE-RELATED ACTIVITIES (MINIMUM GUARANTEE) | $100K |
| Jan 12, 2026 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA224F0002 | 541715 | ENGINEERING SERVICES | $2.1M |
| Jan 9, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC25CA023 | 336414 | SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS. | $6.5M |
| Jan 8, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM09AA24C | 541712 | STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS OF NASAS PLANETARY SCIENCE PROGRAM. | $779K |
| Jan 7, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG05EC87C | 541710 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE | $350K |
| Jan 6, 2026 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA125FE013 | 541715 | THE PURPOSE FOR THIS REQUIREMENT IS TO PROVIDE ENGINEERING AND TECHNICAL SUPPORT TO PROCURE, DESIGN, DEVELOP AND HOST TEST ARTICLES THAT WILL AIDE IN THE VERIFICATION AND VALIDATION OF RESEARCH AND DEVELOPMENT CAPABILITIES FOR PROJECT SIREN. | $1.3M |
| Dec 30, 2025 | Nuclear Regulatory CommissionNUCLEAR REGULATORY COMMISSION | 31310025C0023 | 541380 | RADIOCHEMICAL SAMPLE ANALYSIS SUPPORT FOR DECOMMISSIONING SITES | $90K |
Get Alerted Before Southwest Research Institute's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free