Federal Contractor Profile
Systems Technology, INC
$44M obligated·155 awards·8 agencies·12 NAICS
Federal Contracts
Showing award actions 101–150 of 191 funded award actions, most recent first.
- Contracts with positive obligations
- 155
- Funded award actions shown
- 191
- Obligations shown
- $44M
- Awarding agencies
- 8
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of July 23, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 12, 2020 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0863 | 541715 | PROGRESS REPORT | $100K |
| Aug 7, 2020 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC20C0411 | 541715 | USE OF PILOT MODELS TO SUPPORT DESIGN ANALYSIS AND CERTIFICATION OF UAM VEHICLES | $125K |
| Jun 23, 2020 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0433 | 541715 | RESEARCH AND DEVELOPMENT: SBIR PH 2 | $393K |
| Jun 19, 2020 | Department of DefenseFA5587 48 CONS (ADMIN ONLY NO REQ) | FA558720F0151 | 611420 | EMERGENCY PARACHUTING TRAINING (EPT) SIMULATOR | $494K |
| Jun 5, 2020 | Department of DefenseHQ USASOC CONTRACTING | H9223920F0069 | 611420 | PARASIM MOTORIZED FRAME | $250K |
| May 20, 2020 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0614 | 541715 | SBIR PHASE I TOPIC NASA 16-2 | $360K |
| Apr 22, 2020 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0092 | 541715 | RESEARCH AND DEVELOPMENT, SBIR PHASE II, IGF::OT::IGF | $250K |
| Feb 11, 2020 | Department of DefenseHQ USASOC CONTRACTING | H9223920F0037 | 611420 | PARACHUTE TRAINING SIMULATOR PARTS AND UPDATES | $265K |
| Sep 30, 2019 | Department of DefenseFA2521 45 CONS PK | FA252119FA339 | 611420 | PARASIM UPGRADE | $71K |
| Sep 30, 2019 | Department of DefenseFA6648 482 LSS LGC | FA664819FA008 | 611420 | PARASIM SIMULATOR | $48K |
| Sep 28, 2019 | Department of DefenseFA4877 355 CONS PK | FA487719PA170 | 611420 | PARASIM V6 UPGRADE | $99K |
| Sep 25, 2019 | Department of DefenseHQ USASOC CONTRACTING | H9223919F0126 | 611420 | PARACHUTE TRAINING SIMULATOR PARTS AND UPDATES | $103K |
| Sep 24, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0863 | 541715 | PROGRESS REPORT | $140K |
| Sep 20, 2019 | Department of DefenseFA4855 27 SOCONS LGC | FA485519CA026 | 333318 | THE PARACHUTE SIMULATOR SYSTEM (PARASIM) IS A PROPRIETARY SYSTEM CREATED BY SYSTEMS TECHNOLOGY, INC (STI). | $121K |
| Sep 18, 2019 | Department of DefenseW7M3 USPFO ACTIVITY GA ARNG | W912JM19P0222 | 611512 | PARACHUTE TRAINING SIMULATOR | $185K |
| Aug 13, 2019 | Department of DefenseSOCCENT | H9227718F0005 | 611420 | PARASIM | $52K |
| Aug 13, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0614 | 541715 | SBIR PHASE I TOPIC NASA 16-2 | $375K |
| Aug 9, 2019 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC19C0357 | 541715 | FLEXIBLE FIGHT DYNAMICS AND CONTROL-ENHANCED AIRCRAFT MULTIDISCIPLINARY DESIGN OPTIMIZATION | $125K |
| Jul 1, 2019 | Department of DefenseFA5682 31 CONS (UNIT 6102) | FA568219FA020 | 611420 | PARASIM EQUIPMENT, INSTALLATION, AND TRAINING. | $56K |
| Jun 26, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0433 | 541715 | RESEARCH AND DEVELOPMENT: SBIR PH 2 | $600K |
| Jun 4, 2019 | Department of AgricultureUSDA FOREST SERVICE | 129A7319F0004 | 611420 | IGF::CT::IGF - PARASIM VERSION 6 SYSTEM SOFTWARE UPGRADE TO INCLUDE SERVICE AND EQUIPMENT | $91K |
| Jun 4, 2019 | Department of DefenseSOCCENT | H9227718F0005 | 611420 | PARASIM | $20K |
| May 29, 2019 | Department of DefenseW6QM MICC-FT KNOX | W9124D19F0107 | 611420 | PARASIM 6 SYSTEM UPGRADE | $86K |
| May 20, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0101 | 541715 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $359K |
| Apr 12, 2019 | Department of Transportation692M15 ACQUISITION & GRANTS, AAQ600 | 692M1518C00010 | 333318 | "A STUDY OF ENVELOPE PROTECTION APPROACHES AND ADVANCED FLIGHT CONTROL MODES FOR PROTECTION AGAINST LOSS OF CONTROL IN PART 23 AIRPLANES" | $24K |
| Mar 26, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0101 | 541715 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $375K |
| Feb 21, 2019 | Department of DefenseW6QM MICC-FT KNOX | W9124D19F0107 | 611420 | PARASIM 6 SYSTEM UPGRADE | $86K |
| Feb 4, 2019 | Department of Veterans Affairs247-NETWORK CONTRACT OFFICE 7 (36C247) | 36C24719F0311 | 611420 | DRIVE SIMULATION EQUIPMENT | $73K |
| Jan 31, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0350 | 541715 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $100K |
| Dec 13, 2018 | Department of DefenseW6QM MICC-FT CARSON | W911RZ16F1C06 | 611420 | IGF::OT::IGF | $5K |
| Nov 9, 2018 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001415C0117 | 541712 | IGF::CT::IGF ADVANCED HELO DISPLAY FOR ZERO-ZERO SHIPBOARD LANDINGS | $375K |
| Oct 16, 2018 | Department of DefenseFA8651 AFRL RWK | FA865119P0011 | 541715 | EVOLUTIONARY DESIGN OPTIMIZATION FOR GUIDED WEAPON CONCEPTS | $150K |
| Sep 30, 2018 | Department of DefenseFA4608 2 CONS LGC | FA460818F3066 | 611420 | FREEFALL SIMULATOR | $243K |
| Sep 28, 2018 | Department of DefenseFA6712 911 AW LGC | FA671218F0015 | 611420 | FIDO X3 MIL KITS | $108K |
| Sep 28, 2018 | Department of DefenseFA6712 911 AW LGC | FA671218F0016 | 611420 | PARASIM VERSION #6 | $53K |
| Sep 24, 2018 | Department of DefenseFA5215 766 ESS PKP | FA521518F8067 | 611420 | PARASIM ASSETS UPGRADES- KADENA | $780K |
| Sep 18, 2018 | Department of DefenseSOCCENT | H9227718F0005 | 611420 | PARASIM | $132K |
| Sep 17, 2018 | Department of DefenseFA4620 92 CONS LGC | FA462018FA072 | 611420 | PARACHUTE SIMULATOR UPGRADE | $115K |
| Sep 17, 2018 | Department of DefenseW6QM MICC-FT CARSON | W911RZ18P0113 | 611420 | CLINICAL DRIVING SIMULATOR | $75K |
| Aug 31, 2018 | Department of DefenseFA6633 934 AW PK | FA663318PA003 | 334111 | PARASIM V6 SYSTEM UPGRADE | $55K |
| Aug 30, 2018 | Department of DefenseFA4608 2 CONS LGC | FA460818F3057 | 611420 | PARASIM SYSTEM UPGRADE | $178K |
| Aug 27, 2018 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC17P1042 | 541712 | IGF::OT::IGFTHE OVERALL OBJECTIVES OF THIS RESEARCH EFFORT ARE TO IDENTIFY SAFETY CONCERNS FOR UAV OPERATION IN THE NAS (INCLUDING LOC), INVESTIGATE THE APPLICABILITY OF LOC PREVENTION AND RECOVERY TECHNOLOGIES FOR UAV OPERATIONS, AND TO ESTABLISH A METHODOLOGY FOR EVALUATING THEIR RESILIENCE UNDER UNCERTAIN, UNEXPECTED, AND HAZARDOUS CONDITIONS. AS PART OF THIS EFFORT, SAFE-CUE WILL BE INVESTIGATED FOR LOC PREVENTION IN REMOTELY PILOTED UAS AIRCRAFT, WHERE PIO SUSCEPTIBILITY MAY BE HEIGHTENED BY TRANSPORT DELAYS AND THE LACK OF SENSORY INFORMATION AVAILABLE TO ONBOARD PILOTS. IN ORDER TO ACCOMPLISH THIS RESEARCH, AND DUE TO THE LACK OF ANALYSIS RELATED TO UAS SAFETY, THE FOLLOWING SPECIFIC TASKS ARE IDENTIFIED: 1.) PERFORM AN ANALYSIS OF UAV ACCIDENTS AND INCIDENTS (I.E., MISHAPS) THAT HAVE OCCURRED TO DATE (CIVIL AND MILITARY); 2.) IDENTIFY FUTURE SAFETY HAZARDS RELATED TO UAS OPERATION IN THE NATIONAL AIRSPACE SYSTEM (NAS); 3.) DEVELOP A SET OF HAZARDSBASED TEST SCENARIOS THAT CAN BE USED IN THE DEVELOPMENT AND EVALUATION OF UAS TECHNOLOGIES FOR RESILIENCE UNDER UNCERTAIN, UNEXPECTED, AND HAZARDOUS CONDITIONS; 4.) DETERMINE THE APPLICABILITY OF SAFE-CUE TO THE MITIGATION OF KEY UAS HAZARDS (AS IDENTIFIED IN TASKS 1 - 2); AND 5.) EXTEND (AS NECESSARY), IMPLEMENT, AND EVALUATE SAFE-CUE FOR LOC PREVENTION AND/OR RECOVERY IN UAS UTILIZING THE HAZARDS-BASED TEST SCENARIOS DEVELOPED IN TASK 3 (OR AN APPROPRIATE SUBSET THEREIN). THE RESULTS OF THIS STUDY WILL DEMONSTRATE THE USE OF HAZARDS-BASED TEST SCENARIOS TO ENSURE UAS SAFETY AND RESILIENCE UNDER UNCERTAIN, UNEXPECTED, AND HAZARDOUS CONDITIONS. | $70K |
| Aug 20, 2018 | Department of Transportation692M15 ACQUISITION & GRANTS, AAQ600 | 692M1518C00010 | 333318 | "A STUDY OF ENVELOPE PROTECTION APPROACHES AND ADVANCED FLIGHT CONTROL MODES FOR PROTECTION AGAINST LOSS OF CONTROL IN PART 23 AIRPLANES" | $326K |
| Aug 17, 2018 | Department of DefenseFA9302 AFTC PZZ | FA930218P5123 | 511210 | MIST IADS SOFTWARE ENHANCEMENT | $167K |
| Aug 1, 2018 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001418C1009 | 541715 | SBIR II AWARD | $541K |
| Jun 29, 2018 | Department of DefenseFA4877 355 CONS PK | FA487718F0119 | 611420 | PARASIM 6 EQUIPMENT/INSTALLATION UPGRADE | $128K |
| Jun 26, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833517C0611 | 541712 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $100K |
| Apr 30, 2018 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC18C0134 | 541715 | INTEGRATION OF UNMANNED AERIAL SYSTEMS (UAS) INTO THE US NATIONAL AIRSPACE (NAS) IS CRUCIAL FOR ADVANCEMENT OF UAS APPLICATIONS IN DIFFERENT FIELDS LIKE TRANSPORT, SURVEILLANCE, DISASTER MANAGEMENT, AND GEOSPATIAL APPLICATIONS. AIRWORTHINESS CERTIFICATION BY THE FEDERAL AVIATION ADMINISTRATION (FAA) IS A CRITICAL STEP TOWARDS NAS INTEGRATION. TO MATCH THE EXPECTED FAA SAFETY AND RELIABILITY STANDARDS FOR UAS CERTIFICATION, NOVEL TECHNOLOGIES ARE NEEDED. CONVENTIONAL MANNED AIR VEHICLES MEET FAA STANDARDS VIA HARDWARE REDUNDANCY, AN OPTION UNAVAILABLE FOR UAS DUE TO SIZE, WEIGHT, AND POWER CONSTRAINTS. THIS CHALLENGE WAS ADDRESSED IN PHASE I VIA THE SO-CALLED ALGORITHMICALLY REDUNDANT APPROACH, WHERE MULTIPLE FAULT DETECTION AND ISOLATION ALGORITHMS WORK IN PARALLEL TO DETECT FAULTS MORE RELIABLY. USING FAA-APPROVED PROCEDURES LIKE FAULT TREE ANALYSIS OR FAILURE MODES AND EFFECTS ANALYSIS, RELIABILITY OF ALGORITHMICALLY REDUNDANT SYSTEMS IS COMPUTED. THIS APPROACH WILL BE EXTENDED IN PHASE II TO INCLUDE FLIGHT CONTROL SYSTEM HARDWARE AND CONTROL LAWS IN THE LOOP, AND WILL INVOLVE VALIDATION VIA FLIGHT TESTING. A COMPREHENSIVE METHODOLOGY AND ACCOMPANYING SOFTWARE TOOLBOX WILL RESULT: STI APPROACH FOR FAULT ESTIMATION AND RELIABILITY FOR UAS (SAFER-UAS). SAFER-UAS IS AN OVERALL RELIABILITY ESTIMATION APPROACH BASED ON THEORETICAL ANALYSIS, SIMULATION RUNS, AND FLIGHT TESTS, SERVING AS A VITAL STEP TOWARD CERTIFICATION. | $750K |
| Apr 20, 2018 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001415C0117 | 541712 | IGF::CT::IGF ADVANCED HELO DISPLAY FOR ZERO-ZERO SHIPBOARD LANDINGS | $375K |
| Apr 19, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0350 | 541715 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $125K |
Get Alerted Before Systems Technology, INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free