Federal Contractor Profile
Veteran Design & Construction INC
Federal contracting record: $128M obligated across 82 awards from 4 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
JCZTEML8Z2W9
CAGE Code
7B6N6
Address
5523 RESEARCH PARK DR STE 110, BALTIMORE, MD, 212284679
First Federal Award
Aug 11, 2016
Most Recent Award
Sep 18, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Veterans Affairs$123M
96.2% of total obligations
- Department of Health and Human Services$2.9M
2.2% of total obligations
- Department of Commerce$1.9M
1.5% of total obligations
- Department of Defense$119K
0.1% of total obligations
Top NAICS Activity
- $84M
- $29M
- $8.1M
- $5.1M
- $2.2M
- $119K
- $11K
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Sep 18, 2026 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | C201830 ELEVEN AREAS AT BLDG. 29B PERIMETER HAVE AMBIENT EXPOSURE WITH NO HEATING | $88K |
| Sep 3, 2026 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | C202327 AIR COMPRESSOR | $67K |
| Aug 19, 2026 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | C201571 - BUILDING 15K HVAC R22 SPLIT-SYSTEM UPGRADE FEASIBILITY STUDY. | $19K |
| Jun 30, 2026 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | THE CENTRAL UTILITY PLANT (CUP) IS CRITICAL TO SUPPORTING CAMPUS-WIDE UTILITY SERVICES. THE REPLACEMENT OF THE PLANT MASTER IS BOTH A NECESSARY AND STRATEGIC INVESTMENT IN MAINTAINING OPERATIONAL RESILIENCE AND MODERNIZING CORE INFRASTRUCTURE. | $43K |
| Jun 4, 2026 | Department of CommerceDEPT OF COMMERCE NIST | 236220 | B233 FLOOR TRENCH COVER AND LAB WASTE LINE REPLACEMENT | $76K |
| Apr 29, 2026 | Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245) | 236220 | PROJECT#512-23-102 REPLACE SWITCHGEAR AND AUTO SWITCHES CONSTRUCTION. PROJECT WILL REPLACE OLD AND INSTALL NEW SWITCHGEARS AND AUTO SWITCHES. | $325K |
| Apr 29, 2026 | Department of Veterans Affairs244-NETWORK CONTRACT OFFICE 4 (36C244) | 236220 | IGF::OT::IGF RENOVATE BUILDING 1 GROUND FLOOR EAST AND 3RD FLOOR | $88K |
| Mar 10, 2026 | Department of Veterans Affairs244-NETWORK CONTRACT OFFICE 4 (36C244) | 236220 | IGF::OT::IGF RENOVATE BUILDING 1 GROUND FLOOR EAST AND 3RD FLOOR | $88K |
| Feb 27, 2026 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | C201571 - BUILDING 15K HVAC R22 SPLIT-SYSTEM UPGRADE FEASIBILITY STUDY. | $15K |
| Feb 6, 2026 | Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245) | 236220 | PROJECT#512-26-901 CORRECT PLUMBING CROSS CONNECTIONS. THE PROJECT IS TO IDENTIFY AND REPLACE ANY VALVES/PIPES THAT ARE BROKEN. | $998K |
| Feb 6, 2026 | Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | 541310 | OT::IGF::OT UPDATE MENTAL HEALTH DESIGN STANDARDS | $479K |
| Jan 22, 2026 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | THE CENTRAL UTILITY PLANT (CUP) IS CRITICAL TO SUPPORTING CAMPUS-WIDE UTILITY SERVICES. THE REPLACEMENT OF THE PLANT MASTER IS BOTH A NECESSARY AND STRATEGIC INVESTMENT IN MAINTAINING OPERATIONAL RESILIENCE AND MODERNIZING CORE INFRASTRUCTURE. | $12K |
| Dec 17, 2025 | Department of CommerceDEPT OF COMMERCE NIST | 236220 | B233 FLOOR TRENCH COVER AND LAB WASTE LINE REPLACEMENT | $6K |
| Sep 30, 2025 | Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245) | 541330 | LR WATER MAIN PIPING WITH TREATMENT BUILDINGS | $53K |
| Sep 24, 2025 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | C201571 - BUILDING 15K HVAC R22 SPLIT-SYSTEM UPGRADE FEASIBILITY STUDY. | $120K |
| Sep 18, 2025 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | DESIGN SERVICES MEDICAL AIR (CRC) AND MEDICAL VACUUM (CRC AND ACRF) SYSTEMS REPLACEMENT - ALTERNATE #2, SEPARATE DLM | $27K |
| Sep 12, 2025 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | C109385 - DESIGN CONTRACT TO CORRECT BUILDING 35 MECHANICAL ROOM VENTILATION DEFICIENCIES. | $152K |
| Jul 11, 2025 | Department of Veterans Affairs244-NETWORK CONTRACT OFFICE 4 (36C244) | 236220 | IGF::OT::IGF RENOVATE BUILDING 1 GROUND FLOOR EAST AND 3RD FLOOR | $97K |
| Jul 7, 2025 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | THE CENTRAL UTILITY PLANT (CUP) IS CRITICAL TO SUPPORTING CAMPUS-WIDE UTILITY SERVICES. THE REPLACEMENT OF THE PLANT MASTER IS BOTH A NECESSARY AND STRATEGIC INVESTMENT IN MAINTAINING OPERATIONAL RESILIENCE AND MODERNIZING CORE INFRASTRUCTURE. | $190K |
| Jul 2, 2025 | Department of CommerceDEPT OF COMMERCE NIST | 236220 | B233 FLOOR TRENCH COVER AND LAB WASTE LINE REPLACEMENT | $9K |
| Jun 23, 2025 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 541330 | C109648 DESIGN OF SPRINKLER PROTECTION IN AREAS THAT CURRENTLY DON'T HAVE IT IN BUILDING 10. | $209K |
| Apr 23, 2025 | Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245) | 236220 | PROJECT#512-23-102 REPLACE SWITCHGEAR AND AUTO SWITCHES CONSTRUCTION. PROJECT WILL REPLACE OLD AND INSTALL NEW SWITCHGEARS AND AUTO SWITCHES. | $14M |
| Apr 15, 2025 | Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245) | 541330 | DESIGN - LOCH RAVEN BOILER REPLACEMENT | $617 |
| Feb 27, 2025 | Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | 237990 | CAPE CANAVERAL NATIONAL CEMETERY EXPANSION PHASE 2. | $7K |
| Feb 27, 2025 | Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | 237990 | CAPE CANAVERAL NATIONAL CEMETERY EXPANSION PHASE 2. | $4K |
Want to win work like Veteran Design & Construction INC?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.