Skip to content

Federal Contractor Profile

Williams Construction & Cabinetry, INC.

$110M obligated·112 awards·3 agencies·10 NAICS

Federal Contracts

Showing award actions 51–100 of 157 funded award actions, most recent first.

Contracts with positive obligations
112
Funded award actions shown
157
Obligations shown
$110M
Awarding agencies
3

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of November 4, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Apr 16, 2024Department of AgricultureUSDA-FS, CSA EAST 1212445224C0012237990GAOA - ROAD PAVING, WATERLINE CONSTRUCTION, CMU BUILDING CONSTRUCTION, RESERVOIR REPAIRS, DRAINAGE CULVERT AND STRUCTURE REPLACEMENT$1.9M
Mar 27, 2024Department of AgricultureUSDA-FS, CSA EAST 1212445224F0012237310GAOA SINK MTN BOAT LAUNCH RECONSTRUCTION SACC IDIQ$297K
Feb 27, 2024Department of AgricultureUSDA-FS, CSA EAST 1212445224C0009237310SCOPE: CONSTRUCTION OF 1,975 LINEAL FEET OF NEW TRAIL-BYPASS SECTION, LOCATED ON THE SOUTHERN PORTION. CONSTRUCTION OF 3,840 LINEAL FEET OF NEW TRAIL -REROUTE SECTION, LOCATED ON THE NORTHERN PORTION.$562K
Feb 20, 2024Department of AgricultureUSDA-FS, CSA EAST 1212445224F0013237310SCOPE: THE PROJECT WILL REQUIRE EMERGENCY ROCK AND WOODY DEBRIS REMOVAL FROM THE ROADWAY ON NFSR 148, COLD SPRINGS RD TO GOVERNMENT DESIGNATED SITES WITHIN 5 MILES OF THE PROJECT SITES.$64K
Feb 2, 2024Department of AgricultureUSDA-FS, CSA EAST 1212445224F0012237310GAOA SINK MTN BOAT LAUNCH RECONSTRUCTION SACC IDIQ$836K
Dec 20, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0117237310NATIONAL FOREST SERVICE ROAD 311, BUCK BALD ROAD RECONDITIONING$4K
Sep 28, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0186236220BALLAST, GRAVEL, CLEANOUT CULVERTS ACROSS 68 MILES OF CROATAN RD ROADS$4.8M
Sep 21, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0117237310NATIONAL FOREST SERVICE ROAD 311, BUCK BALD ROAD RECONDITIONING$50K
Sep 20, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0081236220CONSTRUCTION OF CONCRETE SLAB AND PICNIC SHELTER, UTILIZING A REINFORCED CONCRETE FOUNDATION AND POST & BEAM STRUCTURE, PER PLANS AND SPECIFICATIONS.$66K
Sep 15, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0078237310LITTLE CITICO CREEK CULVERT REPLACEMENT SACC IDIQ TO$860K
Sep 14, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0073236220PROJECT: CHEOAH POINT BEACH RETAINING WALL CONSTRUCTION LOCATION: USDA FOREST SERVICE, CHEOAH RANGER DISTRICT 1070 MASSEY BRANCH ROAD ROBBINSVILLE NC 28771$56K
Sep 6, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0071236220GAOA: PARKSVILLE WELL AND WATER SYSTEM$1.6M
Aug 16, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0038236220SCOPE: REPLACE ROOFING, GUTTERS, AND DECKS ON MULTIPLE BUILDINGS, REPAIR AND IMPROVE DRAINAGE AROUND MULTIPLE BUILDINGS AND REMOVE HAZARD TREES THAT POSE A DANGER TO EMPLOYEES, VISITORS AND FACILITY BUILDINGS.$6K
Aug 14, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0117237310NATIONAL FOREST SERVICE ROAD 311, BUCK BALD ROAD RECONDITIONING$371K
Aug 9, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0058237310WHITE OAK FLATS DESIGN-BUILD ERFO PROJECT (IDIQ)$1.6M
Jul 25, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0045237310WEST WOLF CREEK ROAD ERFO DESIGN-REPAIR PROJECT$177K
Jul 24, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0024237310FLATWOODS NFSR 87 ERFO REPAIRS OF FLOOD DAMAGE FROM STORMS OCCURRED IN FEBRUARY 2019. THIS PROJECT ADDRESSES DAMAGE ON 6.39 MILES OF NATIONAL FOREST SYSTEM ROAD (NFSR) 87. THE WORK WILL CONSIST OF CULVERT REPLACEMENT, ROAD RECONDITIONING, AGGREGATE S$720K
Jul 18, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0071237310TS FRED DISASTER - PISGAH ROAD REPAIRS$386K
Jun 1, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0038236220SCOPE: REPLACE ROOFING, GUTTERS, AND DECKS ON MULTIPLE BUILDINGS, REPAIR AND IMPROVE DRAINAGE AROUND MULTIPLE BUILDINGS AND REMOVE HAZARD TREES THAT POSE A DANGER TO EMPLOYEES, VISITORS AND FACILITY BUILDINGS.$635K
May 31, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0002237310SITE PREP$41K
May 31, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445222F0104237310THE PROJECT WILL ADDRESS NUMEROUS ISSUES THAT HAVE DEVELOPED OVER TIME INCLUDING TRAFFIC CIRCULATION, BOAT LAUNCH WIDTH AND GEOMETRY, BOAT DOCK INSTALLATION AND REPLACEMENT, ACCESSIBILITY, PARKING, AND DRAINAGE. THE PROJECT ALSO ADDRESSES PROBLEMS WI$173K
May 30, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0019237310HORSE CREEK-HOUSTON VALLEY DESIGN BUILD ERFO PROJECT$343K
May 23, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0024237310FLATWOODS NFSR 87 ERFO REPAIRS OF FLOOD DAMAGE FROM STORMS OCCURRED IN FEBRUARY 2019. THIS PROJECT ADDRESSES DAMAGE ON 6.39 MILES OF NATIONAL FOREST SYSTEM ROAD (NFSR) 87. THE WORK WILL CONSIST OF CULVERT REPLACEMENT, ROAD RECONDITIONING, AGGREGATE S$1.7M
May 15, 2023Department of the InteriorFWS, CONSTRUCTION A/E TEAM 2140FC223F0030236220VA-GR DISMAL SWAMP NWR-ROAD REPAIR$493K
May 10, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0071237310TS FRED DISASTER - PISGAH ROAD REPAIRS$647K
May 2, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0019237310HORSE CREEK-HOUSTON VALLEY DESIGN BUILD ERFO PROJECT$1.0M
May 1, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445222F0057236220CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO DRILL, DEVELOP, CASE, GROUT, AND TEST A 6-1/4 WATER WELL AT A DESIGNATED LOCATION.$11K
Apr 5, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0054236220NATIONAL FORESTS IN NORTH CAROLINA, CROATAN NATIONAL FOREST, NFSR 126 GREAT LAKE ROAD REPAIRS$2.1M
Mar 31, 2023Department of the InteriorFWS, GAOA140FGA23D0142236220MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR DESIGN-BUILD CONSTRUCTION SERVICES FOR THE DEPARTMENT OF INTERIOR AND FOREST SERVICE$500
Mar 30, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0012236220THE PURPOSE OF THIS PROJECT IS TO REPLACE THE WINDOWS AND WINDOW TRIM OF PANTHER TOP TOWER AND STOP ALL WATER INFILTRATION. THIS PROJECT ALSO INCLUDES PAINTING THE OUTSIDE OF THE TOWER, AND OPTIONS FOR REPLACING THE FLOORING & BASEBOARD AND PAIN$10K
Mar 9, 2023Department of AgricultureUSDA-FS, CSA EAST 1212445223F0012236220THE PURPOSE OF THIS PROJECT IS TO REPLACE THE WINDOWS AND WINDOW TRIM OF PANTHER TOP TOWER AND STOP ALL WATER INFILTRATION. THIS PROJECT ALSO INCLUDES PAINTING THE OUTSIDE OF THE TOWER, AND OPTIONS FOR REPLACING THE FLOORING & BASEBOARD AND PAIN$48K
Feb 28, 2023Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0002237310SITE PREP$31K
Dec 19, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445223F0004236220GAOA REPAIR/REPLACEMENT OF GUARDRAIL ON MULLINIX RD.$10K
Nov 18, 2022Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441923F0002237310SITE PREP$379K
Nov 2, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0042237310BRRD OHV SYSTEM TRAILS RTP GRANT$106K
Sep 30, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0104237310THE PROJECT WILL ADDRESS NUMEROUS ISSUES THAT HAVE DEVELOPED OVER TIME INCLUDING TRAFFIC CIRCULATION, BOAT LAUNCH WIDTH AND GEOMETRY, BOAT DOCK INSTALLATION AND REPLACEMENT, ACCESSIBILITY, PARKING, AND DRAINAGE. THE PROJECT ALSO ADDRESSES PROBLEMS WI$1.3M
Sep 28, 2022Department of AgricultureUSDA FOREST SERVICE-SPOC EAST12441922F0076237310ROAD REPAIRS NANTAHALA NATIONAL FOREST$737K
Sep 27, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0057236220CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO DRILL, DEVELOP, CASE, GROUT, AND TEST A 6-1/4 WATER WELL AT A DESIGNATED LOCATION.$47K
Sep 15, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0100237310FM HURRICANE DORIAN ROAD REPAIRS S-179, 190, 202, 212B, 251F, 220, 151$939K
Sep 8, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0084115310THIS TASK ORDER WILL PROVIDE FOR THE CONSTRUCTION OF A RETAINING WALL AT JOYCE KILMER, WITH AN OPTION FOR CONSTRUCTION OF A SET OF STAIRS AT JENKINS MEADOW.$91K
Aug 29, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0037237310REPAIR FLOOD DAMAGE FROM FEB 2019 ERFO STORM EVENT, 9.5 MILES 39 & 50$48K
Aug 22, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0075237310WILDCAT ROAD ERFO REPAIR DESIGN-BUILD PROJECT$747K
Aug 15, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0073237310PUSH / PULL OVER APPROXIMATELY 150 TO 200 TREES IN THE PROJECT AREA TO BE ADDED TO THE STREAM CHANNEL ON THE LITTLE CITICO CREEK LOCATED ON CHEROKEE NATIONAL FOREST LANDS, TN. SEE ATTACHED STATEMENT OF WORK FOR DETAILS.$90K
Aug 4, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0070236220FRANCIS ROAD RANGER DISTRICT ROAD MAINTENANCE PROJECT$237K
Jul 19, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0024236220REMOVE AND REPLACE EXISTING WATER AND SEPTIC SYSTEMS, RECONSTRUCTION OF CHIMNEY, AND REPLACEMENT OF FRONT ENTRY DOORS AND GLAZING.$6K
Jul 6, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0057236220CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO DRILL, DEVELOP, CASE, GROUT, AND TEST A 6-1/4 WATER WELL AT A DESIGNATED LOCATION.$42K
Jun 8, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0042237310BRRD OHV SYSTEM TRAILS RTP GRANT$260K
Jun 2, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0024236220REMOVE AND REPLACE EXISTING WATER AND SEPTIC SYSTEMS, RECONSTRUCTION OF CHIMNEY, AND REPLACEMENT OF FRONT ENTRY DOORS AND GLAZING.$53K
May 16, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0037237310REPAIR FLOOD DAMAGE FROM FEB 2019 ERFO STORM EVENT, 9.5 MILES 39 & 50$1.6M
Apr 1, 2022Department of AgricultureUSDA-FS, CSA EAST 1212445222F0024236220REMOVE AND REPLACE EXISTING WATER AND SEPTIC SYSTEMS, RECONSTRUCTION OF CHIMNEY, AND REPLACEMENT OF FRONT ENTRY DOORS AND GLAZING.$75K

Get Alerted Before Williams Construction & Cabinetry, INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free