Federal Contractor Profile
Williams International CO LLC
$82M obligated·63 awards·2 agencies·15 NAICS
Federal Contracts
Showing award actions 101–126 of 126 funded award actions, most recent first.
- Contracts with positive obligations
- 63
- Funded award actions shown
- 126
- Obligations shown
- $82M
- Awarding agencies
- 2
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of July 21, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Dec 13, 2017 | Department of DefenseDLA AVIATION | SPE5E318P0210 | 339991 | 8505023095!O-RING | $25K |
| Oct 31, 2017 | Department of DefenseDLA AVIATION | SPE5E818P0401 | 339991 | 8504892742!O-RING | $12K |
| Oct 2, 2017 | Department of DefenseDLA AVIATION | SPE5E818P0061 | 339991 | 8504810787!O-RING | $14K |
| Sep 27, 2017 | Department of DefenseDLA AVIATION | SPE5E817P4446 | 339991 | 8504793175!O-RING | $14K |
| Jul 18, 2017 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | NNC16TA02T | 336412 | IGF::OT::IGF TASK ORDER NNC16TA02T FOR PREPARATIONS TO INTEGRATE WJ38-15 TURBINE ENGINE WITH COMBINED CYCLE ENGINE LARGE-SCALE INLET FOR MODE TRANSITION EXPERIMENTS (CCE-LIMX). NASA IS INTERESTED IN CONCEPTS AND TECHNOLOGIES WHICH WILL ENABLE A TURBINE-BASED COMBINED CYCLE (TBCC) HYPERSONIC FLIGHT VEHICLE. TO THAT END, PHASE 4 OF THE CCE-LIMX WOULD INVOLVE AN INTEGRATED INLET TEST WITH AN OPERATING TURBINE ENGINE. NASA CURRENTLY POSSESSES A WI WJ38-15 TURBINE ENGINE THAT WAS SPECIFICALLY MODIFIED TO BE SUITED TO THIS APPLICATION. IN CONJUNCTION WITH NASA, WI MODIFIED THEIR WJ38 SUBSONIC ENGINE TO EXPAND ITS OPERATING CAPABILITIES AND MAKE IT SUITABLE FOR TESTING AT MACH 3. THE ENGINE HAS BEEN FITTED WITH A DISTORTION TOLERANT FAN STAGE (THAT EMPLOYS GOVERNMENT TECHNOLOGY), AN ALTERED BYPASS DUCT, HIGH-TEMPERATURE LINERS, AN OIL MIST LUBRICATED FRONT BEARING, AND AN AFTERBURNER. NASA GLENN RESEARCH CENTER (GRC) ALSO POSSESSES A SINGLE EXPANSION RAMP NOZZLE (SERN) DESIGNED TO OPERATE WITH THE ENGINE FOR CCE-LIMX TESTING. THE TASK ORDER IS FOR: 1) A CYCLE DECK EXECUTABLE, COMPATIBLE WITH THE DSPACE SYSTEM TO BE USED IN PHASE 3 OF THE COMBINED CYCLE ENGINE LARGE-SCALE INLET MODE TRANSITION EXPERIMENT (CCE-LIMX), TO CALCULATE PERFORMANCE OUTPUTS FOR THE WJ38-15 ENGINE AT VARIOUS TUNNEL AND INLET CONDITIONS, 2) THE REDESIGN, FABRICATION, AND INSTALLATION OF AN OIL MIST LUBRICATED REAR BEARING ON THE WJ38-15 ENGINE, CURRENTLY AT THE GRC 10X10 SUPERSONIC WIND TUNNEL (SWT) FACILITY, REPLACING THE CURRENT GREASE-PACKED BEARING, 3) DELIVERY OF A CONTROL SYSTEM, FUEL SYSTEM, AND IGNITION SYSTEM WITH CONTROL PANELS, CONTROL VALVES, FUEL PUMPS, IGNITION SYSTEM, BLEED VALVES, AND BYPASS VALVES, AND 4) TECHNICAL SUPPORT FOR THE INSTALLATION OF THE WJ38-15 INTO THE NASA GRC 10X10 SWT FOR PHASE 4 OF CCE-LIMX, AND TECHNICAL SUPPORT DURING PHASE 4 OF CCE-LIMX TESTING, AND TECHNICAL SUPPORT INCLUDING NECESSARY CORRESPONDENCE, DOCUMENTATION, AND ANALYSIS FOR THE DESIGN OF THE CCE STRONGBACK AND CCE INTEGRATED NOZZLE. | $178K |
| May 15, 2017 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | EFFICIENT SMALL SCALE PROPULSION (ESSP) CORE ENGINE DEMONSTRATOR FABRICATION AND TESTING | $225K |
| Mar 17, 2017 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | IGF::OT::IGF NEW TO: HIGH PRESSURE TURBINE THERMAL IMAGING AND PROGNOSTIC PROGRAM | $148K |
| Feb 28, 2017 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0009 | 541712 | SUPERSONIC TURBINE ENGINE FOR LONG RANGE (STELR) DEMO | $2.1M |
| Feb 28, 2017 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | IGF::OT::IGF NEW TO: HIGH PRESSURE TURBINE THERMAL IMAGING AND PROGNOSTIC PROGRAM | $100K |
| Jan 24, 2017 | Department of DefenseDLA AVIATION | SPE5E817P1471 | 332722 | 8504034393!WASHER,RECESSED | $80K |
| Jan 24, 2017 | Department of DefenseDLA AVIATION | SPE5E817P1473 | 332722 | 8504034654!NUT,SELF-LOCKING,RO | $39K |
| Sep 21, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0009 | 541712 | SUPERSONIC TURBINE ENGINE FOR LONG RANGE (STELR) DEMO | $203K |
| Sep 20, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0009 | 541712 | SUPERSONIC TURBINE ENGINE FOR LONG RANGE (STELR) DEMO | $923K |
| Sep 14, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | EFFICIENT SMALL SCALE PROPULSION (ESSP) CORE ENGINE DEMONSTRATOR FABRICATION AND TESTING | $50K |
| Sep 9, 2016 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | NNC16TA02T | 336412 | IGF::OT::IGF TASK ORDER NNC16TA02T FOR PREPARATIONS TO INTEGRATE WJ38-15 TURBINE ENGINE WITH COMBINED CYCLE ENGINE LARGE-SCALE INLET FOR MODE TRANSITION EXPERIMENTS (CCE-LIMX). NASA IS INTERESTED IN CONCEPTS AND TECHNOLOGIES WHICH WILL ENABLE A TURBINE-BASED COMBINED CYCLE (TBCC) HYPERSONIC FLIGHT VEHICLE. TO THAT END, PHASE 4 OF THE CCE-LIMX WOULD INVOLVE AN INTEGRATED INLET TEST WITH AN OPERATING TURBINE ENGINE. NASA CURRENTLY POSSESSES A WI WJ38-15 TURBINE ENGINE THAT WAS SPECIFICALLY MODIFIED TO BE SUITED TO THIS APPLICATION. IN CONJUNCTION WITH NASA, WI MODIFIED THEIR WJ38 SUBSONIC ENGINE TO EXPAND ITS OPERATING CAPABILITIES AND MAKE IT SUITABLE FOR TESTING AT MACH 3. THE ENGINE HAS BEEN FITTED WITH A DISTORTION TOLERANT FAN STAGE (THAT EMPLOYS GOVERNMENT TECHNOLOGY), AN ALTERED BYPASS DUCT, HIGH-TEMPERATURE LINERS, AN OIL MIST LUBRICATED FRONT BEARING, AND AN AFTERBURNER. NASA GLENN RESEARCH CENTER (GRC) ALSO POSSESSES A SINGLE EXPANSION RAMP NOZZLE (SERN) DESIGNED TO OPERATE WITH THE ENGINE FOR CCE-LIMX TESTING. THE TASK ORDER IS FOR: 1) A CYCLE DECK EXECUTABLE, COMPATIBLE WITH THE DSPACE SYSTEM TO BE USED IN PHASE 3 OF THE COMBINED CYCLE ENGINE LARGE-SCALE INLET MODE TRANSITION EXPERIMENT (CCE-LIMX), TO CALCULATE PERFORMANCE OUTPUTS FOR THE WJ38-15 ENGINE AT VARIOUS TUNNEL AND INLET CONDITIONS, 2) THE REDESIGN, FABRICATION, AND INSTALLATION OF AN OIL MIST LUBRICATED REAR BEARING ON THE WJ38-15 ENGINE, CURRENTLY AT THE GRC 10X10 SUPERSONIC WIND TUNNEL (SWT) FACILITY, REPLACING THE CURRENT GREASE-PACKED BEARING, 3) DELIVERY OF A CONTROL SYSTEM, FUEL SYSTEM, AND IGNITION SYSTEM WITH CONTROL PANELS, CONTROL VALVES, FUEL PUMPS, IGNITION SYSTEM, BLEED VALVES, AND BYPASS VALVES, AND 4) TECHNICAL SUPPORT FOR THE INSTALLATION OF THE WJ38-15 INTO THE NASA GRC 10X10 SWT FOR PHASE 4 OF CCE-LIMX, AND TECHNICAL SUPPORT DURING PHASE 4 OF CCE-LIMX TESTING, AND TECHNICAL SUPPORT INCLUDING NECESSARY CORRESPONDENCE, DOCUMENTATION, AND ANALYSIS FOR THE DESIGN OF THE CCE STRONGBACK AND CCE INTEGRATED NOZZLE. | $559K |
| Jul 12, 2016 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | NNC16TA02T | 336412 | IGF::OT::IGF TASK ORDER NNC16TA02T FOR PREPARATIONS TO INTEGRATE WJ38-15 TURBINE ENGINE WITH COMBINED CYCLE ENGINE LARGE-SCALE INLET FOR MODE TRANSITION EXPERIMENTS (CCE-LIMX). NASA IS INTERESTED IN CONCEPTS AND TECHNOLOGIES WHICH WILL ENABLE A TURBINE-BASED COMBINED CYCLE (TBCC) HYPERSONIC FLIGHT VEHICLE. TO THAT END, PHASE 4 OF THE CCE-LIMX WOULD INVOLVE AN INTEGRATED INLET TEST WITH AN OPERATING TURBINE ENGINE. NASA CURRENTLY POSSESSES A WI WJ38-15 TURBINE ENGINE THAT WAS SPECIFICALLY MODIFIED TO BE SUITED TO THIS APPLICATION. IN CONJUNCTION WITH NASA, WI MODIFIED THEIR WJ38 SUBSONIC ENGINE TO EXPAND ITS OPERATING CAPABILITIES AND MAKE IT SUITABLE FOR TESTING AT MACH 3. THE ENGINE HAS BEEN FITTED WITH A DISTORTION TOLERANT FAN STAGE (THAT EMPLOYS GOVERNMENT TECHNOLOGY), AN ALTERED BYPASS DUCT, HIGH-TEMPERATURE LINERS, AN OIL MIST LUBRICATED FRONT BEARING, AND AN AFTERBURNER. NASA GLENN RESEARCH CENTER (GRC) ALSO POSSESSES A SINGLE EXPANSION RAMP NOZZLE (SERN) DESIGNED TO OPERATE WITH THE ENGINE FOR CCE-LIMX TESTING. THE TASK ORDER IS FOR: 1) A CYCLE DECK EXECUTABLE, COMPATIBLE WITH THE DSPACE SYSTEM TO BE USED IN PHASE 3 OF THE COMBINED CYCLE ENGINE LARGE-SCALE INLET MODE TRANSITION EXPERIMENT (CCE-LIMX), TO CALCULATE PERFORMANCE OUTPUTS FOR THE WJ38-15 ENGINE AT VARIOUS TUNNEL AND INLET CONDITIONS, 2) THE REDESIGN, FABRICATION, AND INSTALLATION OF AN OIL MIST LUBRICATED REAR BEARING ON THE WJ38-15 ENGINE, CURRENTLY AT THE GRC 10X10 SUPERSONIC WIND TUNNEL (SWT) FACILITY, REPLACING THE CURRENT GREASE-PACKED BEARING, 3) DELIVERY OF A CONTROL SYSTEM, FUEL SYSTEM, AND IGNITION SYSTEM WITH CONTROL PANELS, CONTROL VALVES, FUEL PUMPS, IGNITION SYSTEM, BLEED VALVES, AND BYPASS VALVES, AND 4) TECHNICAL SUPPORT FOR THE INSTALLATION OF THE WJ38-15 INTO THE NASA GRC 10X10 SWT FOR PHASE 4 OF CCE-LIMX, AND TECHNICAL SUPPORT DURING PHASE 4 OF CCE-LIMX TESTING, AND TECHNICAL SUPPORT INCLUDING NECESSARY CORRESPONDENCE, DOCUMENTATION, AND ANALYSIS FOR THE DESIGN OF THE CCE STRONGBACK AND CCE INTEGRATED NOZZLE. | $1.3M |
| Jul 7, 2016 | Department of DefenseDLA AVIATION | SPE4A716M7893 | 332999 | 8503185460!EXHAUST SYSTEM, AIRCRAFT ENGI | $45K |
| May 17, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | EFFICIENT SMALL SCALE PROPULSION (ESSP) CORE ENGINE DEMONSTRATOR FABRICATION AND TESTING | $50K |
| Apr 21, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | IGF::OT::IGF NEW TO: HIGH PRESSURE TURBINE THERMAL IMAGING AND PROGNOSTIC PROGRAM | $200K |
| Mar 24, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | IGF::OT::IGF NEW TO: HIGH PRESSURE TURBINE THERMAL IMAGING AND PROGNOSTIC PROGRAM | $700K |
| Jan 19, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0009 | 541712 | SUPERSONIC TURBINE ENGINE FOR LONG RANGE (STELR) DEMO | $2.8M |
| Jan 12, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | EFFICIENT SMALL SCALE PROPULSION (ESSP) CORE ENGINE DEMONSTRATOR FABRICATION AND TESTING | $1.3M |
| Jan 12, 2016 | Department of DefenseDLA AVIATION | SPE5EJ16M0413 | 339991 | 8502808960!SEAL,LABYRINTH-BURN | $19K |
| Dec 18, 2015 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0005 | 541712 | EFFICIENT SMALL SCALE PROPULSION (ESSP) CORE ENGINE DEMONSTRATOR FABRICATION AND TESTING | $81K |
| Nov 13, 2015 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | 0009 | 541712 | SUPERSONIC TURBINE ENGINE FOR LONG RANGE (STELR) DEMO | $3.3M |
| Oct 5, 2015 | Department of DefenseDLA AVIATION | SPE4A616M0280 | 332710 | 8502566928!FILLER,OIL MIST | $25K |
Get Alerted Before Williams International CO LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free