138th FW Base Wide Electrical Repairs

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
W50S8U26QA016
NAICS
238210
PSC
J059
Set-aside
Small Business Set Aside - Total
Posted
August 24, 2026
Response due
September 1, 2026
Place of performance
Tulsa, OK

What this opportunity is

The Department of Defense is seeking electrical repair services for various buildings at the 138th FW in Oklahoma, under NAICS 238210. This opportunity is set aside for small businesses, making it suitable for contractors specializing in electrical work. Interested bidders should note that this is a combined synopsis/solicitation, which requires tracking the notice for updates and potential bid submission details. A site visit is scheduled for August 26, which is critical for understanding the specific requirements and conditions of the project.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

RFIs - Electrical Project 1. Site Visit: Please let us know the available dates and times for a site visit. We would like to have our electrical subcontractor attend with us. Site visit will be held 10am 26 August. 2. Building 316 – WO# 202600581: Section 5.1.2 includes one entry stating the location is pending, while another entry under the same work order identifies Rooms 105, 110, 130A, and 120. Are these the same requirement, or are these separate repairs? Item 8 can be deleted; item 15 is the work requested 3. Building 402 – Classified Area – WO# 202600810: The PWS states that new lighting is to be installed. Can you provide the anticipated number and type of fixtures, or will this be determined during the site visit? 4. Lighting Fixtures: For locations stating "repair/replace" an inoperable fixture, should the contractor assume complete fixture replacement if repair is not practical? Are there Government-required fixture types, manufacturers, specifications, or LED standards that must be used? 5. Building 326 – Main OƯice and Tool Crib – WO# 202600311: The PWS references "several" inoperable light fixtures. Can you provide the approximate quantity, or will this be determined during the site visit? 6. Building 304 – 220V Outlet – WO# 202600137: Can you provide the required amperage, receptacle configuration/type, equipment load requirements, and approximate location of the electrical panel serving the new outlet? Evaluating panel capacity is part of this requirement 7. Building 318 – 440V Service – WO# 202600444: Is any additional information available regarding the existing problem with the 440V service, such as known symptoms, equipment being served, previous troubleshooting, panel information, or drawings? 8. Drawings and Panel Schedules: Are existing electrical drawings, one-line diagrams, panel schedules, or facility drawings available for any of the buildings included in the scope? 9. Weapons Vault and Classified Area Access: Are there any special security, escort, citizenship, background investigation, or personnel clearance requirements for contractors working in the building 402 Weapons Vault or Classified Area? Contractors are required to have a REAL ID and will have to pass a -- 1 of 4 -- background check to gain access to the base; they will also need to provide at least 48 hours’ notice of scheduled work in both areas to allow 138th CES to coordinate properly cleared escorts. 10. Base Access / Badging: Will Contractor and Subcontractor personnel require any special airport or installation badging to perform the work, such as a SIDA badge or other security credential? If so, what is the process and typical lead time for obtaining the required credentials? 11. Work Hours: The PWS states that services are to be provided between 0730 and 1700 Monday through Thursday. Please confirm whether all work is expected to be performed during these daytime hours. Will any work be required or permitted to be performed at night, after normal working hours, or on weekends due to facility operations, power shutdowns, security requirements, or other considerations? 12. Electrical Shutdowns: If electrical circuits or building services must be temporarily shut down to perform the work, will shutdowns need to occur after normal operating hours? Who will coordinate and authorize required shutdowns? 13. Period of Performance: The PWS states that the Period of Performance is 90 days from Notice to Proceed. Section F appears to contain the wording "90 Calendar Year." Can you please confirm that the required Period of Performance is 90 calendar days from Notice to Proceed? The required Period of Performance is 90 calendar days from Notice to Proceed. 14. Technical Capability: What documentation would you like oƯerors to provide to demonstrate Technical Capability? For example, should the quote include contractor licenses, resumes, project experience, technical approach, safety information, or other supporting documentation? The solicitation does not specify quote volumes, page limits, file formats, or naming conventions; however, to be "Acceptable," an oƯeror must demonstrate the ability to properly complete the work per the Statement of Work, RFI’s, and Government end goal. 15. Subcontractor Experience/Past Performance: If a contractor serves as the prime contractor and uses a qualified electrical subcontractor to perform the electrical field work, will the Government consider the qualifications, experience, and past performance of the proposed electrical subcontractor when evaluating Technical Capability and Past Performance? The Government will evaluate the qualifications of the prime contractor only, as the -- 2 of 4 -- resulting contract will be awarded solely to the prime contractor. Yes, 52.219-14 does apply. A subcontractor cannot exceed 75% of the contract. 16. Small Business Participation: What information should be included in the quote to satisfy the Small Business Participation evaluation factor? The prime contractor is a small business. 52.219-1 Small Business in SAM. 17. Limitations on Subcontracting: Does FAR 52.219-14 or another limitation on subcontracting requirement apply to this solicitation? If a contractor uses a small- business electrical contractor as its primary electrical subcontractor, please confirm whether that subcontracting arrangement is acceptable under this solicitation. 18. Disaster/Emergency Area Provisions: FAR 52.226-3 and 52.226-4 appear in the solicitation, but the designated geographic area is blank. Are these provisions applicable to this acquisition and is there any geographic residency requirement beyond the Total Small Business Set-Aside? We are not concerned about this clause, just disregard it. 19. Pricing Format: Section B identifies the requirement as one firm-fixed-price job. Please confirm that the Government is requesting one total lump sum price for completion of the entire PWS. Would you also like an itemized breakdown by work or

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238210)