Replace AAS BAK-15 Controls, B2001, B2003
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
FA302226R0011
NAICS
238210
PSC
Z2JZ
Set-aside
Small Business Set Aside - Total
Posted
August 24, 2026
Response due
September 3, 2026
Place of performance
Columbus, MS
Description
DESIGN-BUILD STATEMENT OF WORK
PROJECT NUMBER: EEPZ248317
Repair AAS BAK-15 Controls, B2001, B2003
COLUMBUS AFB, MISSISSIPPI
17 Mar 2026
-- 1 of 39 --
COLUMBUS AFB, MS EEPZ248317
Repair AAS BAK-15 Controls, B2001, B2003
PAGE 2 of 39
TABLE OF CONTENTS
NOMENCLATURE ........................................................................................................................ 4
1.1 ACRONYMS & ABBREVIATIONS................................................................................................ 4
1.2 BASIC TERMS ................................................................................................................................. 5
DESCRIPTION OF PROJECT ....................................................................................................... 6
2.1 SUMMARY (EXAMPLE BELOW) ................................................................................................. 6
2.2 BACKGROUND ............................................................................................................................... 6
2.3 SCOPE OF PROJECT ....................................................................................................................... 6
2.4 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS (DETAILS NOT ALWAYS
NECESSARY, IF NOT, SAY THE GOVERNMENT WILL NOT FURNISH ANYTHING FOR THIS
PROJECT; THIS IS AN EXAMPLE BELOW) ............................................... Error! Bookmark not defined.
2.5 SALVAGE (DETAILS NOT ALWAYS NECESSARY, IF NOT, SAY THE GOVERNMENT WILL
NOT SALVAGE ANYTHING FROM THIS PROJECT; THIS IS AN EXAMPLE BELOW)Error! Bookmark
not defined.
DESIGN REQUIREMENTS ........................................................................................................... 8
3.1 SUMMARY....................................................................................................................................... 8
3.2 NATURE/EXTENT OF DESIGN (CHANGE THIS FOR PROJECT SPECIFICS, EXAMPLE
BELOW) 8
3.3 RESPONSIBILITY ........................................................................................................................... 8
3.4 DESIGN STANDARDS (ADD ANY OTHER RELEVANT UFCs, CODES, AND STANDARDS)8
3.5 DRAWINGS ...................................................................................................................................... 9
3.6 DESIGN SUBMITTALS (CHECK DAYS IN RED IN SECTION 3.6.2) ...................................... 10
3.7 DESIGN REVIEWS ........................................................................................................................ 11
3.8 CONFERENCES ............................................................................................................................. 12
ADMINISTRATION OF CONSTRUCTION ............................................................................... 13
4.1 PERFORMANCE CAPABILITIES (VERIFY RED TEXT IN THIS SECTION ON EACH PROJECT)
13
4.2 COMMENCEMENT, PROSECUTION & COMPLETION (PERIOD OF PERFORMANCE IN 4.2.3)
14
4.3 SCHEDULING ................................................................................................................................ 15
4.4 MANAGING ................................................................................................................................... 17
4.5 MATERIAL SUBMITTALS AND SHOP DRAWINGS................................................................ 17
4.6 WORK BY GOVERNMENT .......................................................................................................... 19
4.7 PRE-FINAL AND FINAL INSPECTION ...................................................................................... 19
4.8 WARRANTY .................................................................................................................................. 20
4.9 CONTRACTOR OFFICE................................................................................................................ 21
4.10 CONSTRUCTION SITES ............................................................................................................... 22
4.11 CONSTRUCTION EQUIPMENT................................................................................................... 24
-- 2 of 39 --
COLUMBUS AFB, MS EEPZ248317
Repair AAS BAK-15 Controls, B2001, B2003
PAGE 3 of 39
4.12 AVAILABILITY OF UTILITY SERVICES AT JOB SITES......................................................... 24
4.13 TEMPORARY UTILITIES ............................................................................................................. 24
4.14 CONSTRUCTION SECURITY ...................................................................................................... 25
QUALITY REQUIREMENTS ...................................................................................................... 27
5.1 QUALITY CONTROL PLAN ........................................................................................................ 27
5.2 TESTING AND INSPECTION SERVICES ................................................................................... 28
5.3 MANUFACTURERS' FIELD SERVICES ..................................................................................... 29
5.4 PRODUCT REQUIREMENTS ....................................................................................................... 29
5.5 CLOSEOUT PROCEDURES.......................................................................................................... 30
SAFETY, HEALTH AND ENVIRONMENTAL PROTECTION ............................................... 32
6.1 SAFETY AND HEALTH ................................................................................................................ 32
6.2 GENERAL....................................................................................................................................... 32
6.3 HAZARDOUS MATERIAL ....................................................................…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238210)
138th FW Base Wide Electrical Repairs
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due September 1, 2026
B457 Hanger 2&4 120v Outlet
DEPT OF DEFENSE · Solicitation · due September 14, 2026
Ellsworth Theater Audio Repair
DEPT OF DEFENSE · Solicitation · due August 28, 2026
J059--MCC & Panelboards Replacement
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due September 2, 2026
Construction of Fire Protection System at Building C2 at Naval Weapons Station Earle, NJ
DEPT OF DEFENSE · Solicitation · due September 30, 2026
Fire Alarm Replacement Bldg 2318 & 2416
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 28, 2026