19 CONS Carpet Replacement
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
FA446026Q0040
NAICS
238330
PSC
7220
Set-aside
Small Business Set Aside - Total
Posted
August 3, 2026
Response due
August 11, 2026
Place of performance
Little Rock Air Force Base, AR
Description
CUI
CUI
PEFORMANCE WORK STATEMENT (PWS)
REMOVE, FURNISH AND INSTALL NEW FLOORING
BUILDINGS 642
1. DISCRIPTION OF SERVICES
1.1. The contractor shall provide all qualified personnel, transportation, tools, equipment,
materials and services required to remove the existing floor and cove base, furnish and install
new flooring and cove base at building 642 in selected areas. The contractor shall accomplish all
the services below to meet the requirements of this Performance Work Statement (PWS). Work
shall comply with all Federal, State and local regulations, codes and license requirements. Work
shall be accomplished within 45 days of the reception of material or 90 days of contract award.
1.2. The Government will neither supervise contractor employees nor control the method by
which the contractor performs the required tasks. It shall be the responsibility of the contractor to
manage its employees and to guard against any actions that are of the nature of personal services
or give the perception of personal services. If the contractor feels that any actions constitute, or
are perceived to constitute personal services, it shall be the contractor’s responsibility to notify
the Contracting Officer (CO) immediately. These services shall not be used to perform the work
of policy/decision making or management nature, (e.g., inherently governmental functions). All
decisions relative to programs supported by the contractor shall be the sole responsibility of the
Government.
2. SAFETY AND REGULATORY REQUIREMENTS
2.1. Building 642 is an administrative facility with over 100 personnel daily. This operation
shall require the contractor to work with a room-by-room installation and may have to work on
weekends to accomplish the task due to operations. The facility user shall provide contractor
escorts within the facilities for the duration of the operation.
2.2. Pre-Install Requirements: Before services commence, the contractor shall inspect the work
site and ascertain all information for the diligent performance of the service(s). The contractor
shall notify the ordering agency of any conditions that prevent the suitable completion of these
services to include operations that could endanger Government personnel or property and require
appropriate abatement action. If the contractor discovers problems associated with the work
after starting, he or she shall immediately notify the Contracting Officer (CO) for their approval
if the work is to continue. Coordinate with the Government designated representative to have
utilities/fire alarms etc…turned on or off during the competition of the task.
2.3. Disposal of waste: All waste disposals are the responsibility of the contractor to include
any fees or permits. Recycling is mandatory at Little Rock AFB and containers shall be
provided for the operation to dispose of cardboard, paper or any other recyclable material.
Coordinate through your government representative.
3 March 2026
-- 1 of 7 --
16 April 2026
CUI
CUI
2.4. All work shall be accomplished in accordance with all regulations regarding the installation
of flooring in commercial structures and flooring manufacturer specifications along with any
environmental regulations on disposal.
2.5. Storage of materials shall be the responsibility of the contractor to arrange with the facility
manager or to store off site. 19 CES is not responsible for the storage or the acceptance of
material deliveries to Little Rock AFB.
2.6. Carpet and adhesives furnished for this project must be purchased through the Air Force
Carpet II Program as a mandatory source. Carpet and adhesives picked below come from the
program.
https://usaf.dps.mil/sites/aficc/afcc/aficc/affcc/sitecollectiondocuments/carpet/carpethomepage.as
px
3. WORK REQUIREMENTS
3.1. General Installation: The contractor shall furnish and install commercial grade, Texture
Appearance Retention (TARR) method heavy duty or greater commercial grade modular carpet
as specified. All cove bases shall be in 120 linear feet rolls by the height and material described
unless otherwise specified. Manufacturer, style, and color of flooring are listed below. The
contractor is responsible for furnishing all manufacturers recommended adhesives, cove base
adhesive, track and caps, transitions, stair/stage edging etc. as part of the installation process in
colors specified to match cove base. All exact matches or like items shall meet the customer
criteria set forth below.
3.1.1. The contractor shall remove and dispose of an estimated 9,675 square feet of flooring and
1,837 linear feet of cove base from the facility. The contractor shall be responsible to
professionally remove and install all furniture to include modular and regular desks, file
cabinets, chairs, cubicles, and seating. The facility users shall be responsible for removing all
electronics, books, files, personal items and loose objects (Example: personal items, copiers,
printers, computers) in the area specified for floor replacement this contract. The contractor
shall provide a room by room phasing plan to the CO during the contract solicitation phase as a
part of their bid package for a smooth transition of the flooring removal process.
3.1.2. Preparation of Area: The contractor shall remove all old flooring material, cove base and
foreign matter from the surface to be covered, such as loose particles, dirt and grease prior to
installation of any floor coverings. Depressions, cracks, crevices, torn wall covering etc., shall
be properly prepared or attached in order to provide a level and true installation of the floor
covering. Extensive cleaning of and/or repairs to be covered shall be completely dry and free
from moisture prior to the installation. The contractor will ensure that the temperature of the
premises is proper to prevent buckling or shrinkage after installation is completed. Adhere to
flooring manufacturer’s specifications for installation.
3.1.3. Contractor shall furnish and install an estimated 9,67…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238330)
N055--INSTALLATION OF LVT FLOORING
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 26, 2026
Replace Flooring at USCG Base New Orleans Administrative Building
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 27, 2026
Flooring Abatement and Replacement
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due September 9, 2026
Z2JZ--Wellness Center Flooring Install / Service
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 14, 2026
Flooring and Carpet Services
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 14, 2026
Floor Replacement for the Albuquerque Indian Health Center, HIM Department
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 10, 2026