1.0 Introduction
1.1 Mission: The mission of 422 FSS at RAF Fairford is to provide high-quality, efficient, and compliant food
service facilities for military personnel, civilian staff, and contractors.
This requirement directly supports the Wing’s ability to sustain personnel readiness by delivering a modern,
permanent modular café building that meets commercial catering standards, enhances food safety, and improves
operational efficiency in food service delivery.
The ultimate expectation from the Contractor is the successful design, manufacture, delivery, installation,
commissioning, and handover of a fully functional, code-compliant permanent modular kitchen and café facility that
is ready for immediate operational use, supporting the daily food service needs of assigned personnel at RAF
Fairford.
1.2 Background: Existing food service infrastructure at RAF Fairford requires augmentation to meet current and
projected demand. Following detailed consultation with the mission partner, it was determined that a purpose-built
permanent modular café building represents the optimal balance of speed of delivery, quality, flexibility, and long-
term durability.
This project contributes to the overall mission by providing a modern, food-safe, energy-efficient kitchen and café
environment designed to current building regulations and commercial catering best practices. The facility will
reduce the risk of cross-contamination and support efficient lunch service and independent self-service operations
where applicable.
1.3 Scope: The Contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and
services necessary to design, manufacture, deliver, install, commission, and handover one (1) permanent modular
café building complete with integrated commercial kitchen and associated equipment.
The facility will be delivered to and installed at RAF Fairford, United Kingdom. The scope includes a robust non-
combustible galvanized steel-framed modular structure with food-safe internal finishes, extraction systems, non-slip
safety flooring, 500 Lux lighting, custom electrical points, external Plastisol finish in a Government-selected RAL
color, and a comprehensive package of commercial catering equipment to accommodate 3 cooks in daily operation
that serves 10 customers at a time.
The Contractor is responsible for off-site construction, delivery (including crane hire), internal fit-out, final utility
connections within the unit, testing, commissioning, training, and handover. All work shall be completed to current
UK Building Regulations standards or US Building Regulation, whichever standard is most onerous, with a 15-year
structural warranty and 12-month parts and labor warranty.
Desired outcomes include a fully operational, safe, and compliant café facility capable of supporting efficient food
service operations with minimized disruption during installation (target 15 working days for unit installation).
2.0 General Requirements
2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this
requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The
Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall
seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.
2.2 Contract Management & Administration
-- 2 of 7 --
Solicitation Number / Contract Number TBD
Insert Date, Mod #
2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and
responsibility to ensure effective management of resources assigned to the requirement. The Contractor
must maintain continuity between the mission partner and the contractor’s corporate offices.
2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to
effectively administer the contract. The Contractor shall respond to the Governments requests for
contractual actions in a timely fashion. The Contractor shall have a single point of contact between the
Government and contractor personnel assigned to support the contract. The Contractor shall assign
resources in order to maintain proper and accurate records related to this contract.
2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any
subcontractor management necessary to integrated work executed under this contract.
2.4 Hours of Work: Workdays are from Monday through Friday excluding US federal holidays and UK bank holidays.
Work hours are from 0800 to 1700 local UK time. If work must be completed outside of normal work hours, it will
be charged via cost variation.
3.0 Product Specifications
3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety
equipment, any other items and services necessary to provide the following:
- Quantity One (1) Each: Permanent Modular Café Building with integrated commercial kitchen, complete with all
features and equipment as detailed in this SOW and the Contractor’s technical proposal.
- Quantity One (1) Each: Groundworks for the Permanent Modular Café Building to include surveys, investigations,
excavation, drainage, ducts, connections to electrical and water mains, soft landscaping, clearance, and a concrete
foundation.
- Delivery to: RAF Fairford
3.2 Building Construction and Structure:
- Robust non-combustible galvanized steel frame construction, providing long-lasting premium performance.
- Exterior finish: Plastisol in a RAL color selected by the Government.
- Constructed to current…