43d Air Mobility Squadron_ Request for Proposal_FA445226R0012_B753 Kitchen Renovation
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
FA445226R0012
NAICS
236220
PSC
Z2JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 27, 2026
Response due
August 5, 2026
Place of performance
N TOPSAIL BEACH, NC
Description
Page 1 of 9
Statement of Work
Project Location: Building 753, 3541Surveyor St. Ft. Bragg, North Carolina
Contract Type: Construction
Project Description: Modernization of kitchen in Building 753
Project Number: P2-00101-26
Document Status: 09JUL2026
Prepared By: 43d AMOG, Business Office
-- 1 of 9 --
P2-00101-26 Modernization of kitchen in 753
Page 2 of 9
STATEMENT OF WORK
9JUL 2026
NOTE: ONLY CHECKED BOXES APPLY
Request for Construction Services: P2-00101-26 Modernization of Kitchen in B753
1. Description of Work: The contractor will furnish all Architecture and Engineering services,
labor, material, equipment, incidentals, supervision, and transportation for work necessary to
complete the modernization of the kitchen in building 753. All physical work shall be
completed in 30 calendar days. All work shall be performed in accordance with the contract
specifications, manufacturer’s recommendations, and UFC 1-200-01 and UFC 1-200-02.
Work performed under this task order shall comply with the latest edition of all required
publications, Federal, Department of the Army, State of North Carolina, and Fort Bragg
construction safety and environmental protection laws, regulations, rules, and codes (i.e.
American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE),
ASTM International (ASTM), U.S. Department of Defense (DOD), U.S. Environmental
Protection Agency (EPA), etc.) and the Fort Bragg Installation Design Guide (IDG), dated at
the time of the task order award. When a required publication is not specifically referenced in
the contract, the contractor shall utilize one that has national applications. Where conflicts
arise between publications, the most stringent requirements shall apply.
2. AT/OPSEC Requirements: See AT OPSEC Cover sheet
Access, General Protection, and Security Policy and Procedures.
Contractor and all associated subcontractor employees shall comply with applicable
installation, facility and area commander installation/facility access and local security
policies and procedures (provided by government representative). The contractor shall also
provide all information required for background checks to meet installation/facility access
requirements to be accomplished by installation Provost Marshal, Director of Emergency
Services, or Security Office. The contractor workforce must comply with all personal identity
verification requirements as directed by DOD, HQDA and/or local policy. In addition to the
changes otherwise authorized by the changes clause of this contract, should the Force
Protection Condition (FPCON) at any installation or individual facility change, the
Government may require changes in contractor security matters or processes.
iWATCH Training.
The contractor and all associated sub-contractors shall brief all employees on the local
iWATCH program (training standards provided by the requiring activity Anti-terrorism
Officer). This local developed training will be used to inform employees of the types of
behavior to watch and instruct employees to report suspicious activity to the Contract Officer
Representative. This training shall be completed within 5 calendar days of the contract award
and within 10 calendar days of new employees commencing performance with the results
reported to the COR NLT 15 calendar days after contract award. This information is
available at the following website: https://www.youtube.com/watch?v=vlzYhQp7fPw
-- 2 of 9 --
P2-00101-26 Modernization of kitchen in 753
Page 3 of 9
For Eligibility Verification for Employment
E-Verify is an Internet-based system that compares information from an employee's Form I-
9, Employment Eligibility Verification, to data from U.S. Department of Homeland Security
and Social Security Administration records to confirm employment eligibility. The U.S.
Department of Homeland Security is working to stop unauthorized employment. By using E-
Verify to determine the employment eligibility of their employees, companies become part of
the solution in addressing this problem. All U.S. employers must complete and retain a Form
I-9 for everyone they hire for employment in the United States. This includes citizens and
noncitizens. On the form, the employer must examine the employment eligibility and identity
document(s) an employee presents to determine whether the document(s) reasonably appears
to be genuine and relates to the individual and record the document information on Form I-9.
The list of acceptable documents can be found on the last page of the form. E-Verify is
mandatory for employers with federal contracts or subcontracts that contain the Federal
Acquisition Regulation E-Verify clause.
3. Monthly Anticipated Adverse Weather Delay: Workdays Based on 5-Day Work Week.
These days are included in the POP.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
10 9 6 4 4 6 8 7 4 4 5 9
4. Interface with Government Personnel: Access to and from the site shall be coordinated
through 43 OSS. Contractor will coordinate work schedule with designated 43d AMOG
COR/inspector.
5. Contractor Requirements:
A. Occupancy During Construction
B. Quality Control System (QCS) Required
G. Submittals are required in the following materials.
All Other Materials For Information Only (FIO) Approval
The following submittals required for GA Approval:
• Command and Control furniture proposals based on layout and
equipment requirements
• Existing and New SVTC life cycle, compatibility with existing
equipment
• Raised floor repair
• Electrical changes
• SIPR/NIPR fiber and ethernet cabling routes and compatibility
• Microphone and Camera / system approval for classified areas
• LMR Base Station approval for classified areas
-- 3 of 9 --
P2-00101-26 Modernization of kitchen in 753
Page 4 of 9
7. Scope of Work: This job includes all labor, materials and equipment required for full
performance of the work; both explicit work and implied work required to follow the
manufactures specificat…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
North Mills River Campground
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due September 4, 2026
North Mills River Campground
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due September 4, 2026
CES Expansion UPS Upgrade
DEPT OF DEFENSE · Solicitation · due August 25, 2026
Greenhouse Phase V Renovation (Fargo, ND)
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 6, 2026
Solicitation N4008526R0187 MULTIPLE BARRACKS RENOVATION AT SOUTH CAROLINA MARINE CORPS BASES
DEPT OF DEFENSE · Solicitation · due August 24, 2026