Skip to content

Open for responses

56 CS FOC to Flightline and Wx Equipment, Luke AFB

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
F3YCFA6173AC01
NAICS
335921
PSC
6145
Set-aside
SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Posted
November 9, 2026
Response due
November 30, 2026
Place of performance
Luke Air Force Base, AZ

What this opportunity is

The Department of Defense is seeking proposals from SBA Certified Women-Owned Small Businesses (WOSB) to engineer, furnish, install, and test new fiber optic cable at Luke Air Force Base, Arizona. This project involves extensive installation work connecting various facilities, requiring contractors to provide all necessary materials and equipment. The notice type is a Combined Synopsis/Solicitation, indicating that interested businesses should track the opportunity closely rather than submit bids immediately, as proposals are due by 30 November 2026.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 STATEMENT OF WORK (SOW) New Fiber Optic Cable (FOC) to Fightline and Weather Related (Wx) Equipment Luke AFB AZ 5-May 2026 Prepared By 56 CS/SCXP 7320 N Homer Drive Luke AFB AZ 85309 -- 1 of 79 -- 2 TABLE OF CONTENTS Section Title Page 1.0 SCOPE 6 2.0 REQUIREMENTS 6 2.1 GENERAL REQUIREMENTS 6 2.1.1 Safety Requirements 6 2.1.2 Site Coordination 6 2.1.2.1 Confined Space 6 2.1.2.2 Accident/Incident Reporting and Investigation 6 2.1.2.3 Work Area(s) 6 2.1.2.4 Traffic Control 7 2.1.2.5 Airfield Driving 7 2.1.3 Security Requirements 7 2.1.3.1 Security Clearances 7 2.1.3.2 Operational Security (OPSEC) 7 2.1.4 Environmental Compliance 7 2.1.5 Permits 8 2.1.6 Integrated Process Team (IPT) 8 2.1.7 Quality Assurance 8 2.1.8 Contractor Personnel 8 2.1.8.1 Project Management 8 2.1.8.2 Site Point of Contact (POC) 9 2.1.8.3 Personnel Requirements 9 2.1.8.4 Minimum Contractor Qualifications 9 2.1.9 Warranty 9 2.1.10 Manuals and Practices 9 2.2 SPECIFIC REQUIREMENTS 9 -- 2 of 79 -- 3 2.2.1 Backboards 10 2.2.2 Equipment Cabinets 10 2.2.2.1 Grounding and Bonding 10 2.2.2.2 Bushings 10 2.2.3 Outside Plant Requirements 10 2.2.3.1 Existing Maintenance Holes 10 2.2.3.2 Measurements 10 2.2.3.3 Underground Utilities Markings 10 2.2.3.4 Closures for Cable Splicing in Maintenance Holes 11 2.2.3.4.1 Fiber Optic Splices 11 2.2.3.5 Splice Connectors 11 2.2.3.6 Labeling 11 2.2.3.6.1 Cable Tags 11 2.2.3.6.2 Fiber Optic Distribution Panel (FODP) Marking 11 2.2.3.6.3 New Ducts 12 2.2.3.7 Cable Terminations 12 2.2.3.7.1 Fiber Optic Terminations 12 2.2.3.7.2 Grounding and Bonding 12 2.2.3.8 FOC Maintenance Loop 12 2.2.3.9 New Maintenance Holes/Hand-holes 12 2.2.3.9.1 Cable Racks and Cable Rack Supports 13 2.2.3.10 Underground Conduit System 13 2.2.3.10.1 Composition 13 2.2.3.10.2 Installation 13 2.2.3.10.3 Bends and Sealing 14 2.2.3.10.4 Utility Separation 14 2.2.3.10.5 Spacers and Tracer Wire 14 2.2.3.10.6 Warning Tape 14 -- 3 of 79 -- 4 2.2.3.10.7 Entrance Conduits into Existing Maintenance Holes 14 2.2.3.10.8 Pull Boxes/NEMA 4 Enclosures 15 2.2.3.10.9 Excavation/Building Penetrations 15 2.2.3.10.10 Conduit Protection 15 2.2.3.10.11 Pull Tape 15 2.2.4 New Outside Plant Installation 15 2.2.4.1 Infrastructure Installation 16 2.2.4.1.1 New Manholes (MH)/Hand-Holes (HH) 16 2.2.4.1.2 New Duct Bank Infrastructure and Geotextile Fabric Innerduct Installation 16 2.2.4.1.3 New Geotextile Fabric Innerduct (a.k.a. Maxcell/MC) In Existing Conduit 16 2.2.4.1.4 New Network (NW) Cabinet Installation 17 2.2.4.1.5 New Back-Board (BB) Installation 17 2.2.4.2 New Fiber Optic Cable (FOC) Installation 17 2.2.5 Project Residue 20 2.2.6 Site Restoration 20 2.2.7 Service Outages 21 2.2.8 National Pollution Discharge Elimination System (NPDES) 21 2.2.9 Identification Marking 21 2.2.10 Installation Schedules 21 2.2.11 Status Reports 21 2.2.12 Drawings 21 2.2.12.1 As-Built Drawings 21 2.2.12.2 Butterfly Drawings 22 2.2.12.3 Geospatial Deliverables 22 2.2.13 Test and Acceptance/Installation Test Plan 22 2.2.13.1 Testing 22 2.2.13.1.1 Fiber Optic Tests 23 -- 4 of 79 -- 5 2.2.13.1.1.1 Optical Attenuation 23 2.2.13.1.1.2 Distance 23 2.3 Acceptance/Installation Test Report 23 2.4 Final Acceptance 23 2.5 Deliverable Summary 23 3.0 GENERAL INFORMATION 23 3.1 Period of Performance 23 3.2 Place of Performance 23 3.3 Hours of Operation 23 3.4 Holidays/Down Days 24 3.5 Base Support 24 4.0 APPENDICES 25 4.1 Appendix A: APPLICABLE STANDARDS 25 5.0 PROJECT SKETCHES 26 6.0 Examples of deliverables 47 TABLE A 51 TABLE B 61 -- 5 of 79 -- 6 1.0 SCOPE This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment. 2.0 REQUIREMENTS. 2.1 GENERAL REQUIREMENTS. 2.1.1 Safety Requirements. The contractor shall remain in compliance with all Federal, State, county, and base security and safety laws, regulations, policies, and requirements. 2.1.2 Site Coordination. The Contractor shall meet with the base safety officer immediately upon arrival on site for review of the specific safety requirements prior to installation. 2.1.2.1 Confined Space. The Contractors and Sub-contractors entering spaces on Luke AFB AZ are responsible for the safety of their personnel and for their own permit space program as outlined in AFMAN 91-203. All confined space operations must be coordinated with the Base Safety Office prior to starting work. The primary Contractor is responsible for all Sub-contractor confined space operations. 2.1.2.2 Accident/Incident Reporting and Investigation. The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel. Notification shall be provi…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 335921