What this opportunity is
The Department of Defense is seeking to procure 13 power supply units for repair or modification, as indicated by the solicitation notice. This opportunity is suitable for small businesses under NAICS code 335931, specifically those capable of meeting the repair turnaround time of 119 days and providing a defined monthly throughput for the assets. Interested vendors should note that this is a solicitation notice, which means they should prepare to submit bids rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CONTACT INFORMATION|4|N721.15|B1Z|215-697-6278|svitlana.shvets.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19| | | | | | | | | | | | | | | | | | | |
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8| | | | | | | | |
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x| | | | | | | | | | | |x| | | | | | | | | | | | | |
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|tbd| |tbd|tbd|tbd|tbd|tbd|tbd| | | | | | | | |
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1| |
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2| | |
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11| | | | | | | | | | | |
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13| | | | | | | | | | | | | |
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5| | | | | |
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1| |
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250| | | | | | | || | |
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A7 |DO-A7|
This requirement has been amended as follows:
1. Total quantity has been udpated to 13ea.
2. The offer due date has been extended until 15 December 2026.
\
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth
regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: ## 119_ days after receipt of asset.
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##0000 per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR
SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.
Early and incremental deliveries accepted and preferred.
\
1. SCOPE
1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.
1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
IPC/EIAJ-STD-001C paragraph 5.1.4.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 1.0 GENERAL
3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable
condition.
3.2 2.0 DEFINITIONS.
3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested
in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).
3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and
tested in accordance with the approved repair/overhaul man…