AAS One Year Building Maintenance
STATE, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
19RS5026Q0002
NAICS
561790
PSC
Z1AZ
Set-aside
No Set aside used
Posted
July 10, 2026
Response due
July 20, 2026
Place of performance
MOSCOW, RU-MOW
What this opportunity is
The government is buying building maintenance services for a vacant facility in Moscow, Russian Federation, which suits any business due to no set-aside being used. The contract requires the contractor to perform various tasks, including fire protection systems maintenance, security and surveillance services, and grounds maintenance. As this is a solicitation notice, businesses should track the opportunity to prepare for a potential bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
Background/Scope of Services:
The Contractor shall perform essential property preservation services at the vacant
American School Facility, Beregovaya Street, Building No. 1, Moscow, Russian
Federation. The facility is currently unoccupied and requires minimal maintenance
to preserve critical systems and ensure property security. The Contractor shall
furnish all labor, materials, equipment, and services required under this contract
within the time specified herein.
1. GENERAL
The Contractor shall:
• Provide all labor and tools to conduct work in each respective trade
• Perform the tasks below with qualified technicians within the selected trade
• Provide liability insurance for their employees
• Maintain 24/7 emergency response capability
2. DESCRIPTION OF SERVICES
The Contractor shall provide all labor, materials, and tools to perform the
following essential services for the vacant facility:
A. Fire Protection Systems Maintenance
• Fire alarm system monitoring, inspection, and maintenance
• Fire sprinkler system monitoring, inspection, and maintenance
B. Climate Control for Fire System Protection
• Heating system operation and monitoring to maintain minimum
temperatures necessary to prevent freezing of fire suppression systems
• Temperature monitoring throughout the facility
-- 1 of 13 --
C. Water System Freeze Prevention
• Domestic water system operation and monitoring to prevent freezing of all
water pipes and plumbing
D. Security and Surveillance Services
• Physical security patrols and monitoring to prevent unauthorized access,
vandalism, and ensure general property safety
• Surveillance system operation and monitoring
E. Worker Bathroom Facilities
• Maintenance and daily cleaning of three designated bathrooms for contractor
worker use
F. Grounds Maintenance
• Lawn mowing and vegetation control to maintain property appearance
G. General Housekeeping
• Periodic interior cleaning to prevent deterioration and maintain basic
property standards
H. Waste Management and Dumpster Services
• Trash removal and disposal services for building operations, landscape
debris, and materials from building operations
I. Emergency Response
J. Utilities Management
K. Utility Billing Coordination and Payment Processing
L. Basic Property Preservation
3. SPECIFIC TASKS
3.1 Fire Alarm System Maintenance and Monitoring
The Contractor shall:
-- 2 of 13 --
• Monitor fire alarm system continuously
• Test fire alarm system a minimum of four times per year
• Inspect fire alarm system quarterly by a licensed contractor
• Check equipment including pull stations, alarm bells or buzzers, and strobe
light indicators
• Inspect and clean smoke and heat detectors within the building and ductwork
to prevent false alarms
• Ensure control panels are accessible and functional
• Respond to all fire alarm activations within 30 minutes
• Maintain all required documentation and inspection records
• Ensure compliance with local fire safety regulations
3.2 Fire Sprinkler System Maintenance and Monitoring
The Contractor shall:
• The contractor is responsible for providing regular maintenance and repair
of the fire sprinkler system — including, but not limited to, sprinkler heads,
pipes, the central pump, and valves — to ensure complete fire protection of
the buildings.
• All materials, tools, and labor shall be the responsibility of the contractor.
• Inspect fire sprinkler system quarterly
• Service fire sprinkler system annually by a licensed contractor
• Monitor system pressure and functionality
• Inspect all sprinkler heads, valves, and piping for damage or leaks
• Ensure system remains operational and unfrozen
• Maintain all required documentation and inspection records
• Respond to system malfunctions within 2 hours
3.3 Climate Control and Freeze Prevention
-- 3 of 13 --
The Contractor shall:
• Operate heating systems to maintain minimum temperature of 50°F (10°C)
throughout the facility to prevent freezing of fire suppression systems and
plumbing
• The contractor is responsible for maintaining and repairing the central gas
boilers and associated air distribution systems to ensure freeze protection of
the buildings. This responsibility includes, but is not limited to, all tools,
materials, and labor required to perform the work.
• Monitor temperature in all areas of the building, particularly where fire
suppression systems and water pipes are located
• Install and monitor temperature sensors in critical areas
• Respond immediately to heating system failures or temperature drops below
safe levels
• Perform monthly inspections of heating equipment
• Maintain heating system in operational condition, including boilers,
thermostats, and controls
• Ensure adequate fuel supply for heating systems
• Document daily temperature readings
• Provide emergency heating response 24/7
3.4 Water System Freeze Prevention and Maintenance
The Contractor shall:
• Maintain domestic water system operation to prevent freezing of all water
pipes throughout the facility
• Monitor water pressure and flow in the system
• Maintain minimum water temperature in pipes to prevent freezing
• Drain and winterize any non-essential water lines if necessary to prevent
freeze damage
-- 4 of 13 --
• Inspect all exposed piping, valves, and fixtures monthly for leaks or damage
• Insulate exposed pipes in vulnerable areas as needed
• Respond to water system failures or leaks within 2 hours
• Document daily water system status
• Maintain hot water system operation at minimum levels necessary for freeze
prevention
• Ensure all plumbing fixtures remain functional and unfrozen
• Provide emergency plumbing response 24/7 for freeze-related issues or
major leaks
• The contractor is responsible for removing roof snow and clearing
emergency access routes for fire trucks and municipal emergency vehicles a
maximum of twice per winter season. When snow removal needs exceed the
contracted scope, the contractor shall notify the USG to engage a third-party
se…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 561790)
Grey Towers PA - Gutter Cleaning & Repair
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 30, 2026
Internal Fence Reconfiguration Services
DEPT OF DEFENSE · Sources Sought · due July 29, 2026
Stockbridge Snow and Ice Removal
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 13, 2026
Amendment 0003: Specialty Cleaning BPA - Dover AFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 24, 2026
Snow Removal and Grass Cutting Service, Misawa Air Base, Japan
DEPT OF DEFENSE · Presolicitation · due July 28, 2026
AAS One Year Building Maintenance
STATE, DEPARTMENT OF · Solicitation · due July 20, 2026