What this opportunity is
The Department of Defense is seeking sources for the AFIT/ENG-Cleanroom DI-RO Type I Ultra-Pure Water System, requiring contractors to provide maintenance, service, and repair for this system at Wright-Patterson Air Force Base, Ohio. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested parties should note that this is a Sources Sought notice, indicating a focus on gathering information rather than soliciting bids at this stage; responses are due by November 23, 2026.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT (PWS)
AFIT_ENG_Cleanroom _DI_RO Type I Ultra Pure Water System
1. GENERAL: This is a non-personnel services contract to provide Preventative
Maintenance (PM), Service and repair of the DI/RO Type I Water System. The
Government shall not exercise any supervision or control over the contract service
providers performing the services herein. Such contract service providers shall be
accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel,
equipment, supplies, facilities, transportation, tools, materials, supervision, and other
items and non-personal services necessary to perform PM, Service and repair of the
DI/RO Type I Water System as defined in this Performance Work Statement except for
those items specified as government furnished property and services. The contractor
shall meet the standards in this contract.
1.2 Background: The AFIT/ENG Cleanroom requires a DI/RO Water system to supply
18.2 Megohm, Type 1 water for cleaning and processing MEMS wafers using chemicals.
The system will need the SDI Anion, Cation, and Mixbed tanks to be changed annually to
maintain the required Type 1 water process. On occasion, parts and electrical services are
also needed to keep the Cleanroom Wet process up to standards for ENG MeMS courses
and student/faculty research.
1.3 Objectives: The contractor’s primary objectives will be for the preventative
maintenance of the DI/RO Type I Ultra-Pure Water system, servicing and repairs.
1.4 Scope: The minimum work performance will be Preventative Maintenance (PM) of
the DI/RO Type I water system consisting of replacing the SDI Anion, Cation, and
Mixbed tanks:
Part Number Description QTY Frequency Unit Price Minimum
Yearly Total
W3TSP4113 Administration Fee 1 PER VISIT $
100.00
$
100.00
W3TSP4258 Chemical Surcharge: SDI Tanks
3-4 CF 1 PER TANK $
37.00
$
296.00
W3TSP4276 Fuel/Energy Surcharge 1 PER VISIT $
35.00
$
35.00
W5TDIAN20360FSP SDI ANION2 3.6CF FBGLS STD
POT 2 12 MONTHS $
430.00
$
860.00
W5TDICAT0360FSP SDI CATION 3.6CF FBGLS STD
POT 2 12 MONTHS $
430.00
$
860.00
W5TDIMB10360FSP SDI MIXBED1 3.6CF FBGLS STD
POT 4 12 MONTHS $
430.00
$
1,720.00
ONE BASE YEAR 1 12 MONTHS TOTAL $ 3,871.00
FIVE (5) OPTION YEARS 5 60 MONTHS $19,355.00
Estimate Total base + Option yrs 6 72 MONTHS 23,226.00
-- 1 of 17 --
The contractor may also be called out for troubleshooting the system for errors, failures,
and repairs.
**A fuel/energy surcharge of $35.00 service visit is in effect. A chemical surcharge
based on tank size will be applied to each tank exchanged for SDI and WWIX service
visits. Surcharge pricing may change throughout the engagement period (subject to
market conditions). Failure to provide a purchase order for this renewal notice will result
in a $100 administration fee for the processing of an alternate form of payment**.
*For SDI customers; Tanks that are included in the exchange items listed above are
leased and remain the property of Evoqua. Tanks will be exchanged
every 12 months or sooner (unless digitally monitored), per terms of the tank lease*.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year
of 12 months and five (5) 12-month option years. The Period of Performance reads
as follows:
Base Year - 1 - 15 December 2026 through 30 September 2027
Option Year I - 1 October 2027 through 30 September 2028
Option Year II - 1 October 2028 through 30 September 2029
Option Year III - 1 October 2029 through 30 September 2030
Option Year IV - 1 October 2030 through 30 September 2031
Option Year V - 1 October 2031 through 30 September 2032
1.6 GENERAL INFORMATION
1.6.1 Quality Control: The Contractor shall develop and maintain an effective quality
control program (QCP) to ensure services are performed in accordance with this PWS.
The Contractor shall develop and implement procedures to identify, prevent, and ensure
non-recurrence of defective services. The Contractor’s QCP is the mechanism by which
the Contractor assures that their work complies with the requirements of the contract. The
QCP shall be delivered to the Contracting Officer within 10 days after contract award and
prior to commencement of work.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance
under this contract in accordance with the Quality Assurance Surveillance Plan. This
plan is primarily focused on what the Government must do to ensure that the contractor
has performed in accordance with the performance standards. It defines how the
performance standards will be applied, the frequency of surveillance, and the minimum
acceptable defect rate(s).
1.6.3 Recognized Holidays: The Contractor is NOT required to perform routine services
on the following federal holidays:
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
-- 2 of 17 --
1.6.4 Hours of Operation: The Contractor is responsible for conducting business
between the hours of 0800 - 1600, Monday through Friday, except on Federal holidays or
when the Government facility is closed due to local or national emergencies,
administrative closings, or similar Government-directed facility closings. For other than
firm-fixed-price contracts, the Contractor will not be reimbursed when the Government
facility is closed for the aforementioned reasons. The Contractor must always maintain an
adequate workforce for the uninterrupted performance of all tasks defined within this
PWS when the Government facility is not closed. When hiring personnel, the Contractor
shall keep in mind that the stability and continuity of the workforce are essential for
mission success.
1.6.5 Place of Performance: The work to be performed under this contract will be
performed at Wright-Patterson AFB, OH, Area B, Building B644, Mecha…
Source: SAM.gov, as posted. Verify the current solicitation before responding.