Skip to content

Open for responses

Aircraft Coatings and Sealants OO-ALC

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA822427R0002
NAICS
325510
PSC
8010
Set-aside
Small Business Set Aside - Total
Posted
November 16, 2026
Response due
November 18, 2026
Place of performance
Hill Air Force Base, UT

What this opportunity is

The Department of Defense is seeking a contractor to manage and supply aircraft coatings and sealants for the Ogden Air Logistics Complex at Hill Air Force Base in Utah. This opportunity is a total small business set-aside, making it suitable for small businesses that can meet the stringent requirements, including rapid delivery timelines and technical support. Interested contractors should note that this is a solicitation notice, indicating they should track the opportunity closely and prepare to submit proposals rather than simply expressing interest.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Solicitation FA822427R0002 Question and Answers Item No. Document / Attachment (e.g., SOW, Sec L) Section / Paragraph (e.g., Para 3.2) Page Number Industry Question / Clarification (No Proprietary Info) Government Response (GOVERNMENT USE ONLY) 1 52.212-1 2.4 Prior Experience 6 Prior Experience – Subfactor 4 Section 2.4 requires at least two DoD contracts within the past five years and states that each example must individually demonstrate: • coatings and sealants, • delivery fulfillment, • temperature-controlled and premixed-frozen material handling, and • methods used to maintain 85% shelf life on delivered products. Please confirm whether each individual contract reference must independently contain all four attributes, or whether the Government will consider the totality of relevant DoD experience across multiple contract references when the Offeror separately demonstrates current capability to perform all four requirements. The way the factor is currently written and the Governments expectation is that each contract referenced must demonstrate all 4 factors. Therefore if either of the 2 contracts referenced lack one or more of the 4 factors they would be considered insufficient. For purposes of this subfactor a Contract means a stand-alone contract or purcahse order, IDIQ contract, or Basic Purchase Agreement (BPA) submitted to demonstrate the offeror’s relevant experience. An IDIQ contract or BPA will count as one Contract, regardless of the number of associated task orders, delivery orders, calls, or purchases. Such orders or calls may be used to demonstrate scope, magnitude, complexity, and duration but will not count as separate Contracts. 2 Statement of Work 2.11 CDRL Master Summary Table 10 The SOW CDRL table identifies A002 Personnel Management Plan and A004 Quality Program Plan as “Submitted with Proposal (Initial),” with final versions due 30 days after award. Please confirm: • In which proposal volume should the initial PMP and QPP be submitted? • If included in Volume I, do these plans count toward the 60-page Technical Proposal limitation, or may they be provided as separate attachments We will remove the requirement for a draft to be provided at award and it will only be required to be submitted by the awardee 30 days after award. We will update the CDRL table in the SOW. Also, Personnel Management and Quality Program are listed erroneously on page 3 of the 52.212-2 documents which will be removed. 3 Pricing Matrix and Solicitation FA822427R00020001 Solicitation Supplies and Pricing (CLINS) section Page 3 Solicitation Page 3 The Pricing Matrix states that Year 5 quantities cover 18 months and therefore increases Year 5 quantities by 50%. However, the solicitation identifies Ordering Period 5 as October 15, 2031 through October 14, 2032, which appears to be a 12-month period. Please confirm whether Year 5 pricing should be based on 12 months or 18 months and whether Offerors should retain the existing 1.5 quantity multiplier in the Government-provided workbook. During an ordering period we execute funded order that covers items that get ordered through the Contractor’s online ordering system for up to year under the funded order vehicle. A funded order can be for less than a year but is typically issued for a year worth of product per group. It is difficult for the Government to issue funded orders that have exact quantities on them which is one of the reasons why we require an online ordering system and for a Contractor to be involved in understanding the needs of the Government through coordinating with each of the groups and monthly site visits (see sections 2.5.4.1 and 2.6.3 of the SOW). Funded orders can be placed up to the last day of the ordering period which is currently estimated to be October 14th 2032. Any funded order issued during the final period needs to be completed either within a year of issuance or by 6 months after the ordering period ends whichever comes first. The expectation is that item requests can continue to be placed through the online ordering system and delivered after the ordering period ends so long as a valid funded order is in place that allows items to be delivered during the final 6 months. Technical assistance will continue to be needed through the final 6 months after the ordering period ends. The technical assistance CLIN end date will be updated on the solicitation. -- 1 of 3 -- Solicitation FA822427R0002 Question and Answers Item No. Document / Attachment (e.g., SOW, Sec L) Section / Paragraph (e.g., Para 3.2) Page Number Industry Question / Clarification (No Proprietary Info) Government Response (GOVERNMENT USE ONLY) 4 Solicitation FA822427R00020001 Clauses 52.216-18 and 52.216-22 22 and 23 The solicitation identifies five 12-month ordering periods, while FAR 52.216-18 states that orders may be issued from Day 1 through 6 years 2 months, and FAR 52.216-22 references deliveries through 74 months. Please clarify the intended relationship among: • the ramp-up period, • the five stated ordering periods, • the 18-month Year 5 quantity calculation, and • the 74-month ordering/delivery language. This clarification will help Offerors accurately model inventory, staffing, technical assistance, and pricing over the intended contract duration. FAR 52.216-18 will be updated to reflect an end date of 5 years and 8 months or 68 months. Deliveries can be made for 74 months although the first 8 months will be just a monthly status report, physical items will not be ordered during the ramp up period. 1. Eight (8) Month Ramp Up: 15 Feb 2027- 14 October 2027 2. Sixty (60) Month Ordering Period: 15 October 2027- 14 October 2032. Funded Orders can be placed prior to 15 October 2027, but the effective date will not start and deliveries will not be expected until on or after October 15th. 3. Final six (6) months: October 15th 2032 to April 14th 2033. Final Items can be delivered and or placed through the online ordering systems under f…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 325510