The Department of Defense is seeking a contractor to manage and supply aircraft coatings and sealants for the Ogden Air Logistics Complex at Hill Air Force Base in Utah. This opportunity is a total small business set-aside, making it suitable for small businesses that can meet the stringent requirements, including rapid delivery timelines and technical support. Interested contractors should note that this is a solicitation notice, indicating they should track the opportunity closely and prepare to submit proposals rather than simply expressing interest.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Solicitation FA822427R0002 Question and Answers
Item No. Document / Attachment
(e.g., SOW, Sec L)
Section / Paragraph
(e.g., Para 3.2)
Page
Number
Industry Question / Clarification
(No Proprietary Info)
Government Response
(GOVERNMENT USE ONLY)
1 52.212-1 2.4 Prior Experience 6 Prior Experience – Subfactor 4
Section 2.4 requires at least two DoD contracts within the past five years and states that
each example must individually demonstrate:
• coatings and sealants,
• delivery fulfillment,
• temperature-controlled and premixed-frozen material handling, and
• methods used to maintain 85% shelf life on delivered products.
Please confirm whether each individual contract reference must independently contain all
four attributes, or whether the Government will consider the totality of relevant DoD
experience across multiple contract references when the Offeror separately demonstrates
current capability to perform all four requirements.
The way the factor is currently written and the Governments expectation
is that each contract referenced must demonstrate all 4 factors.
Therefore if either of the 2 contracts referenced lack one or more of the 4
factors they would be considered insufficient. For purposes of this
subfactor a Contract means a stand-alone contract or purcahse order,
IDIQ contract, or Basic Purchase Agreement (BPA) submitted to
demonstrate the offeror’s relevant experience. An IDIQ contract or BPA
will count as one Contract, regardless of the number of associated task
orders, delivery orders, calls, or purchases. Such orders or calls may be
used to demonstrate scope, magnitude, complexity, and duration but will
not count as separate Contracts.
2 Statement of Work 2.11 CDRL Master Summary Table 10 The SOW CDRL table identifies A002 Personnel Management Plan and A004 Quality
Program Plan as “Submitted with Proposal (Initial),” with final versions due 30 days after
award.
Please confirm:
• In which proposal volume should the initial PMP and QPP be submitted?
• If included in Volume I, do these plans count toward the 60-page Technical Proposal
limitation, or may they be provided as separate attachments
We will remove the requirement for a draft to be provided at award and
it will only be required to be submitted by the awardee 30 days after
award. We will update the CDRL table in the SOW. Also, Personnel
Management and Quality Program are listed erroneously on page 3 of the
52.212-2 documents which will be removed.
3 Pricing Matrix and Solicitation
FA822427R00020001
Solicitation Supplies and Pricing
(CLINS) section Page 3
Solicitation
Page 3
The Pricing Matrix states that Year 5 quantities cover 18 months and therefore increases
Year 5 quantities by 50%. However, the solicitation identifies Ordering Period 5 as October
15, 2031 through October 14, 2032, which appears to be a 12-month period. Please
confirm whether Year 5 pricing should be based on 12 months or 18 months and whether
Offerors should retain the existing 1.5 quantity multiplier in the Government-provided
workbook.
During an ordering period we execute funded order that covers items
that get ordered through the Contractor’s online ordering system for up
to year under the funded order vehicle. A funded order can be for less
than a year but is typically issued for a year worth of product per group.
It is difficult for the Government to issue funded orders that have exact
quantities on them which is one of the reasons why we require an online
ordering system and for a Contractor to be involved in understanding the
needs of the Government through coordinating with each of the groups
and monthly site visits (see sections 2.5.4.1 and 2.6.3 of the SOW).
Funded orders can be placed up to the last day of the ordering period
which is currently estimated to be October 14th 2032. Any funded order
issued during the final period needs to be completed either within a year
of issuance or by 6 months after the ordering period ends whichever
comes first. The expectation is that item requests can continue to be
placed through the online ordering system and delivered after the
ordering period ends so long as a valid funded order is in place that
allows items to be delivered during the final 6 months. Technical
assistance will continue to be needed through the final 6 months after
the ordering period ends. The technical assistance CLIN end date will be
updated on the solicitation.
-- 1 of 3 --
Solicitation FA822427R0002 Question and Answers
Item No. Document / Attachment
(e.g., SOW, Sec L)
Section / Paragraph
(e.g., Para 3.2)
Page
Number
Industry Question / Clarification
(No Proprietary Info)
Government Response
(GOVERNMENT USE ONLY)
4 Solicitation FA822427R00020001 Clauses 52.216-18 and 52.216-22 22 and 23 The solicitation identifies five 12-month ordering periods, while FAR 52.216-18 states that
orders may be issued from Day 1 through 6 years 2 months, and FAR 52.216-22 references
deliveries through 74 months.
Please clarify the intended relationship among:
• the ramp-up period,
• the five stated ordering periods,
• the 18-month Year 5 quantity calculation, and
• the 74-month ordering/delivery language.
This clarification will help Offerors accurately model inventory, staffing, technical
assistance, and pricing over the intended contract duration.
FAR 52.216-18 will be updated to reflect an end date of 5 years and 8
months or 68 months. Deliveries can be made for 74 months although
the first 8 months will be just a monthly status report, physical items will
not be ordered during the ramp up period.
1. Eight (8) Month Ramp Up: 15 Feb 2027- 14 October 2027
2. Sixty (60) Month Ordering Period: 15 October 2027- 14 October 2032.
Funded Orders can be placed prior to 15 October 2027, but the effective
date will not start and deliveries will not be expected until on or after
October 15th.
3. Final six (6) months: October 15th 2032 to April 14th 2033. Final Items
can be delivered and or placed through the online ordering systems
under f…