Description
October 15, 2026
Attachment 0001 Special Provisions
W31P4Q27RA011
1. 52.247-4700, BAR CODE MARKINGS MAY/2014
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129
and ISO/IEC 16388 - Information Technology - Automatic Identification and Data
Capture Techniques - Bar Code Symbology Specification - Code 39.
2. 52.246-4008, Identification Marking Requirements 52.247-4700
a) The Contractor shall mark all items delivered under this contract in accordance with
the latest version of MIL-STD-130, "Identification Marking of U.S. Military Property",
unless otherwise specified in the contract or technical data package.
(b) The marking shall include the National Stock Number (NSN), Commercial and
Government Entity (CAGE) Code, Part Number, and Nomenclature.
(c) Where Item Unique Identification (IUID) is required by DFARS 252.211-7003, the
contractor shall provide the IUID mark in accordance with the aforementioned standard
and applicable contract attachments. All labels and markings must remain legible and
affixed through the normal expected life of the item.
(End of clause)
3. 52.243-4000, ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST
FOR DEVIATION, MAR/2011 REQUEST FOR VARIANCE, ENG RELEASE
RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE
PREPARATION AND SUBMISSION INSTRUCTIONS, MAR/2011
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering
Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance
(RFVs), collectively referred to as "proposals", shall be prepared, submitted and
distributed in accordance with paragraphs 2, 3 and 4 below except as specified in
paragraph 5 below.
2 . Format.
a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and
describing the effects of the change on the suitability and supportability of the
Configuration Item (CI). Class I ECPs should be limited to those that are necessary or
offer significant benefit to the Government. Class I ECPs are those that affect the
-- 1 of 6 --
performance, reliability, maintainability, survivability, weight, balance, moment of inertia,
interface characteristics, electromagnetic characteristics, or other technical
requirements in the specifications and drawings. Class I ECPs also include those
changes that affect Government Furnished Equipment, safety, compatibility, retrofit,
operation and maintenance manuals, interchangeability, substitutability, replaceability,
source control specifications and drawings, costs, guarantees or warranties, deliveries,
or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or
schedule of the system CI and do not meet the other criteria described above for Class I
ECPs.
b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523,
pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all
effects of the change on the CI are properly addressed and documented to the
necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II
ECPs, shall be prepared using RDMR Form 523 (page 1 only). Supplemental pages
may be used with the form as necessary. The responsible Contract Management Office
(CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification
Codes", and Block 7 "Priority."
d. The Contractor shall not manufacture items for acceptance by the Government that
incorporate a known departure from requirements, unless the Government has
approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530
(Type I, see block 5 of the form.)
e. The Contractor shall not submit items for acceptance by the Government that include
a known departure from the requirements, unless the Government has approved a RFV.
RFVs shall be prepared using RDMR Form 528.
f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation
prepared by the responsible Defense Contract Management Agency (DCMA) technical
representative. The DCMA written evaluation shall be considered part of the
ECP/RFD/RFV proposal.
g. Classification of RFDs/RFVs.
(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major
when the RFD/RFV consists of acceptance of an item having a nonconformance with
contract or configuration documentation involving health; performance;
interchangeability; reliability; survivability; maintainability; effective use or operation;
weight; appearance (when a factor); or when there is a departure from a requirement
classified as major in the contractual documentation.
(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical
when the RFD/RFV consists of acceptance of an item having a nonconformance with
-- 2 of 6 --
contract or configuration documentation involving safety or when there is a departure
from a requirement classified as critical in the contractual documentation.
(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor
when the RFD/RFV consists of acceptance of an item having a nonconformance with
contract or configuration documentation which does not involve any of the factors listed
above in paragraphs g(1) or g(2), or when there is a departure from a requirement
classified as minor in the contractual documentation.
h. Proposals shall include sufficient technical data to describe all changes from existing
contract requirements.
i. Proposals shall include sufficient justification for making the change, including a
statement of contract impact, if the change is not authorized.
j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment
acceptable to the Contractor if the Government subsequently approves the proposal. If
approved, the equitable increase shall not exceed this amount.
k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be
worked out via mutual agreement b…