What this opportunity is
The Department of Agriculture is seeking quotations for the ANF Suppression Damage Chantry project, which involves road repairs and rehabilitation at Angeles National Forest, California. This opportunity is a Total Small Business Set-Aside under NAICS 237310, suitable for small businesses specializing in highway, street, and bridge construction. Interested vendors should note that this is a combined synopsis/solicitation, meaning they must submit their quotes directly without waiting for a separate solicitation document.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
US Department of Agriculture (USDA)
Statement of Work
ANF Suppression Damage Chantry
Angeles National Forest
-- 1 of 4 --
2
STATEMENT OF WORK
The purpose of this contract is to provide road repairs to the Chantry Flats Picnic Area as well as San Olene
Road from Chantry Flats to the Helispot. The existing San Olene road will be pulverized, compacted and
repaved to maintain current drainage features and flows. San Olene road will be repaved and 2” of Caltrans
HMA will be paved over the new road base. The Chantry Flats Picnic Area will be slurry sealed to repair
damage from dozer and excavators tracking on the pavement during the 2025 Eaton Fire. To match, the entire
picnic area will be slurry sealed and restriped to match the existing parking layout. The slurry seal will consist
of CalTrans Spec 37-3 Type 1 Slurry Seal. Chantry picnic area consist of approximately 82 parking stalls,
directional arrows, traffic control lines and various no parking areas. Two slabs of concrete will be replaced
adjacent to San Olene Road, where dozers tracked over the existing walkway leading to the concrete failure.
The concrete replacement will consist of 4” concrete, 4000 psi per FP-24 Table 501-1. Existing walkway
dimensions shall remain the same which is currently 36” wide with an approach off of San Olene Road.
This contract provides for the equipment, labor, and services necessary to perform work ordered by the
Government for road pulverization and repaving of San Olene Road, slurry sealing and striping the Chantry
Flats picnic area and replacing damaged concrete walking path sections, in compliance with the terms,
specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest
Service.
The Contractor is responsible for inspecting the access route prior to bidding and utilizing appropriately sized
haul trucks and equipment.
PROJECT LOCATION
The project location is on the Angeles National Forest within the Los Angeles Gateway Ranger Districts. The
terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as
well, from soft and sandy to compacted and extremely rocky. A general Vicinity Map is included with this
solicitation. Angeles National Forest maps are also available to assist in locating the individual roads and can
be purchased at the Supervisors Office. The office is open between the hours of 8:00 am and 4:30 pm, Monday
through Friday. The office is located at 701 N Santa Anita Ave, Arcadia CA 91016
The Government will not provide a pre-bid site meeting. All roads are open for review and highly suggested to
be driven for existing condition. For additional information regarding road access for the contract contact Zach
Binversie at (626) 701-9655 or Zachary.Binversie@usda.gov
PERIOD OF PERFORMANCE:
Start is expected immediately after contract award (January 2027).
Time for completion: 90 calendar days from the issuance of the “Notice to Proceed”.
Work shall be performed Monday through Friday between the hours of 7:00 AM and 5:00 PM. Work is
prohibited on weekends and Federal holidays, unless approved in writing by the Contracting Officer (CO).
SCHEDULING
The contractor shall submit a proposed work schedule to allow the COR and District Rangers to evaluate
options for temporary road closures along the entirety of the project. Road closures will not be guaranteed in
full, but will be considered for this project.
-- 2 of 4 --
3
REQUIREMENTS
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities to perform the
Statement of Work/Specifications referenced below. Equipment staging, material stockpiling, and portable
sanitation facilities shall be confined strictly to areas designated by the Contracting Officer's Representative
(COR) within the Area.
The Contractor shall provide equipment that is free and clear of soils, seeds, vegetative materials and other
debris that could contain or hold seeds of noxious weeds. Once on-site, there will be no equipment washing
requirement as this project is located within one area.
Water is available for the contractor to use on site. The Angeles National Forest operates its own water system
and due to unforeseen conditions or needs this system is not guaranteed to be operational during the period of
this contract. The contractor is responsible for providing an alternative off-site water source as needed.
The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the
operation if excessive soil disturbance and/or erosion problems occur.
The Contractor shall repair all associated damage on established roads, adjacent vegetation or other
improvements caused by their operations or equipment prior to partial or final payment.
The Contractor shall provide technical submittals for all materials that may be furnished on this project for
Forest Service review and approval prior to installation.
The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.
The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project
Activity Level (PAL) each day and restrict their work accordingly.
The Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may
require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.
The Contractor is responsible for traffic control and equipment staging requirements in work areas when
working on National Forest System Lands. The Contractor shall install high-visibility barricades, caution tape,
and advance warning signage around all active work zones, wet slurry seal areas, and open excavations. A
dedicated spotter shall be used whenever heavy equipment is operating in reverse or maneuvering near public
trailheads.
The Contractor shall protect all existing culverts, drop inlets, and drainage ditches …
Source: SAM.gov, as posted. Verify the current solicitation before responding.