What this opportunity is
The Department of Defense is seeking Preventative Maintenance services for an Arc Spark Optical Emission Spectrometer at Tinker Air Force Base, Oklahoma. This opportunity is open to all businesses as there is no set-aside. The contract includes one base year with four option years, requiring contractors to provide labor, tools, and OEM components in accordance with specified guidelines. As this is a combined synopsis/solicitation notice, interested parties should track the opportunity closely for updates rather than submitting a bid at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
I
CUI
CUI
PERFORMANCE WORK STATEMENT
FOR
76 MXSG ARC SPARK OPTICAL EMISSIONS SPECTROMETER
PREPARED BY:
OC-ALC/OBCA
5 October 2026
-- 1 of 18 --
I
CUI
CUI
Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All
individuals must accept personal responsibility for safety and seek opportunities for improving
the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix
(if able) and report all hazards and near-misses. It is our shared duty to take every reasonable
step and precautions to prevent accidents and preserve the health/safety of each contractor and
government employee.
Section One
1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts,
quality control, transportation and inspection manuals necessary to perform the Preventive
Maintenance service, PM Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is
listed in Appendix A
1.1.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment
Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the
terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and
this PWS.
1.2 Requested Services: Requested Services: The Contractor shall provide annual Preventive
Maintenance (PM) services for the Arc Spark Optical Emissions Spectrometer, with four (4) option
years.
1.3 Preventive Maintenance (PM): The objective of PM is to protect the equipment capability and
investment by removing causes of failure, performing routine maintenance and providing
adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all
PM’s IAW the OEM specifications. The Contractor shall perform 2 PM’s per year on each item
listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Government
Point of Contact (GPOC) within ten (10) business days after contract award. The Contractor shall
notify the GPOC seven (7) business days prior to each scheduled PM visit.
1.4 Over and Above (O&A): O&A is defined as work discovered during the course of performing the
repair efforts that are within the scope of the contract and necessary in order to satisfactorily
complete the contract. The Contractor shall complete O&A requirements In Accordance With
(IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028. PGI 217.77.
1.5 Malfunction and Notification Process: Upon the occurrence of an equipment or system
malfunction, the GPOC will contact the Contractor by telephone, email, or fax and provide
information below. If the GPOC notifies the Contractor via telephone, the GPOC will provide a
written copy of the request by email or fax.
• the equipment identification number (ID)
• A brief description of the malfunction
• location of equipment
• name and telephone number of the Point of Contact (POC)
-- 2 of 18 --
I
CUI
CUI
Upon notification of the system malfunction, the technician shall arrive on site at the equipment
location within two (2) business days or if overseas five (5) business days.
1.6 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the
GPOC by fax or email no later than (NLT) one (1) business day after the completion of the
inspection. As a minimum, the information cited in the Estimate Repair Report shall include:
• the equipment ID#
• date of evaluation
• Description of findings and recommendations
• required parts and part numbers (P/N)
• cost of parts
• number of parts needed
• estimated labor hours required to complete the repair
Any recommendations cited shall consider:
• the priority of the requested service
• available source for obtaining new parts
• the availability of the new parts
• shipping and delivery schedules of parts
• other factors which may be peculiar to the specific repair requirement
1.7 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair
actions. The GPOC will coordinate any repair actions with the Government Subject Matter Expert
(SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all
repair actions have the documented CO approval, in writing, before initiating any repair or
ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have
been completed.
1.7.1 Once the authorization for repair action has been received from the CO, the Contractor shall order
any required parts within two (2) business days and notify the GPOC, in writing, of the estimated
arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair
within five (5) business days. The GPOC will verify the receipt of the parts with the Contractor
to ensure the repair is performed in a timely manner.
1.8 Parts and Materials: The Contractor shall provide and use only new parts and material in
performance of this PWS unless otherwise authorized by the CO. Long lead items greater than
five (5) business days must be identified and provide sufficient documentation supporting the
delay.
1.9 Service Report: Immediately upon completion of any maintenance and before leaving the OC-
ALC, the Contractor shall provide a draft, written Service Report to the SME. When necessary, the
SME will forward the draft service report to the GPOC within 2 business days of receipt. The
-- 3 of 18 --
I
CUI
CUI
Contractor shall provide, by fax or email, the final service report within 5 business days to the
GPOC. As a minimum, the final service report shall contain the following information:
• Company Name
• Requested service date
• Contract #
• Equipment ID #
• Description of Services provided
• Additional Services recommended (if any)
• Printed Name and Signature of Technician who performed the Services (electronic
signatures are acceptable)
• Printed Name and Signature of on-site SME or GPOC (electronic signatures…
Source: SAM.gov, as posted. Verify the current solicitation before responding.