Description
Statement of Work (SOW) – Asbestos Abatement in Olmstead’s Quarters
Fort Pulaski National Monument
Required Services
The Contractor shall provide all labor, materials, equipment, supervision, permits, testing,
disposal, documentation, and incidental services necessary to perform selective asbestos
abatement and preservation-sensitive restoration work associated with two historic fireplaces
located within Olmstead’s Quarters at Fort Pulaski National Monument.
The work includes the identification, containment, controlled dismantling, removal, handling,
transport, and disposal of asbestos-containing materials (ACM) located between the marble
fireplace surrounds and firebox assemblies, as identified in the asbestos field notes and
laboratory analysis indicating the presence of chrysotile asbestos.
The Contractor shall perform all work in a manner that protects historic fabric and preserves the
original appearance, configuration, and integrity of the fireplaces and surrounding historic
materials.
Location of Work.
Fort Pulaski National Monument – Inside Fort
101 Cockspur Island Road
Savannah, GA 31010
Pre-Bid Site Survey
A pre-bid site walk-through must be performed prior to bid with Contracting Officer’s
Representative (COR) or other authorized park management representative present. Any
provided site plans, maps, or photos cannot be used as a substitute for a site visit.
Appendix 1 contains field notes, photographs, maps, and other information regarding this work.
Period of Performance
Within 30 days after award, unless otherwise negotiated and agreed by park and Contracting
Officer (CO.)
1. General Requirements
• All sites are to be left clean and orderly at the end of each day. No materials are to be left
onsite that are not easily secured. The park assumes no liability for any equipment not
properly secured that is stolen, missing, or damaged over the course of the contract period
of performance.
• Disposal of any demolished building, site, or landscape materials will be done in
accordance with applicable state and local laws. Park waste management facilities may
not be used for disposal of any construction material.
• Site is to be closed to all visitors and vehicle traffic while work is being performed as
well as while the site is left unattended. This is to be done with signage and appropriate,
neatly placed closures such as stanchions, construction fencing, cones, or other sturdy
materials.
-- 1 of 15 --
• The Contractor must exercise care and caution in all activities performed on or near
historic structures, landscapes, and other National Park Service (NPS) properties.
Measures must be taken to protect the landscape and surrounding areas from damage
during the execution of the work, ensuring that no harm comes to the landscapes, sites, or
park structures throughout the project.
• The Contractor is to stop work and alert the park’s contracting officer representative
(COR) or other authorized management representatives of any accidental damage
immediately so that it can be documented and handled according to proper NPS
procedure.
• The Contractor will be held responsible for all restoration of the site, both landscape and
building, if damaged while work is performed. The restoration must bring the worksite to
the appearance and condition that existed prior to the work being performed. The
Contractor is responsible for cleanup, removal, and disposal of any debris associated with
their installation of equipment and restoration of the building if damaged.
• All planned service interruptions must be coordinated with the park, and the time-of-
service interruption must be as short as possible. The park shall be notified of any
scheduled utility or access interruptions as early as possible, but no less than 48 hours
prior to any planned interruption. The Contractor shall inform the government as soon as
it is known that there may be an unplanned interruption.
2. Project Specific Requirements
2.1 Documentation
Prior to disturbance of any historic material, the Contractor shall:
• Photograph all fireplace assemblies, surrounds, hearths, mortar joints, and adjacent
finishes
• Document existing conditions, dimensions, alignment, and component locations
• Label and catalog all removable historic materials to ensure accurate reinstallation
• Protect and archive documentation as part of the project record
2.2 Protection of Historic Materials
The Contractor shall protect all adjacent historic features from damage caused by work activities.
Protection measures shall include:
• Non-staining protective coverings
• Temporary barriers
• Dust protection systems
• Vibration control measures
• Floor and wall protection
• Controlled access zones
The use of aggressive demolition methods is prohibited. Hand tools and low-impact
dismantling methods shall be utilized whenever feasible. The following methods and equipment
shall not be permitted unless specifically approved by the COR:
• Impact demolition tools
-- 2 of 15 --
• Abrasive grinders
• Uncontrolled cutting tools
• High-vibration removal equipment
2.3 Containment and Environmental Controls
The Contractor shall establish regulated asbestos work areas including:
• Critical barriers
• Negative air containment systems
• HEPA-filtered exhaust equipment
• Worker decontamination facilities
• Waste load-out procedures
• Warning signage and restricted access controls
Containment systems shall be constructed in a manner that minimizes attachment or damage to
historic surfaces.
2.4 Selective Dismantling
The Contractor shall selectively dismantle fireplace components only to the extent necessary to
access ACM. Work shall include:
• Careful removal of mortar at designated joints
• Temporary removal of marble surround components
• Labeling and cataloging of all removed components
• Secure storage and protection of salvaged materials
All removed historic materials shall remain the property of the NPS. Any damaged historic
material shall be immediately reported to…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 562910)
USMMA - CLEANING AND REMEDIATION OF THE BOWDITCH HALL INDOOR GUN RANGE
TRANSPORTATION, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 3, 2026
5 SFS CATM Range Lead Removal
DEPT OF DEFENSE · Solicitation · due July 29, 2026
Mold Mitigation
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 31, 2026
Bioremediation and Cleaning of Building 801 Services
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 31, 2026
Mold abatement removal services
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 14, 2026
Annual bullet trap cleaning and hazardous debris removal at USCG Dexter Small Arms Firing Range, Honolulu.
HOMELAND SECURITY, DEPARTMENT OF · Solicitation · due August 23, 2026