B268 Replace STUS Backup Generator
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
FA302226R00023
NAICS
236220
PSC
Z2AA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 16, 2026
Response due
September 3, 2026
Place of performance
Columbus, MS
What this opportunity is
The Department of Defense is seeking a total small business to design and build a replacement backup generator at Columbus Air Force Base in Mississippi, under project number EEPZ254665. This opportunity is set aside specifically for small businesses, aligning with FAR 19.5 regulations. Interested contractors should note that this is a solicitation notice, indicating that they can submit bids for the project rather than just tracking it.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
DESIGN-BUILD STATEMENT OF WORK
PROJECT NUMBER: EEPZ254665
Replace STUS Backup Generator, B268
COLUMBUS AFB, MISSISSIPPI
21 Apr 2026
-- 1 of 39 --
COLUMBUS AFB, MS PROJECT NUMBER: EEPZ254665
Replace STUS Backup Generator,B268
PAGE 2 of 39
TABLE OF CONTENTS
NOMENCLATURE ........................................................................................................................ 4
1.1 ACRONYMS & ABBREVIATIONS................................................................................................ 4
1.2 BASIC TERMS ................................................................................................................................. 5
DESCRIPTION OF PROJECT ....................................................................................................... 6
2.1 SUMMARY (EXAMPLE BELOW) ................................................................................................. 6
2.2 BACKGROUND ............................................................................................................................... 6
2.3 SCOPE OF PROJECT ....................................................................................................................... 6
2.4 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS (DETAILS NOT ALWAYS
NECESSARY, IF NOT, SAY THE GOVERNMENT WILL NOT FURNISH ANYTHING FOR THIS
PROJECT; THIS IS AN EXAMPLE BELOW) ............................................... Error! Bookmark not defined.
2.5 SALVAGE (DETAILS NOT ALWAYS NECESSARY, IF NOT, SAY THE GOVERNMENT WILL
NOT SALVAGE ANYTHING FROM THIS PROJECT; THIS IS AN EXAMPLE BELOW)Error! Bookmark
not defined.
DESIGN REQUIREMENTS ........................................................................................................... 8
3.1 SUMMARY....................................................................................................................................... 8
3.2 NATURE/EXTENT OF DESIGN (CHANGE THIS FOR PROJECT SPECIFICS, EXAMPLE
BELOW) 8
3.3 RESPONSIBILITY ........................................................................................................................... 8
3.4 DESIGN STANDARDS (ADD ANY OTHER RELEVANT UFCs, CODES, AND STANDARDS)8
3.5 DRAWINGS ...................................................................................................................................... 9
3.6 DESIGN SUBMITTALS (CHECK DAYS IN RED IN SECTION 3.6.2) .......................................10
3.7 DESIGN REVIEWS .........................................................................................................................11
3.8 CONFERENCES ..............................................................................................................................12
ADMINISTRATION OF CONSTRUCTION ................................................................................13
4.1 PERFORMANCE CAPABILITIES (VERIFY RED TEXT IN THIS SECTION ON EACH PROJECT)
13
4.2 COMMENCEMENT, PROSECUTION & COMPLETION (PERIOD OF PERFORMANCE IN 4.2.3)
14
4.3 SCHEDULING .................................................................................................................................15
4.4 MANAGING ....................................................................................................................................17
4.5 MATERIAL SUBMITTALS AND SHOP DRAWINGS .................................................................17
4.6 WORK BY GOVERNMENT ...........................................................................................................19
4.7 PRE-FINAL AND FINAL INSPECTION .......................................................................................19
4.8 WARRANTY ...................................................................................................................................20
4.9 CONTRACTOR OFFICE.................................................................................................................21
4.10 CONSTRUCTION SITES ................................................................................................................22
4.11 CONSTRUCTION EQUIPMENT....................................................................................................24
-- 2 of 39 --
COLUMBUS AFB, MS PROJECT NUMBER: EEPZ254665
Replace STUS Backup Generator,B268
PAGE 3 of 39
4.12 AVAILABILITY OF UTILITY SERVICES AT JOB SITES..........................................................24
4.13 TEMPORARY UTILITIES ..............................................................................................................24
4.14 CONSTRUCTION SECURITY .......................................................................................................25
QUALITY REQUIREMENTS .......................................................................................................27
5.1 QUALITY CONTROL PLAN .........................................................................................................27
5.2 TESTING AND INSPECTION SERVICES ....................................................................................28
5.3 MANUFACTURERS' FIELD SERVICES ......................................................................................29
5.4 PRODUCT REQUIREMENTS ........................................................................................................29
5.5 CLOSEOUT PROCEDURES...........................................................................................................30
SAFETY, HEALTH AND ENVIRONMENTAL PROTECTION ................................................32
6.1 SAFETY AND HEALTH .................................................................................................................32
6.2 GENERAL........................................................................................................................................32
6.3 HAZARDOUS MATERIAL ....................................................…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
Matsushima JASDF Base Storage Shelter
DEPT OF DEFENSE · Sources Sought · due August 7, 2026
Repair Concrete Base-wide, 126 ARW, Scott AFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 14, 2026
Z1DA--| SOL| NRM| 646-21-101 UD SPS AHU & RO Upgrade Construction (VA-26-00036217)
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 27, 2026
NAF Outdoor Recreation/Equipment Rental Center, Kadena Air Base, Okinawa, Japan
DEPT OF DEFENSE · Solicitation · due July 24, 2026
Z--Expansion of the PIFSC Glider Lab, JBPHH
COMMERCE, DEPARTMENT OF · Solicitation · due August 7, 2026