B268 Replace STUS Backup Generator

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA302226R00023
NAICS
236220
PSC
Z2AA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 16, 2026
Response due
September 3, 2026
Place of performance
Columbus, MS

What this opportunity is

The Department of Defense is seeking a total small business to design and build a replacement backup generator at Columbus Air Force Base in Mississippi, under project number EEPZ254665. This opportunity is set aside specifically for small businesses, aligning with FAR 19.5 regulations. Interested contractors should note that this is a solicitation notice, indicating that they can submit bids for the project rather than just tracking it.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

DESIGN-BUILD STATEMENT OF WORK PROJECT NUMBER: EEPZ254665 Replace STUS Backup Generator, B268 COLUMBUS AFB, MISSISSIPPI 21 Apr 2026 -- 1 of 39 -- COLUMBUS AFB, MS PROJECT NUMBER: EEPZ254665 Replace STUS Backup Generator,B268 PAGE 2 of 39 TABLE OF CONTENTS NOMENCLATURE ........................................................................................................................ 4 1.1 ACRONYMS & ABBREVIATIONS................................................................................................ 4 1.2 BASIC TERMS ................................................................................................................................. 5 DESCRIPTION OF PROJECT ....................................................................................................... 6 2.1 SUMMARY (EXAMPLE BELOW) ................................................................................................. 6 2.2 BACKGROUND ............................................................................................................................... 6 2.3 SCOPE OF PROJECT ....................................................................................................................... 6 2.4 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS (DETAILS NOT ALWAYS NECESSARY, IF NOT, SAY THE GOVERNMENT WILL NOT FURNISH ANYTHING FOR THIS PROJECT; THIS IS AN EXAMPLE BELOW) ............................................... Error! Bookmark not defined. 2.5 SALVAGE (DETAILS NOT ALWAYS NECESSARY, IF NOT, SAY THE GOVERNMENT WILL NOT SALVAGE ANYTHING FROM THIS PROJECT; THIS IS AN EXAMPLE BELOW)Error! Bookmark not defined. DESIGN REQUIREMENTS ........................................................................................................... 8 3.1 SUMMARY....................................................................................................................................... 8 3.2 NATURE/EXTENT OF DESIGN (CHANGE THIS FOR PROJECT SPECIFICS, EXAMPLE BELOW) 8 3.3 RESPONSIBILITY ........................................................................................................................... 8 3.4 DESIGN STANDARDS (ADD ANY OTHER RELEVANT UFCs, CODES, AND STANDARDS)8 3.5 DRAWINGS ...................................................................................................................................... 9 3.6 DESIGN SUBMITTALS (CHECK DAYS IN RED IN SECTION 3.6.2) .......................................10 3.7 DESIGN REVIEWS .........................................................................................................................11 3.8 CONFERENCES ..............................................................................................................................12 ADMINISTRATION OF CONSTRUCTION ................................................................................13 4.1 PERFORMANCE CAPABILITIES (VERIFY RED TEXT IN THIS SECTION ON EACH PROJECT) 13 4.2 COMMENCEMENT, PROSECUTION & COMPLETION (PERIOD OF PERFORMANCE IN 4.2.3) 14 4.3 SCHEDULING .................................................................................................................................15 4.4 MANAGING ....................................................................................................................................17 4.5 MATERIAL SUBMITTALS AND SHOP DRAWINGS .................................................................17 4.6 WORK BY GOVERNMENT ...........................................................................................................19 4.7 PRE-FINAL AND FINAL INSPECTION .......................................................................................19 4.8 WARRANTY ...................................................................................................................................20 4.9 CONTRACTOR OFFICE.................................................................................................................21 4.10 CONSTRUCTION SITES ................................................................................................................22 4.11 CONSTRUCTION EQUIPMENT....................................................................................................24 -- 2 of 39 -- COLUMBUS AFB, MS PROJECT NUMBER: EEPZ254665 Replace STUS Backup Generator,B268 PAGE 3 of 39 4.12 AVAILABILITY OF UTILITY SERVICES AT JOB SITES..........................................................24 4.13 TEMPORARY UTILITIES ..............................................................................................................24 4.14 CONSTRUCTION SECURITY .......................................................................................................25 QUALITY REQUIREMENTS .......................................................................................................27 5.1 QUALITY CONTROL PLAN .........................................................................................................27 5.2 TESTING AND INSPECTION SERVICES ....................................................................................28 5.3 MANUFACTURERS' FIELD SERVICES ......................................................................................29 5.4 PRODUCT REQUIREMENTS ........................................................................................................29 5.5 CLOSEOUT PROCEDURES...........................................................................................................30 SAFETY, HEALTH AND ENVIRONMENTAL PROTECTION ................................................32 6.1 SAFETY AND HEALTH .................................................................................................................32 6.2 GENERAL........................................................................................................................................32 6.3 HAZARDOUS MATERIAL ....................................................

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)