Z--Expansion of the PIFSC Glider Lab, JBPHH

COMMERCE, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
1305M326Q0332
NAICS
236220
PSC
Z2JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 24, 2026
Response due
August 7, 2026

What this opportunity is

The U.S. Department of Commerce is seeking a contractor for improvements to the NOAA Inouye Regional Center at Joint Base Pearl Harbor-Hickam, specifically involving the renovation of Building 130, Room 2109. This project includes wall modifications, utility documentation, and the safe termination of plumbing and electrical lines, making it suitable for small businesses as it is a total small business set-aside. Interested contractors should note that this is a solicitation notice, indicating the need to prepare a bid rather than simply track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

U.S. Department of Commerce National Oceanic and Atmospheric Administration Page 1 of 7 STATEMENT OF WORK for Improvements to Building 130 Room 2109 (Revised 17 JULY 2026) 1.0 Background The National Oceanic and Atmospheric Administration (NOAA), Inouye Regional Center (IRC), laboratories are located on Ford Island, Joint Base Pearl Harbor-Hickam (JBPHH). This requirement for NOAA includes the removal of part of an existing wall between rooms 2108A and 2109 located in Building 130, the installation of a door, and other scope items as listed in Section 3.0. The place of performance address is NOAA Inouye Regional Center, 1845 Wasp Boulevard., Bldg. #130, Honolulu, Hawaii 96818. See solicitation for site visit details. 2.0 Period of Performance The period of performance shall be four (4) months from date of award. However, the expectation is that the contractor shall complete the work specified in this SOW within 30-calendar days of notice to proceed. 3.0 Scope 3.1 Identify and document all utilities (plumbing, electrical, data, etc.) within or adjacent to the wall and new doorway. 3.2 Disconnect and safely terminate any plumbing and electrical lines within the wall, according to applicable codes. 3.1 The Contractor shall remove the existing databox and pull back all existing ethernet and fiber optic data lines into the ceiling space. These lines shall then be tagged and neatly coiled and secured. Termination of the data lines is not required. 3.1.1 All low-voltage copper (CAT UTP) and optical fiber cabling that is disconnected from work area outlets but intended for future reuse shall not be considered abandoned, provided it is strictly identified in accordance with NFPA 70 (National Electrical Code) Articles 640.6(C), 722.25, 770.25, and 800.25. 3.1.2 Tag Placement and Location Requirements: 3.1.2.1. Contractor shall install a minimum of two (2) tags per cable run: one at the telecommunications enclosure/MDF patch panel end, and one at the room outlet end. 3.1.2.2. For cable tray runs exceeding 50 feet within the false ceiling, intermediate tags must be applied every 25 feet to ensure clear visibility for fire inspectors without moving adjacent cables. 3.1.2.3. Tags must be placed on the visible, upper-facing side of the cable jacket when resting inside cable trays. -- 1 of 7 -- Page 2 of 7 3.1.3. Tag Durability and Material Specifications: 3.1.3.1. Material: Tags must be industrial-grade, non-conductive, tear-resistant, and flame-retardant (e.g., rigid vinyl, polyolefin, or heavy-duty nylon). Paper or standard masking tape labels are strictly prohibited. 3.1.2.2. Attachment: Tags must be securely fastened to the cable utilizing heavy-duty, plenum-rated (UV and heat-resistant) nylon cable ties or self-laminating wrap-around adhesives. 3.1.3.3. Legibility: Text must be mechanically printed (label maker) using smear-proof, chemical-resistant thermal transfer ink. Hand-written markers are not acceptable. 3.1.4. Mandatory Tag Information Content: Each tag must explicitly display the following data points in a legible font size (minimum 10pt): 3.1.4.1. Regulatory Status Statement: "RESERVED FOR FUTURE USE" 3.1.4.2. Date of Designation: [MM/DD/YYYY] 3.1.4.3. Cable Source & Destination ID: (e.g., OUTLET: RRRR_OO_PP to MDF_CC_PPX_P, R is the Room, O is the outlet, P is the port, C is the Cabinet, X is the Patch Panel, P is the port) 3.1.4.4. Cable Type & Media: (e.g., CAT6a UTP / Single-Mode Fiber Optic) 3.1.4.5. Point of Contact: NOAA / PIFSC / K.WONG 3.2 Remove approximately 12 FT of the wall between rooms 2108A and 2109. See Figures 2 and Figures 3 which show the wall from both sides. 3.3 Remove and dispose of the sink, cabinets, desk, shelving, and related appurtenances attached to the wall in rooms 2108A and 2109. 3.4 Install a door between rooms 2109 and room 2110. (See Figures 4 and 5.) 3.4.1 Door type shall be heavy-duty industrial 4 FT (48-inch) single-leaf door, 7 FT tall. 3.4.2 Provide a Heavy-Duty Mortise Lockset configured for Office / Entry Function. The outside lever can be locked or unlocked by a key on the outside, or by a thumbturn / push-button on the inside. When unlocked, anyone can turn the handle and enter. The inside handle always allows free exit. To ensure seamless facility integration, the lock cylinder must feature a core which shall match the existing facility master key system. For lock function purposes, room 2109 is considered the “inside” and room 2110 is considered the “outside”. 3.4.3 The installation must feature a 90-minute fire-rated UL labeled door assembly, equipped with a listed self-closer, and functional positive latching. 3.4.4 The studs framing the door opening (the jamb studs) shall be reinforced to prevent the weight of the door from twisting the wall framework over time. -- 2 of 7 -- Page 3 of 7 3.4.5 Provide a commercial-grade, heavy-duty continuous stainless steel pin-and-barrel hinge (Type 304, 14-gauge). The assembly must utilize internal bearings to prevent door sag over time. 3.4.6 Door opening shall have no threshold, allowing a completely flush transition between flooring surfaces for unobstructed equipment traffic. If a threshold is unavoidable, a heavy-duty, ADA-compliant saddle threshold (maximum 1/2" height) that is beveled to allow wheels to roll over smoothly shall be used. 3.4.7 Door shall swing into room 2110. 3.5 Patch and repair any damage to remaining walls or surfaces. 3.6 Trim and finish to match existing finishings. 3.7 Patch and repair any damage to the concrete floor to remove any trip hazard. Finish to match existing. 4.0 Quality Assurance 4.1 Contractor shall provide not less than 1-year warranty on the installation and installed products. Any manufacturer’s warranties of greater than 1 year shall be honored. 4.2 Verify functional operation in the presence of the Technical Point of Contact (TPOC). 5.0 Contractor Personnel 5.1. The Contractor shall provide qualified personnel in sufficient quantities to meet the require

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)