B334 Repair Kitchen Flooring
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
FA303026R0006
NAICS
238330
PSC
Z2AA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 18, 2026
Response due
July 20, 2026
Place of performance
Goodfellow AFB, TX
What this opportunity is
The Department of Defense is buying flooring repair services, specifically demolishing and replacing existing quarry tile with a new resinous flooring system, which suits total small businesses. The work will be performed in Texas. As this is a solicitation notice, small businesses should track the opportunity and prepare to bid by the specified deadline.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Specifications Manual
Design-Bid-Build (DBB)
JCGU 25-7007, Repair Kitchen Flooring B334
Goodfellow AFB, TX
Prepared by:
Engineering Flight (CEN)
17th Civil Engineer Squadron
460 Kearney Blvd, B3511
Goodfellow AFB, TX 76908
Date: 12/17/2025
ISSUED FOR CONSTRUCTION
-- 1 of 191 --
Section 00 00 00 Page 1
Repair Kitchen Flooring B334 JCGU 25-7007
Goodfellow AFB, TX
SECTION 00 00 00
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 TABLE OF CONTENTS
00 01 15 LIST OF DRAWINGS
00 41 00 BID SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 01 10-IC INFECTION CONTROL
01 11 00 SUMMARY OF WORK
01 12 17 JOB MEETINGS
01 18 00 PROJECT UTILITIES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16.00 20 PROJECT SCHEDULE (SMALL PROJECTS)
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 56 00 ENVIRONMENTAL PROTECTION
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 – CONCRETE
03 01 00 REHABILITATION OF CONCRETE
DIVISION 09 – FINISHES
09 67 13.13 STANDARD RESINOUS FLOORING
DIVISION 10 – SPECIALTIES
10 26 00 WALL PROTECTION
DIVISION 11- EQUIPMENT
11 05 40 COMMON WORK RESULTS FOR FOOD SERVICE EQUIPMENT
-- End of Project Table of Contents --
-- 2 of 191 --
DOCUMENT 00 01 15 Page 1
Repair Kitchen Flooring B334 JCGU 25-7007
Goodfellow AFB, TX
DOCUMENT 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract
clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications"
are provided and form a part of the contract.
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NO. TITLE
G-001 COVER SHEET
G-002 GENERAL INFORMATION 1
G-003 GENERAL INFORMATION 2
G-004 PHASING PLAN
AD-101 DEMOLITION AND NEW FLOORPLAN
Q-101 EQUIPMENT PLAN
P-101 SANITARY SEWER PLAN
-- End of Document --
-- 3 of 191 --
Repair Kitchen Flooring B334
Goodfellow AFB, TX
JCGU 25-7007
SECTION 00 41 00 Page 1
SECTION 00 41 00
BID SCHEDULE
PART 1 GENERAL
1.1 SUMMARY
This section lists the bid schedule and schedule of contract line-item numbers
(CLINs) defined in the technical provisions of the contract.
1.2 CONTRACT LINE-ITEM NUMBER (CLIN)SCHEDULE
The design-bid-build (DBB) project delivery team shall provide all tools,
equipment, material, labor, and supervision necessary to perform all work
subject to the terms and conditions required by contract.
The total project performance period shall be ONE HUNDRED AND SIXTY FOUR (164)
CALENDAR DAYS. The total performance period includes time prescribed for
Government transitions and phasing as described in the project documents.
CLIN DESCRIPTION QTY UNIT PRICE AMOUNT
0001 (Basic: B334 Kitchen Repair): All costs associated with the demolition,
repair, and replacement of the kitchen flooring in B334. This includes all
time and costs associated with constructing/deconstructing temporary
partitions, floor demolition and preparation, application of new flooring,
site cleanup, and demobilization. This CLIN does not include any of the
following CLINs within it.
Job L.S. **** $
UNIT TOTAL
0002 (Basic: Furnishings): All costs associated with inventory, removal,
storage, sanitization, cleaning, and reinstallation of all kitchen
equipment. This includes costs of temporary storage units such as storage
containers along with costs to clean and sanitize equipment upon successful
hookup and installation.
Job L.S. **** $
UNIT TOTAL
TOTAL CLIN (ALL): CLIN 0001 + CLIN 0002
$
TOTAL
-- End of Document –
-- 4 of 191 --
Repair Kitchen Flooring B334
Goodfellow AFB, TX
JCGU 25-7007
Section 01 00 00 Page 1
SECTION 01 00 00
GENERAL REQUIREMENTS
(1) GENERAL
1.13 SCOPE OF WORK
The work covered by this specification consists of furnishing all
plant, labor, equipment, and material, and performing all work in
connection with JCGU 25-7007 “Repair Kitchen, B334” in strict
accordance with these specifications and drawings and subject to the
terms and conditions of this contract.
1.14 LOCATION
The work is to be accomplished at Goodfellow AFB, San Angelo, Texas.
This base is accessible by public highway. Contractor access to the
work area will be as indicated in the project drawings.
1.15 WORK SCHEDULE
A. The contractor shall observe the same regular workweek being observed
by the Goodfellow AFB Civil Engineering shop forces, which is Monday
through Friday, from 7:30 a.m. to 4:30 p.m., with Federal holidays
excluded. Any Holiday falling on a Saturday will be observed the
preceding Friday. Any Holiday falling on a Sunday will be observed the
following Monday.
B. Any deviation from this schedule will require 48 hours advance notice
and approval of the Contracting Officer. If base personnel are
reasonably available, the Contracting Officer may authorize the
Contractor to perform work during periods other than normal duty
hours/days.
C. Due to the critical nature of the dining facility to Goodfellow AFB,
the Contractor may be required to work nights, weekends, and/or
holidays in order to ensure 100% completion of all work items within
the prescribed performance period.
D. The base could be closed because of security problems, adverse weather,
or other events. Unless otherwise notified by the Government, the
Contractor should monitor local television stations, radio stations, or
Goodfellow’s Facebook page for notification of a possible base closure
or late opening. The Contractor may not receive any other form of
notification of a base closure from the Government, unless contacted by
the Contracting Officer (CO) or the Contracting Officer Representative
(COR). The Contractor is responsible for notifying his/her employees.
Contractor(s) do not report when the base is closed due to security
problems and/or adverse weather.
1.4 TOBACO U…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238330)
Refurbish Wash Rack Floor - F129, Vance AFB, OK
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 25, 2026
USCG Base Astoria Hanger Carpet and Flooring Project
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due June 18, 2026
Request for Pricing Proposal – Replacement of carpeting in US Consulate Johannesburg (PR16068545)
STATE, DEPARTMENT OF · Solicitation · due July 10, 2026
Repair Flooring Student Pilot Housing, Multiple Facilities
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 22, 2026
FCC BUTNER - BUT INTERIOR REPAIRS - FLOORING SYSTEM
JUSTICE, DEPARTMENT OF · Solicitation · due July 8, 2026
Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001
DEPT OF DEFENSE · Solicitation · due June 17, 2026