B334 Repair Kitchen Flooring

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA303026R0006
NAICS
238330
PSC
Z2AA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 18, 2026
Response due
July 20, 2026
Place of performance
Goodfellow AFB, TX

What this opportunity is

The Department of Defense is buying flooring repair services, specifically demolishing and replacing existing quarry tile with a new resinous flooring system, which suits total small businesses. The work will be performed in Texas. As this is a solicitation notice, small businesses should track the opportunity and prepare to bid by the specified deadline.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Specifications Manual Design-Bid-Build (DBB) JCGU 25-7007, Repair Kitchen Flooring B334 Goodfellow AFB, TX Prepared by: Engineering Flight (CEN) 17th Civil Engineer Squadron 460 Kearney Blvd, B3511 Goodfellow AFB, TX 76908 Date: 12/17/2025 ISSUED FOR CONSTRUCTION -- 1 of 191 -- Section 00 00 00 Page 1 Repair Kitchen Flooring B334 JCGU 25-7007 Goodfellow AFB, TX SECTION 00 00 00 TABLE OF CONTENTS DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS 00 00 00 TABLE OF CONTENTS 00 01 15 LIST OF DRAWINGS 00 41 00 BID SCHEDULE DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 GENERAL REQUIREMENTS 01 01 10-IC INFECTION CONTROL 01 11 00 SUMMARY OF WORK 01 12 17 JOB MEETINGS 01 18 00 PROJECT UTILITIES 01 30 00 ADMINISTRATIVE REQUIREMENTS 01 32 16.00 20 PROJECT SCHEDULE (SMALL PROJECTS) 01 33 00 SUBMITTAL PROCEDURES 01 35 26 GOVERNMENT SAFETY REQUIREMENTS 01 45 00.00 10 QUALITY CONTROL 01 56 00 ENVIRONMENTAL PROTECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 01 78 00 CLOSEOUT SUBMITTALS DIVISION 02 – EXISTING CONDITIONS 02 41 00 DEMOLITION DIVISION 03 – CONCRETE 03 01 00 REHABILITATION OF CONCRETE DIVISION 09 – FINISHES 09 67 13.13 STANDARD RESINOUS FLOORING DIVISION 10 – SPECIALTIES 10 26 00 WALL PROTECTION DIVISION 11- EQUIPMENT 11 05 40 COMMON WORK RESULTS FOR FOOD SERVICE EQUIPMENT -- End of Project Table of Contents -- -- 2 of 191 -- DOCUMENT 00 01 15 Page 1 Repair Kitchen Flooring B334 JCGU 25-7007 Goodfellow AFB, TX DOCUMENT 00 01 15 LIST OF DRAWINGS PART 1 GENERAL 1.1 SUMMARY This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications" are provided and form a part of the contract. 1.2 CONTRACT DRAWINGS Contract drawings are as follows: DRAWING NO. TITLE G-001 COVER SHEET G-002 GENERAL INFORMATION 1 G-003 GENERAL INFORMATION 2 G-004 PHASING PLAN AD-101 DEMOLITION AND NEW FLOORPLAN Q-101 EQUIPMENT PLAN P-101 SANITARY SEWER PLAN -- End of Document -- -- 3 of 191 -- Repair Kitchen Flooring B334 Goodfellow AFB, TX JCGU 25-7007 SECTION 00 41 00 Page 1 SECTION 00 41 00 BID SCHEDULE PART 1 GENERAL 1.1 SUMMARY This section lists the bid schedule and schedule of contract line-item numbers (CLINs) defined in the technical provisions of the contract. 1.2 CONTRACT LINE-ITEM NUMBER (CLIN)SCHEDULE The design-bid-build (DBB) project delivery team shall provide all tools, equipment, material, labor, and supervision necessary to perform all work subject to the terms and conditions required by contract. The total project performance period shall be ONE HUNDRED AND SIXTY FOUR (164) CALENDAR DAYS. The total performance period includes time prescribed for Government transitions and phasing as described in the project documents. CLIN DESCRIPTION QTY UNIT PRICE AMOUNT 0001 (Basic: B334 Kitchen Repair): All costs associated with the demolition, repair, and replacement of the kitchen flooring in B334. This includes all time and costs associated with constructing/deconstructing temporary partitions, floor demolition and preparation, application of new flooring, site cleanup, and demobilization. This CLIN does not include any of the following CLINs within it. Job L.S. **** $ UNIT TOTAL 0002 (Basic: Furnishings): All costs associated with inventory, removal, storage, sanitization, cleaning, and reinstallation of all kitchen equipment. This includes costs of temporary storage units such as storage containers along with costs to clean and sanitize equipment upon successful hookup and installation. Job L.S. **** $ UNIT TOTAL TOTAL CLIN (ALL): CLIN 0001 + CLIN 0002 $ TOTAL -- End of Document – -- 4 of 191 -- Repair Kitchen Flooring B334 Goodfellow AFB, TX JCGU 25-7007 Section 01 00 00 Page 1 SECTION 01 00 00 GENERAL REQUIREMENTS (1) GENERAL 1.13 SCOPE OF WORK The work covered by this specification consists of furnishing all plant, labor, equipment, and material, and performing all work in connection with JCGU 25-7007 “Repair Kitchen, B334” in strict accordance with these specifications and drawings and subject to the terms and conditions of this contract. 1.14 LOCATION The work is to be accomplished at Goodfellow AFB, San Angelo, Texas. This base is accessible by public highway. Contractor access to the work area will be as indicated in the project drawings. 1.15 WORK SCHEDULE A. The contractor shall observe the same regular workweek being observed by the Goodfellow AFB Civil Engineering shop forces, which is Monday through Friday, from 7:30 a.m. to 4:30 p.m., with Federal holidays excluded. Any Holiday falling on a Saturday will be observed the preceding Friday. Any Holiday falling on a Sunday will be observed the following Monday. B. Any deviation from this schedule will require 48 hours advance notice and approval of the Contracting Officer. If base personnel are reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days. C. Due to the critical nature of the dining facility to Goodfellow AFB, the Contractor may be required to work nights, weekends, and/or holidays in order to ensure 100% completion of all work items within the prescribed performance period. D. The base could be closed because of security problems, adverse weather, or other events. Unless otherwise notified by the Government, the Contractor should monitor local television stations, radio stations, or Goodfellow’s Facebook page for notification of a possible base closure or late opening. The Contractor may not receive any other form of notification of a base closure from the Government, unless contacted by the Contracting Officer (CO) or the Contracting Officer Representative (COR). The Contractor is responsible for notifying his/her employees. Contractor(s) do not report when the base is closed due to security problems and/or adverse weather. 1.4 TOBACO U

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗