Refurbish Wash Rack Floor - F129, Vance AFB, OK

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
FP1020977
NAICS
238330
PSC
Z2JZ
Set-aside
No Set aside used
Posted
June 18, 2026
Response due
June 25, 2026
Place of performance
Enid, OK

What this opportunity is

The Department of Defense is soliciting bids for the refurbishment of the wash rack floor at Vance Air Force Base in Oklahoma under the NAICS code 238330. This is a non-set-aside procurement, meaning it is open to all eligible businesses. The notice type is a Combined Synopsis/Solicitation, which requires bidders to track the solicitation for updates. The work will be performed in Oklahoma, and the statement of work is available in version 4.0.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Design Percent Completion: 100% April 30, 2026 Statement of Work REFURBISH WASH RACK FLOOR, F129 VANCE AIR FORCE BASE, OKLAHOMA FACILITY PROJECT ID FP1020977 PREPARED BY ZEB MCCOLLUM -- 1 of 27 -- 400 Young Road Vance AFB, OK 73705 580.213.7174 FP1020977 Page 1 of 13 Refurbish Wash Rack Floor, F129 SoW Version 4.0 INDEX PART 1 GENERAL .......................................................................................................................................... 2 1.01. PROJECT DESCRIPTION ....................................................................................................................... 2 1.02. INSTRUCTIONS TO BIDDERS ................................................................................................................ 2 1.03. LOCATION OF WORK ........................................................................................................................... 2 1.04. SCOPE OF WORK ................................................................................................................................. 2 1.05. CHANGES ............................................................................................................................................. 5 1.06. WARRANTY .......................................................................................................................................... 6 1.07. SCHEDULE OF WORK........................................................................................................................... 6 1.08. WORK RESTRICTIONS .......................................................................................................................... 6 1.09. CONTRACTOR’S REPRESENTATIVE ...................................................................................................... 8 1.10. PROVIDED SERVICES AND UTILITIES ................................................................................................... 9 1.11. INSPECTION ......................................................................................................................................... 9 1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE) ........................................... 9 1.13. SPECIAL MATERIALS ............................................................................................................................ 9 1.14. MATERIALS ........................................................................................................................................ 10 PART 2 EXECUTION .................................................................................................................................... 11 2.01. SITE SAFETY REQUIREMENTS ............................................................................................................ 11 2.02. INSTALLATION ................................................................................................................................... 11 PART 3 SITE INFORMATION ....................................................................................................................... 12 PART 4 APPENDICES ................................................................................................................................... 13 4.01. APPENDIX A – SITE PHOTOS.............................................................................................................. 13 4.02. APPENDIX B – BID FORM .................................................................................................................. 13 4.03. APPENDIX C – DRAWINGS ................................................................................................................. 13 4.04. APPENDIX D – SPECIFICATIONS ........................................................................................................ 13 4.05. APPENDIX E – SCHEDULE E ............................................................................................................... 13 -- 2 of 27 -- 400 Young Road Vance AFB, OK 73705 580.213.7174 FP1020977 Page 2 of 13 Refurbish Wash Rack Floor, F129 SoW Version 4.0 PART 1 GENERAL 1.01. PROJECT DESCRIPTION A. The work covered under this Statement of Work shall consist of the removal and installation of new high-performance floor coating, expansion joint compound, repairing and leveling cracks, development of a floor striping plan, and any incidental work necessary to provide a complete and usable finished product. All surface preparation and high-performance floor coating installation shall be performed in strict accordance with APPENDIX D – SPECIFICATIONS. 1.02. INSTRUCTIONS TO BIDDERS A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX B – BID FORM, along with all required documentation as stated in Sam.gov. B. Owner reserves the right to reject any bid which does not completely satisfy the Statement of Work. 1.03. LOCATION OF WORK A. Location of work to be accomplished under this statement of work is at Vance Air Force Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. Facility 129 is located northwest of the intersection of Elam Road and Channel Street. 1.04. SCOPE OF WORK A. The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools, and other items to complete the construction as listed in the Scope of Work. All quotes shall include all shipping charges for completion of the project. The contractor will coordinate all work with ASRC Federal (ASRC) Construction Management prior to execution. The list of items below are to be considered the general Scope of Work for the project. B. The Contractor shall field verify location of work, dimensions, and existing site conditions prior to commencing work. The Contractor shall contact ASRC Construction Management for any discrepancies with the Scope of Work. C. The contractor is to remove existing floor coating and j

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238330)