What this opportunity is
The Department of Defense is soliciting bids for the refurbishment of the wash rack floor at Vance Air Force Base in Oklahoma under the NAICS code 238330. This is a non-set-aside procurement, meaning it is open to all eligible businesses. The notice type is a Combined Synopsis/Solicitation, which requires bidders to track the solicitation for updates. The work will be performed in Oklahoma, and the statement of work is available in version 4.0.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Design Percent Completion: 100%
April 30, 2026
Statement of Work
REFURBISH WASH RACK FLOOR, F129
VANCE AIR FORCE BASE, OKLAHOMA
FACILITY PROJECT ID FP1020977
PREPARED BY ZEB MCCOLLUM
-- 1 of 27 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1020977 Page 1 of 13 Refurbish Wash Rack Floor, F129
SoW Version 4.0
INDEX
PART 1 GENERAL .......................................................................................................................................... 2
1.01. PROJECT DESCRIPTION ....................................................................................................................... 2
1.02. INSTRUCTIONS TO BIDDERS ................................................................................................................ 2
1.03. LOCATION OF WORK ........................................................................................................................... 2
1.04. SCOPE OF WORK ................................................................................................................................. 2
1.05. CHANGES ............................................................................................................................................. 5
1.06. WARRANTY .......................................................................................................................................... 6
1.07. SCHEDULE OF WORK........................................................................................................................... 6
1.08. WORK RESTRICTIONS .......................................................................................................................... 6
1.09. CONTRACTOR’S REPRESENTATIVE ...................................................................................................... 8
1.10. PROVIDED SERVICES AND UTILITIES ................................................................................................... 9
1.11. INSPECTION ......................................................................................................................................... 9
1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE) ........................................... 9
1.13. SPECIAL MATERIALS ............................................................................................................................ 9
1.14. MATERIALS ........................................................................................................................................ 10
PART 2 EXECUTION .................................................................................................................................... 11
2.01. SITE SAFETY REQUIREMENTS ............................................................................................................ 11
2.02. INSTALLATION ................................................................................................................................... 11
PART 3 SITE INFORMATION ....................................................................................................................... 12
PART 4 APPENDICES ................................................................................................................................... 13
4.01. APPENDIX A – SITE PHOTOS.............................................................................................................. 13
4.02. APPENDIX B – BID FORM .................................................................................................................. 13
4.03. APPENDIX C – DRAWINGS ................................................................................................................. 13
4.04. APPENDIX D – SPECIFICATIONS ........................................................................................................ 13
4.05. APPENDIX E – SCHEDULE E ............................................................................................................... 13
-- 2 of 27 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1020977 Page 2 of 13 Refurbish Wash Rack Floor, F129
SoW Version 4.0
PART 1 GENERAL
1.01. PROJECT DESCRIPTION
A. The work covered under this Statement of Work shall consist of the removal and
installation of new high-performance floor coating, expansion joint compound, repairing
and leveling cracks, development of a floor striping plan, and any incidental work
necessary to provide a complete and usable finished product. All surface preparation and
high-performance floor coating installation shall be performed in strict accordance with
APPENDIX D – SPECIFICATIONS.
1.02. INSTRUCTIONS TO BIDDERS
A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX B –
BID FORM, along with all required documentation as stated in Sam.gov.
B. Owner reserves the right to reject any bid which does not completely satisfy the
Statement of Work.
1.03. LOCATION OF WORK
A. Location of work to be accomplished under this statement of work is at Vance Air Force
Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. Facility
129 is located northwest of the intersection of Elam Road and Channel Street.
1.04. SCOPE OF WORK
A. The Contractor shall furnish all supervision, labor, equipment, consumable materials,
supplies, tools, and other items to complete the construction as listed in the Scope of
Work. All quotes shall include all shipping charges for completion of the project. The
contractor will coordinate all work with ASRC Federal (ASRC) Construction Management
prior to execution. The list of items below are to be considered the general Scope of
Work for the project.
B. The Contractor shall field verify location of work, dimensions, and existing site conditions
prior to commencing work. The Contractor shall contact ASRC Construction Management
for any discrepancies with the Scope of Work.
C. The contractor is to remove existing floor coating and j…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238330)
B334 Repair Kitchen Flooring
DEPT OF DEFENSE · Solicitation · due July 20, 2026
USCG Base Astoria Hanger Carpet and Flooring Project
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due June 18, 2026
Request for Pricing Proposal – Replacement of carpeting in US Consulate Johannesburg (PR16068545)
STATE, DEPARTMENT OF · Solicitation · due July 10, 2026
Repair Flooring Student Pilot Housing, Multiple Facilities
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 22, 2026
Replace Carpet Multiple Buildings
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 7, 2026
Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001
DEPT OF DEFENSE · Solicitation · due June 17, 2026