What this opportunity is
The Department of Defense is soliciting bids for backup batteries under NAICS 335910 and PSC 6140, with a total small business set-aside. This opportunity is suitable for small businesses that can meet specific requirements, including MIL-STD packaging and government source inspection. Interested vendors should note that the solicitation requires electronic submission of quotes and emphasizes the need for compliance with IUID requirements. Tracking this notice is essential for small businesses looking to bid, as it indicates a competitive procurement process.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CONTACT INFORMATION|4|N711.13|BC5|771-229-0408|rachael.l.costanzo.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO|N/A|TO BE DETERMINED (TBD)|N00104|TBD|TBD|W25G1U & W62G2T|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|RACHAEL.L.COSTANZO.CIV@US.NAVY.MIL|
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
OPTION FOR INCREASED QUANTITY (MAR 1989)|1|179 DAYS |
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^
A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to RACHAEL.L.COSTANZO.CIV@US.NAVY.MIL.
B. General Requirements: MIL-STD Packaging, Government Source Inspection Required.
C. All freight is FOB Origin.
D. This RFQ is for a BUY/Procurement. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
E. Must adhere to IUID requirements of DFARS 252.211-7003
F. The ultimate awardee of the proposed contract action must be an authorized source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization.
G. Your quote should include the following information for justification purposes:
- New procurement unit price____________________
- Total Price _____________________
- Procurement delivery lead time (PTAT) _________________ days
- Award to CAGE _______________
- Inspection & Acceptance CAGE, if not at Award to CAGE _____________
- Cost breakdown requested, including profit rate (if feasible).
- Quote expiration date _______________ (90 Days minimum is requested).
- Delivery Vehicle (If Delivery Order requested)(e.g. if your CAGE has a current BOA/IDIQ)
H. Important Traceability Notice:
If you are not the manufacturer of the material you are offering, you must provide an official letter and/or email from the OEM confirming that your company is an authorized distributor of their items.
J. OPTIONS
PROSPECTIVE OPTION QUANTITY UP TO 100%
NOTES:
The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, The government requests up to a 100% (30 EA) option for a period of 180 days. The option grants the Government the unilateral authority to increase
this order up to the above quantity within 365 days of the contract award date. This will incorporate FAR Clause 52.217-6 (Option for Increased Quantity) into the award. The Government may increase the quantity of supplies called for in the Schedule at the unit
price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract,
unless the parties otherwise agree. A modification will be completed at the time the option is exercised and all current contract terms and conditions will apply to the option quantity.
Please indicate if the Contracting Officer may exercise the 100% option quantity for the contract.
Yes ____ or No ____
Or if you request a variation to the option please let me know in your quote.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the BATTERY, BACK UP .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The BATTERY, BACK UP furnished under this
contract/purchase order shall be the design represented by Cage Code(s)
reference number(s). Cage _______ ref. no.
;1BCN7 372-16375
1BCN7 223-16235-3;
3.2 Marking - This item shall be physically identified in accordance
with ;MIL-STD-130, REV N, 16 NOV 2012; .
3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and
approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the
substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government
evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:
Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's P…
Source: SAM.gov, as posted. Verify the current solicitation before responding.