What this opportunity is
The Department of Defense is seeking a contractor to provide materials, labor, equipment, and supervision for paint and flooring repairs in multiple barracks buildings at Camp Lejeune, North Carolina. This opportunity is set aside for total small businesses under NAICS 236220. The notice type is a Combined Synopsis/Solicitation, indicating that interested contractors should track the opportunity closely and prepare to submit bids based on the detailed requirements and specifications provided.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
DISTRIBUTION: DoW COMMUNITY ONLY
DATE: 6/24/26
PROJECT # 26M089CN
CONTRACT # 26-0434
TITLE: BUILDING BB260, BB265, BB270, BB274, BB275, BB355 PAINT AND FLOORING
REPAIRS
ATTACHMENTS: Paints-Coatings Specifications, Resilient Flooring Specs, Material Quantity Data
Sheet, Finish Legend, Combined Division 01 Specifications, Contractor Environmental Guide, Building
Floor Plans
SCOPE OF WORK:
The contractor shall provide all material, labor, equipment, and supervision required to accomplish the
following:
GENERAL DESCRIPTION
The responsibility of the contractor is to prep, paint, and replace the flooring systems in the following
buildings listed in the project area description according to the general requirements. All measurements are
for reference only and are to be field verified by contractor. The point of contact for access to the building
is listed below in the project area descriptions.
DETAILED REQUIREMENTS AND SPECIFICATIONS
1.) Project Area Description
a. Building BB260 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune.
b. Building BB265 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune
c. Building BB270 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune
d. Building BB274 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune.
e. Building BB275 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune.
f. Building BB355 is a BEQ located on Munro Rd. at Court House Bay Camp Lejeune
2.) General Requirements - Paint Repairs (As Applicable)
a. Paint all previously painted surfaces throughout the interior and exterior of the building. This
will include all wall surfaces, doors, door frames, and window frames.
b. Repair all cracks, holes, and damaged surfaces to provide a solid foundation for painting. If
there are significant repairs needed (greater than 50 S.F.), it shall be noted below in the
project area description.
c. Clean and treat mold and mildew areas for finish coating application.
d. Apply interior / exterior finish surfacing compound as appropriate to any damaged surfaces to
match surrounding finishes.
e. Replace any damaged or rotten trim boards, siding, or moldings, as quantified in the work
area descriptions. Replace any loose, damaged, or missing caulking and glazing compound
on windows, doors and other surfaces on the interior and exterior.
f. Secure any loose trim boards, siding, or moldings that are not damaged or rotten.
g. All repaired surfaces will be primed with latex KILZ 2 or equivalent unless otherwise noted in
the project area description section.
h. All metal surfaces shall have (2) coats of latex direct to metal semi-gloss finish paint applied
unless otherwise noted in the project area description section.
i. All interior wall surfaces shall have (2) coats of eggshell / satin finish latex paint applied
unless otherwise noted in the project area description section.
j. All wood trim and doors shall have (2) coats of semi-gloss latex finish paint applied unless
otherwise noted in the project area description section.
k. All wood trim with natural finishes shall be sanded for finish appearance and (2) coats of
polyurethane finish coat shall be applied areas unless otherwise noted in the project area
description section.
-- 1 of 3 --
DISTRIBUTION: DoW COMMUNITY ONLY
l. All exterior masonry surfaces shall have (2) coats of Loxon masonry coating or equivalent
applied unless otherwise noted in the project area description section.
m. All EFIS finishes shall have (2) coats of Semi-gloss finish paint unless otherwise noted in the
project area description section.
n. All high bay areas shall have (2) coats of a high gloss coating applied to provide maximum
illumination of the work areas unless otherwise noted in the project area description section.
o. Apply KILZ 2 or equivalent primer sealer and (2) coats of mildew resistant latex semi-gloss
finish paint to all previously painted surfaces in the bathroom areas unless otherwise noted in
the project area description section.
p. Due to inadequate adhesion of previously painted finishes additional scrapping and
preparation shall be required for all wood, masonry and metal surfaces.
q. No roof surfaces are to be painted unless otherwise noted in the project area description.
r. Cover all furniture, possessions, and building components as required protecting them from
damage during accomplishment of interior and exterior painting. The contractor shall be
responsible for the removal and resetting of all furniture. This includes any required
disassembling and reassembling of furniture.
s. The contractor shall provide a storage container on site to store furniture and other large items
to keep them from being damaged during the work process. If work can be completed with
furniture items in the center of the room and properly covered to ensure they are not damaged,
then there is no need for a container to be utilized. The furniture will be the responsibility of
the contractor to move.
t. Remove and reinstall all electrical/data switch and receptacle covers, to ensure all previously
painted surfaces are repainted.
u. Paint over existing painted stenciled signage and replace with newly painted stenciled signage
with the same lettering or numbering.
v. Repaint all exposed piping and piping insulation. Stencil proper markings on piping.
w. Spray paint electrical panels, access panels, and expansion joints to match the adjacent wall
color. Panels painted by brush are not acceptable.
x. Clean all over-spray, drips, splatters and spills resulting from accomplishing this project from
all surfaces as appropriate.
y. No glass surfaces are to be painted unless otherwise noted in the project area description area.
z. Special scheduling shall be required on all the buildings listed below. Approximately ¼ of the
work areas shall be available for paint at one given time. It is the responsibility of the
contractor to coordinate a schedule with the point of conta…