Description
Performance Work Statement
305 MXG Bird Waste Cleaning
1. The scope of work is as follows in the Performance Work Statement (PWS). The
contractor, shall furnish all equipment unless other-wise specified. No alteration, additions
or deletions shall be made to the contract unless prior approval is given in writing by the
Contracting Officer (CO).
This acquisition is for the procurement of contactor services to provide bird waste cleaning
at JB MDL. 305 MXG requires four cleanings a year for eight buildings/hangars. The
Contractor shall provide own personnel, equipment, supplies, transportation, tools,
materials, services necessary to perform bird waste cleaning as defined in this Performance
Work Statement. Contractor shall insure all personnel requiring access to the installation
possess valid, federally compliant identification credential in accordance with current
REAL ID Act.
The Contractor is responsible for the proper handling, disposal of hazardous droppings and
materials generated by or utilized during the course of its activities. The Contractor shall
perform to the standards in this contract.
Whenever possible, work shall be performed during the standard 8-hour duty day, 5-day
week, Monday through Friday, between the hours of 7:00 AM and 4:00 PM local time,
excluding Federal legal holidays and non-workdays resulting from holidays occurring on
weekends. Work may be required during off-duty hours and weekends to meet special
requirements. Must notify in 24 hour advancement to Lead Facility Manager: Mr. John
Ingrassia at 609-754-5172/john.ingrassia@us.af.mil to schedule cleaning of the facilities.
Lead Facility Manager will provide an updated roster of building custodians for building/
hangar: 1751, 1757, 1817, 1837, 2251, 2253, 3209, and 3211 to contractor. Contractor
will contact building custodians with the scheduled time they will be at their facility.
Contractor will notify the building custodian and Lead Facility Manager, Mr. John
Ingrassia when each facility is completed.
The period of performance shall be for Base Year of 12 months and four 12 month option
periods. The Period of Performance reads as follows:
Base Period: 1 Oct 26 – 30 Sep 27
Option Year I: 1 Oct 27 – 30 Sep 28
Option Year II: 1 Oct 28 – 30 Sep 29
Option Year III: 1 Oct 29 – 30 Sep 30
Option Year IV: 1 Oct 30 – 30 Sep 31
2. The Contracting Officer Representative (COR) will be MXO Chief of Plans, Programs &
Resources: Mr. Paul Sigloch, he can be reached at 609-754-3624/paul.sigloch@us.af.mil.
The COR monitors all technical aspects of the contract and assists in contract
administration. The COR is authorized to perform the following functions: assure that the
Contractors performs the technical requirements of the contract, perform inspections
necessary in connection with contract performance, maintain written and oral
-- 1 of 3 --
communications with the Contractor concerning technical aspects of the contract, issue
written interpretations of technical requirements, monitors Contractors performance, and
notifies the Contracting Officer.
3. Project Description:
To contract a company for bird waste cleaning four times a year to remove all bird waste off
doors, floors, railings, tracks on doors, walls and open hangar flooring for the following
eight building/hangar: 1751, 1757, 1817, 1837, 2251, 2253, 3209, and 3211. Members from
each building/hangar will be responsible for moving equipment and other items out of the
way, if they are not moved, Contractors can clean around the equipment. During the winter
months, limited cleanings should be schedule due to equipment and weapon systems being
stored within hangars, deeming access to Contractors limited to control entry.
4. Cleaning Areas:
Building 1751: The contractor shall remove bird waste droppings from structure beams and
walls near garage door areas.
Building 1757: The contractor shall remove bird waste droppings from floor, walls, tracks
and frame structure on the back wall in the ETV Storage area only. All bird waste cleaning
may be required off-duty hours and weekends. The contractor must notify in 24hr
advancement to Lead Facility Manager: Mr. John Ingrassia at 609-754-5172 to schedule
cleaning of the facilities.
Building 1817: The contractor shall remove bird waste droppings from floor in the main
storage area.
Building 1837: The contractor shall remove bird waste droppings from open hangar floors,
tracks, and walls in A, B and C hangar bays.
Building 2251 (Dock 51): The contractor shall remove bird waste droppings from
floor,structure beams, hangar wall edges, hangar wall shelves, and walls under seven feet
tall.
Building 2253: The contractor shall remove bird waste droppings from garage door
entrances in the West Bay and High Bay.
Building 3209: The contractor shall remove bird waste droppings from lower hangar door
ledges up to four feet high, hangar door tracks to include corner hangar door pockets, and
hangar doors collections points of four total corners.
Building 3211: The contractor shall remove bird waste droppings from the foundation ledge,
lower structure pillars, around the edges of the hangar walls, support beams, and parking lot
side entrance lower support pillars.
-- 2 of 3 --
SERVICE SUMMARY
Building # PERFORMANCE OBJECTIVE
Minimum
Performance
Frequency
1751
Remove droppings from structure beams and walls near
garage door areas.
Four Times
Annually
1757
Remove droppings from floor, walls, tracks and frame
structure on the back wall in the ETV Storage area.
Four Times
Annually
1817
Remove droppings from floor in the main warehouse area. Four Times
Annually
1837
Four Times
Annually
2251
Remove droppings from floor, structure beams, hangar wall
edges, hangar wall shelves, and walls under seven feet tall.
Four Times
Annually
2253
Remove droppings from garage door entrances in the West
Bay and High Bay.
Four Times
Annually
3209
Remove droppings from lower hangar door ledges up to four
feet high, hangar door tracks to include corner hangar do…
Source: SAM.gov, as posted. Verify the current solicitation before responding.