CATHODIC PROTECTION SURVEY/INVENTORY/ASSESSMENT SERVICES

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
FA8051-SourcesSought-CathodicProtection
NAICS
541330
PSC
R425
Posted
October 21, 2026
Response due
November 23, 2026
Place of performance
64860, FL

What this opportunity is

The Department of Defense is seeking sources for cathodic protection survey, inventory, and assessment services under NAICS 541330. This opportunity is likely suited for small businesses specializing in engineering services related to corrosion control and protection. As a Sources Sought notice, this is primarily for market research purposes, meaning interested firms should track the opportunity rather than submit bids at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 Performance Work Statement (PWS) Project Title: CATHODIC PROTECTION SURVEY/INVENTORY/ASSESSMENT SERVICE CONTRACT (UFM 3-570-06, Chapter 3 Compliance) Location: [Insert DoW Installation / Base Name] Date: 21 Sep 26 1.0 Background & Objective The Department of War (DoW) installation at [Insert Base Name] utilizes various Cathodic Protection (CP) systems—both Impressed Current (ICCP) and Galvanic (Sacrificial)—to prevent the corrosion of critical underground and submerged metallic infrastructure (e.g., fuel lines, water tanks, distribution piping). The objective of this contract is to procure certified NACE/AMPP corrosion technical services to execute the rigorous schedule of inventory, surveys, assessments, and record- keeping mandated by UFM 3-570-06, Chapter 3 (Operation and Maintenance). 2.0 Scope of Work & Specific Tasks The Contractor shall provide all labor, certified personnel, calibrated equipment, and materials necessary to perform the scheduled tasks outlined below. All frequencies and procedures must strictly adhere to UFM 3-570-06. Task 1: GACP Test Measurements (Ref: UFM 3-570-06, Table 3-1) • Action: Annotate the soil condition, and perform Potential Measurement at Each Test Station. • Requirements, Locate reference electrode and take: • One S/E potential measurement with the reference electrode placed directly over/adjacent to the protected structure at the location(s) nearest the anode(s) • One S/E potential measurement with the reference electrode placed directly over/adjacent to the protected structure midway between anode(s) • One anode-to-electrolyte potential measurement with the reference electrode placed directly over/adjacent to the anode with the anode lead disconnected • Anode-to-structure current using (in order of preference): 1) a clamp-on milliammeter, 2) a multimeter measuring millivolts across a calibrated shunt, or 3) a multimeter connected in series measuring milliamperes Task 2: ICCP Rectifier Operational Inspection (Ref: UFM 3-570-06, Table 3-1) • Action: Perform operational inspections on all base rectifiers and impressed current power sources. • Requirements: • Record DC voltage and DC current output. • Verify tap settings and operational status of fuses, diodes, and lightning arrestors. • Perform a visual inspection of the rectifier cabinet, noting any physical damage, pest intrusion, or vegetation overgrowth (per Table 3-2 maintenance criteria). -- 1 of 9 -- 2 Task 3: Pipeline Potential Measurements (Ref: UFM 3-570-06, Table 3-2) • Action: Annotate the soil condition, andpPerform Potential Measurement of Pipeline as described in Requirements below. • Requirements, Locate the reference electrode: • Over the pipeline at all test stations and at all points where the structure can be contacted (where it enters/exits the ground, passes through a pit, or is exposed). • Over the pipeline at least every 1,000 feet (305 meters) for pipelines off the installation. • Over the pipeline at least every 500 feet (152 meters) for pipelines on the installation. Task 4: Ground-Level Water Tank Potential Measurements (Ref: UFM 3-570-06, Table 3- 2) • Action: Annotate the soil condition, and perform Potential Measurement of water storage tanks as described in Requirements below. • Requirements, Locate the reference electrode: • Next to the tank at four equally spaced locations around the tank circumference at compass points or as specified on a drawing. • At a distance one tank radius away from the tank at eight equally spaced locations around the tank circumference. Task 5: Underground Storage Tank Potential Measurements (Ref: UFM 3-570-06, Table 3-2) • Action: Annotate the soil condition, and perform Potential Measurement of underground storage tanks as described in Requirements below. • Requirements, Locate the reference electrode: • Over the center and over each end of the tank. • Over each end of the feed/return piping. • Over the manhole, fill pipe, and vent pipe. • Over all metallic structures in the area if readings indicate an isolated system is shorted to a foreign structure. Task 6: Isolated Structures Potential Measurements (Ref: UFM 3-570-06, Table 3-2) • Action: Annotate the soil condition, and perform Potential Measurement of isolated structures as described in Requirements below. • Requirements, Locate the reference electrode: • Take one S/E potential measurement on each side of all dielectric fittings/couplings without moving the reference electrode. • Note: If the potential difference between measurements on each side of a dielectric coupling is less than 10 mV, verify its integrity using an isolation flange tester. -- 2 of 9 -- 3 Task 7: Structures with Foreign Line Crossings Potential Measurements (Ref: UFM 3- 570-06, Table 3-2) • Action: Annotate the soil condition, and perform Potential Measurement of foreign line crossings as described in Requirements below. • Requirements, Locate the reference electrode: • Over the foreign line at all points where it crosses the protected structure. • Over the foreign line where it passes nearby the anode bed. Task 8: Structures with Cased Crossings Potential Measurements (Ref: UFM 3-570-06, Table 3-2) • Action: Annotate the soil condition, and perform Potential Measurement of foreign line crossings as described in Requirements below. • Requirements, Locate the reference electrode: • Over the protected structure on each side of all casings. • Over each end of the casing on all casings. • Note: If the casing is shorted or partially shorted to the pipeline and the potentials over the pipeline are depressed below the criteria described in UFM 3-570-06-Chapter 2, take document short. Task 9: Waterfront Structure Potential Measurements (Ref: UFM 3-570-06, Table 3-2) • Action: Annotate the tide level, and perform Potential Measurement of waterfront structure as described in Requirements below. • Requirements, take measurements at all permanent reference electrodes, and locate portable reference electrodes: • Adja…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 541330