What this opportunity is
The Department of Defense is seeking sources for cathodic protection survey, inventory, and assessment services under NAICS 541330. This opportunity is likely suited for small businesses specializing in engineering services related to corrosion control and protection. As a Sources Sought notice, this is primarily for market research purposes, meaning interested firms should track the opportunity rather than submit bids at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
Performance Work Statement (PWS)
Project Title: CATHODIC PROTECTION SURVEY/INVENTORY/ASSESSMENT SERVICE CONTRACT
(UFM 3-570-06, Chapter 3 Compliance)
Location: [Insert DoW Installation / Base Name]
Date: 21 Sep 26
1.0 Background & Objective
The Department of War (DoW) installation at [Insert Base Name] utilizes various Cathodic
Protection (CP) systems—both Impressed Current (ICCP) and Galvanic (Sacrificial)—to
prevent the corrosion of critical underground and submerged metallic infrastructure (e.g.,
fuel lines, water tanks, distribution piping).
The objective of this contract is to procure certified NACE/AMPP corrosion technical
services to execute the rigorous schedule of inventory, surveys, assessments, and record-
keeping mandated by UFM 3-570-06, Chapter 3 (Operation and Maintenance).
2.0 Scope of Work & Specific Tasks
The Contractor shall provide all labor, certified personnel, calibrated equipment, and
materials necessary to perform the scheduled tasks outlined below. All frequencies and
procedures must strictly adhere to UFM 3-570-06.
Task 1: GACP Test Measurements (Ref: UFM 3-570-06, Table 3-1)
• Action: Annotate the soil condition, and perform Potential Measurement at Each
Test Station.
• Requirements, Locate reference electrode and take:
• One S/E potential measurement with the reference electrode placed directly
over/adjacent to the protected structure at the location(s) nearest the anode(s)
• One S/E potential measurement with the reference electrode placed directly
over/adjacent to the protected structure midway between anode(s)
• One anode-to-electrolyte potential measurement with the reference electrode
placed directly over/adjacent to the anode with the anode lead disconnected
• Anode-to-structure current using (in order of preference): 1) a clamp-on
milliammeter, 2) a multimeter measuring millivolts across a calibrated shunt, or 3)
a multimeter connected in series measuring milliamperes
Task 2: ICCP Rectifier Operational Inspection (Ref: UFM 3-570-06, Table 3-1)
• Action: Perform operational inspections on all base rectifiers and impressed current
power sources.
• Requirements:
• Record DC voltage and DC current output.
• Verify tap settings and operational status of fuses, diodes, and lightning arrestors.
• Perform a visual inspection of the rectifier cabinet, noting any physical damage,
pest intrusion, or vegetation overgrowth (per Table 3-2 maintenance criteria).
-- 1 of 9 --
2
Task 3: Pipeline Potential Measurements (Ref: UFM 3-570-06, Table 3-2)
• Action: Annotate the soil condition, andpPerform Potential Measurement of Pipeline
as described in Requirements below.
• Requirements, Locate the reference electrode:
• Over the pipeline at all test stations and at all points where the structure can be
contacted (where it enters/exits the ground, passes through a pit, or is exposed).
• Over the pipeline at least every 1,000 feet (305 meters) for pipelines off the
installation.
• Over the pipeline at least every 500 feet (152 meters) for pipelines on the
installation.
Task 4: Ground-Level Water Tank Potential Measurements (Ref: UFM 3-570-06, Table 3-
2)
• Action: Annotate the soil condition, and perform Potential Measurement of water
storage tanks as described in Requirements below.
• Requirements, Locate the reference electrode:
• Next to the tank at four equally spaced locations around the tank circumference at
compass points or as specified on a drawing.
• At a distance one tank radius away from the tank at eight equally spaced locations
around the tank circumference.
Task 5: Underground Storage Tank Potential Measurements (Ref: UFM 3-570-06, Table
3-2)
• Action: Annotate the soil condition, and perform Potential Measurement of
underground storage tanks as described in Requirements below.
• Requirements, Locate the reference electrode:
• Over the center and over each end of the tank.
• Over each end of the feed/return piping.
• Over the manhole, fill pipe, and vent pipe.
• Over all metallic structures in the area if readings indicate an isolated system is
shorted to a foreign structure.
Task 6: Isolated Structures Potential Measurements (Ref: UFM 3-570-06, Table 3-2)
• Action: Annotate the soil condition, and perform Potential Measurement of isolated
structures as described in Requirements below.
• Requirements, Locate the reference electrode:
• Take one S/E potential measurement on each side of all dielectric fittings/couplings
without moving the reference electrode.
• Note: If the potential difference between measurements on each side of a dielectric
coupling is less than 10 mV, verify its integrity using an isolation flange tester.
-- 2 of 9 --
3
Task 7: Structures with Foreign Line Crossings Potential Measurements (Ref: UFM 3-
570-06, Table 3-2)
• Action: Annotate the soil condition, and perform Potential Measurement of foreign
line crossings as described in Requirements below.
• Requirements, Locate the reference electrode:
• Over the foreign line at all points where it crosses the protected structure.
• Over the foreign line where it passes nearby the anode bed.
Task 8: Structures with Cased Crossings Potential Measurements (Ref: UFM 3-570-06,
Table 3-2)
• Action: Annotate the soil condition, and perform Potential Measurement of foreign
line crossings as described in Requirements below.
• Requirements, Locate the reference electrode:
• Over the protected structure on each side of all casings.
• Over each end of the casing on all casings.
• Note: If the casing is shorted or partially shorted to the pipeline and the potentials over
the pipeline are depressed below the criteria described in UFM 3-570-06-Chapter 2,
take document short.
Task 9: Waterfront Structure Potential Measurements (Ref: UFM 3-570-06, Table 3-2)
• Action: Annotate the tide level, and perform Potential Measurement of waterfront
structure as described in Requirements below.
• Requirements, take measurements at all permanent reference electrodes, and
locate portable reference electrodes:
• Adja…
Source: SAM.gov, as posted. Verify the current solicitation before responding.